Jameson Resources Limited · ASX:JAL

Jameson Resources — Mines & Money Conference London 2013

22 slides from Jameson Resources's conference presentation, November 2013

  1. Slide 1: Investor Presentation – Mines & Money Conference London 2013

    INVESTOR PRESENTATION MINES & MONEY CONFERENCE LONDON 2013

  2. Slide 2: Financial Snapshot

    Financial Snapshot Share Capital Price Volume Chart Share Price (November 25th 2013) A$0.26 Shares Outstanding 171m Market Capitalisation A$45m Trading Range (6 month) A$0.21 to A$0.28 Cash Reserves Cash (November 25th 2013) A$3.0m Options and Exchangeable Shares Options (A$0.15 / 0.20 exercise pric

  3. Slide 3: Highly Experienced Management Team

    Highly Experienced Management Team David Fawcett ‐ Chairman • Mining engineer with over 35 years coal experience in western Canada • Proven track record for initiating and advancing new coal mine development • CANADA Awarded the 2012 AMEBC Coal Award for Excellence in Mine Development in the Peace R

  4. Slide 4: Few Coking Coal Basins have Export Potential

    Few Coking Coal Basins have Export Potential MONGOLIA KYRGYZ REPUBLIC RUSSIA WESTERN CANADA • ASX Companies: AKM, GUF • ASX Companies: CLA • ASX Companies: TIG • ASX Companies: JAL , ATU (anthracite) • 11 Mtpa overland exports • No exports • 15 Mtpa seaborne exports • 28 Mtpa seaborne exports • Capt

  5. Slide 5: Crown Mountain – Strategic Location

    Crown Mountain – Strategic Location • The Elk Valley and Crowsnest coal fields offer compelling global opportunities for development of a coking coal project • Teck is the world’s second largest seaborne supplier of metallurgical coal, based on its mines in the Elk Valley and Crowsnest coal fields •

  6. Slide 6: Crown Mountain – Rail to Port

    Crown Mountain – Rail to Port No capacity constraints on rail networks and ports currently undergoing expansion RAIL • Common user railway linking southeast BC to deep water ports in Vancouver: distance to port 1,192km • A new rail siding will be constructed adjacent to the rail that services three

  7. Slide 7: Crown Mountain – Geology and Resources

    Crown Mountain – Geology and Resources DOMAIN Measured Indicated Meas/Ind Inferred (Mt) (Mt) (Mt) (Mt) North Block 7.9 7.1 15.0 0.0 South Block 51.3 0.0 51.3 0.0 Southern Extension 0.0 0.0 0.0 23.7 TOTAL 59.2Mt 7.1Mt 66.3Mt 23.7Mt 7

  8. Slide 8: Crown Mountain – Preliminary Economic Assessment

    Crown Mountain – Preliminary Economic Assessment • Low cost surface mining methods with raw strip ratio of 4.3:1 BCM/tonne which is significantly lower than Teck • Surface mine development will use truck/excavator methods; mining conditions at Crown Mountain will be similar to those at the nearby mi

  9. Slide 9: Crown Mountain – Exploration Program 2013

    Crown Mountain – Exploration Program 2013 • Exploration drilling program to better define coal quality and washability completed ahead of schedule and under budget • Program focused on North and South Blocks and included seven large diameter core holes (150mm) and six reverse circulation holes • Cor

  10. Slide 10: Crown Mountain – Laboratory Flow Sheet

    Crown Mountain – Laboratory Flow Sheet Lab – Receives Apparent Density, SG, Incremental Core Ash, Moisture, Sulphur Sample of Coal and Partings Composite Core Sample & Air Dry SIZE FRACTION DROP SHATTER Dry Screen Analysis @ Dry and Wet Tumbler ANALYSIS TEST 50,25,13,6,2,1,1x0mm Attrition Ash for ea

  11. Slide 11: Crown Mountain – Initial Coal Quality North Block

    Crown Mountain – Initial Coal Quality North Block • Laboratory results from all three large diameter core holes from the North Resource Block have now been received • Washability recovery, which directly correlates to plant yield once adjustments are made for out‐of‐seam dilution and pit loss, conti

  12. Slide 12: Discussion – Additional North Block Results

    Discussion – Additional North Block Results • Representative samples were prepared from all three major seams (8, 9, 10) encountered in hole CM12‐01‐CH, blended in proportions to each seam’s percentage of total resource, and sent to specialized labs for additional testing. • The purpose of this test

  13. Slide 13: Coking Coal Parameters and General Specifications

    Coking Coal Parameters and General Specifications Coal Quality Parameter Crown Mountain General Specs ‐ Global South East BC Total Moisture % (arb) TBD1 Max 10 8‐9 Ash % (db) 8.74 Max 10 8.5 ‐ 9.6 Volatile Matter % (db) 20.85 17 ‐ 35 21 ‐ 27 Sulphur % (db) 0.58 < 1 (typ 0.6) 0.35 – 0.75 Fixed Carbon

  14. Slide 14: Crown Mountain – Environmental Studies

    Crown Mountain – Environmental Studies • Environmental baseline studies are well advanced with the BC MOE required two year monthly water sampling and quality test work scheduled for completion in April 2014 • Hydrologic studies, including the installation of several down‐hole ground water monitorin

  15. Slide 15: Crown Mountain – Timeline

    Crown Mountain – Timeline 2013 2014 2015 ACTIVITY Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Resource Estimate  Preliminary Economic Assessment   Exploration – LDC & RC Drilling program  Coal Quality Testwork Pre‐Feasibility Study Project Description / Terms of Reference EA / Permitting Feasibility including Dr

  16. Slide 16: Peace River Projects – Strategic Location

    Peace River Projects – Strategic Location • 100% ownership of Dunlevy, Carbon East, Peace Reach and Graham River projects within the Peace River coal field • Coal license applications cover 30,203 hectares of prospective ground • Projects along strike from operating coal mines and a number of resour

  17. Slide 17: Dunlevy – Approvals and Work Program Update

    Dunlevy – Approvals and Work Program Update • 8,300ha under review by regulators with large additional area to remain under application • Ministry of Mines has made significant steps towards granting tenure and the Notice of Work which includes up to 34 drill sites • Initial priority exploration tar

  18. Slide 18: Metallurgical Coal – Market Update

    Metallurgical Coal – Market Update • Current metallurgical coal prices are not sufficient to Hard Coking Coal Price Forecasts ¹ meet current costs. Approximately 20% of global 220.0 Range of Street Estimates production is believed to be currently uneconomic 210.0 Consensus 200.0 Wood Mackenzie • Har

  19. Slide 19: Summary

    Summary POSITIONED IN WORLD CLASS Jameson is a pure coking coal Company and owns coal projects within Canada’s prolific METALLURGICAL FIELDS Elk Valley and Peace River coking coal fields Quality projects located proximal to road network and an extensive rail system linking PROXIMAL TO INFRASTRUCTURE

  20. Slide 20: www.jamesonresources.com.au

    www.jamesonresources.com.au AUSTRALIAN OFFICE (Corporate) CANADIAN OFFICE Level 2, 79 Hay Street Suite 800, 1199 West Hastings Street Subiaco, WA 6008 Vancouver, BC V6E 3 T5 T: +61 (8) 9200 4473 T: +1 (604) 629‐8605 E: admin@jamesonresources.com.au

  21. Slide 21: Disclaimer

    Disclaimer This document has been prepared as a summary only, and does not contain all information about the Jameson Resources Limited’s (the “Company”) assets and liabilities, financial position and performance, profits and losses, prospects and the rights and liabilities attaching to the Company’s

  22. Slide 22: Competent Persons Statements

    Competent Persons Statements The information in this presentation that relates to an Exploration Target (as defined under Section 18 of the JORC code), Exploration Results, Mineral Resources or Ore Reserves on the Dunlevy Project is based on information compiled by Mr. Ken MacDonald P.Geo., who is a