Golden Minerals Company · TSX:AUMN
Golden Minerals — Precious Metals Summit, Beaver Creek 2016
20 slides from Golden Minerals's conference presentation, Sep 14, 2016
Slide 1: Corporate Presentation
Corporate Presentation Precious Metals Summit, Beaver Creek September 14, 2016
Slide 2: Cautionary Statements
Cautionary Statements Cautionary Note Regarding Forward Looking Statements: Statements made regarding matters which are not historical facts, such as plans for exploration, resource reports and preliminary economic assessments; anticipated revenue from the oxide plant lease; drill results; strategic
Slide 3: Business Strategy
Business Strategy • Establish Golden Minerals as a mid-tier precious metals mining company, focused on Mexico • Explore properties selected for high grades, low development costs and near-term production • Priority to properties within haulage distance of Golden’s Velardeña mills • Acquire advanced
Slide 4: Precious Metals Focus in Mexico and Argentina
Precious Metals Focus in Mexico and Argentina 3
Slide 5: Principal Projects - Mexico
Principal Projects - Mexico SANTA MARIA • Silver and gold mine RODEO • Golden has right to • Near surface gold acquire deposit • 7,500 tons mined and • Trucking distance to processed since 2015 with Velardeña oxide mill average grades of 338 g/t • Began 2,000m core silver and 0.7 g/t gold drilling p
Slide 6: Santa Maria
Santa Maria • Silver and gold mine near Parral District in southern Chihuahua State • Golden has the right to acquire the property under an option agreement - $1.1 M to complete • NI 43-101 in place (April 2015, Tetra Tech) • Successfully concluded test mining and processing of 7,500 tonnes since 20
Slide 7: Santa Maria – 2016 Activities
Santa Maria – 2016 Activities • Assays from recent 2,200 meter, 24-hole drill program are complete • Next steps: evaluate assays, update resource estimate and complete PEA in Q3 2016 • Requirements to bring property to production: • minor infrastructure changes • power line Santa Maria Grade Silver
Slide 8: Drilling - Santa Maria
Drilling - Santa Maria Exploration 2014 to 2016 Ramp entrance Total 5066 mts in 37 holes 2184 m in 24 underground holes 2882 m in 13 surface holes 7
Slide 9: Long Section - Santa Maria
Long Section - Santa Maria Santa Maria Long Section West East ? ? Grade of vein intercept in drill hole, Ag g/t ? Open Open 8
Slide 10: Rodeo
Rodeo • 1,900 ha gold project located 80 km west of Velardeña; acquired in 2015 • 2,000-meter core drilling program begun in June 2016 • Previous exploration by other Quartz vein outcrop companies has identified a gold- bearing system exposed at surface • Potential future open-pit source of material
Slide 11: Rodeo Progress Report
Progress Report Rodeo • Currently 1200 meters completed in 10 holes • Results from first 6 holes received • 50 meter average thickness of bulk mineralization grades 0.7 g/t Au, 16 g/t Ag based • Higher grade zone up to 2.5 g/t Au over 12 meters average • Initial drilling verifies potentially interes
Slide 12: Rodeo Map showing current drill holes
Map showing current drill holes Rodeo 2016 Drilling to date , 1200 mts in 10 holes
Slide 13: Rodeo Cross section
Cross section Rodeo New hole Ore, Quartz with gold values West New hole East Planning Quartz veins and holewith gold breccias values Planned hole Cretaceus sediments (fm. Mezcalera) Cretaceous sediments (fm. Mezcalera) Tertiary volcanic rocks Tertiary volcanic rocks
Slide 14: Celaya Property Overview
Celaya Property Overview • 5,600 ha silver and gold property located 10 km east of Plata Latina’s Naranjillo silver and gold discovery and 45 km southeast of the historic Guanajuato District in Guanajuato State • High grade epithermal gold and silver mineralization discovered beneath clay-silica alt
Slide 15: Celaya Farm-Out
Celaya Farm-Out • Entered into earn-in agreement with subsidiary of Electrum Global Holdings in August 2016 • Golden received $0.2 million upfront • Electrum to incur exploration expenditures of $0.5M in year one, and can elect to acquire a 60% interest in the property by incurring $2.5M of explorat
Slide 16: Velardeña Overview
Velardeña Overview • 560 ha silver and gold property with two underground mines and two processing plants • Mines on care and maintenance until current metals prices and mine plans indicate sustainable positive operating margin • NI 43-101 PEA (Feb. 2015; Tetra Tech) in place Grade Tonnes Silver Gol
Slide 17: Velardeña Plant Lease
Velardeña Plant Lease • Oxide plant lease: • Initial term of 18 months: July 1, 2015 – December 31, 2016 • Extendable at Hecla’s option for 6 months, and then another 18 months (through December 31, 2018) in exchange for constructing a tailings impoundment expansion • Hecla now processing its intend
Slide 18: Argentina
Argentina • El Quevar silver project, 55,000 ha, Salta Province • 2km strike length; resource remains open to east & west • NI 43-101 resource in place (June 2012, Pincock Allen & Holt) • 32 M oz Ag Indicated • 30 M oz Ag Inferred • Significant exploration conducted: • Over 1,200 meters underground
Slide 19: Key Facts
Key Facts Stock Symbols NYSE MKT: AUMN TSX: AUM Corporate Headquarters Golden, Colorado Stock Price (9.9.2016), 52‐Wk Hi/Lo close (US) $0.81 ($1.07 ‐ $0.15) Shares Outstanding (9.9.2016) 88.9 M Warrant Shares Outstanding 17.6 M Options & Restricted Stock Units 1.7 M KELTIP* Units 0.6 M Shares Outsta
Slide 20: Contact Information
Contact Information Investor Relations Karen Winkler, Director of Investor Relations Phone: 303.839.5060 Email: investor.relations@goldenminerals.com Corporate Headquarters 350 Indiana Street, Suite 800 Golden, Colorado 80401 Tele. 303.839.5060 Corporate website www.goldenminerals.com Transfer Agent
Golden Minerals Company — Precious Metals Summit, Beaver Creek 2016 on 6ix