Slide 1: Scale, Opportunity, Progress Eastern Burkina Faso
For personal use only Scale, Opportunity, Progress Eastern Burkina Faso Aiming for +2 million ounces at +2g/t Au
Slide 2: Disclaimer
For personal use only Disclaimer This presentation contains only a brief overview of Predictive Discovery Ltd and its associated entities (“PDI or Predictive") and their respective activities. The contents of this presentation, including matters relating to the geology of the projects, may rely on v
Slide 3: Predictive Discovery Limited: Scale, Opportunity, Progress
For personal use only PREDICTIVE DISCOVERY LIMITED Scale: •110km greenstone strike length •33km of bedrock gold anomalies •Extensive artisanal workings Opportunity: •>9km of strike in RC drilling to date •High grades in several prospects •Central mill strategy Progress: •105,000m drilling since IPO
Slide 4: Board Members and Capital Structure
For personal use only Board Members Board Members Mr. Phil Harman Non-Executive Chairman Board experience/Discovery track record Mr. Paul Roberts Managing Director Discovery track record/Technology leadership Dr. Tom Whiting Non-Executive Director Former VP Exploration – BHP Billiton Minerals Dr. Bo
Slide 5: East Burkina Faso strategic focus
For personal use only East East Burkina Burkina Faso Faso strategic strategic focus focus West Africa Cote Cote D’Ivoire D’Ivoire Focus New project New project PDI ADU Presentation 2012 Page 5
Slide 6: SCALE: Eastern Burkina Faso Project
For personal use only SCALE: Eastern Burkina Faso Project 100km of greenstone strike in Samira Hill Belt (Samira Hill 2.5Moz) Large gold mineralised systems Many artisanal mining sites PDI ADU Presentation 2012 Page 6
Slide 7: SCALE: Bonsiega Permit Group
For personal use only SCALE: Bonsiega Permit Group Laterite Hill – large new gold field, current focus Many other prospects e.g. Fouli (10m @ 4.6g/t Au) Large areas so far untested PDI ADU Presentation Page 7 2012
Slide 8: SCALE: Laterite Hill Gold Field
For personal use only SCALE: Laterite Hill Gold Field Laterite Hill – Dave New 20km long gold field Broad gold geochemical Madyabari permit anomalies under Sirba permit Sirba River thin cover Prospect 71 (flows in wet season) Large gaps in Prospect 71 LEGEND West Bedrock samples bedrock Lateri
Slide 9: SCALE: Dave Prospect, Laterite Hill
For personal use only SCALE: Dave Prospect, Laterite Hill Multiple gold intercepts on most sections Over 5km long Bulk tonnage open pit target Potential for high grade zones PDI ADU Presentation 2012 Page 9
Slide 10: SCALE: Bangaba Permit
For personal use only SCALE: Bangaba Permit Gold mineralisation on granodiorite contacts High grade drill results At least 8km of bedrock gold anomalies Only 1.2km RC drill tested to date PDI ADU Presentation 2012 Page 10
Slide 11: OPPORTUNITY: One Project
For personal use only OPPORTUNITY: One Project Central mill concept Flat terrain between prospects Existing all weather access to within a few km of major prospects PDI ADU Presentation 2012 Page 11
Slide 12: OPPORTUNITY: Multiple high grade prospects
For personal use only OPPORTUNITY: Multiple high grade prospects Solna: 6m @ 20g/t from 40m 2m @ 56g/t from 56m Tambiri: 5m @ 17g/t from 96m 8m @ 7.3g/t Au from 58m Bongou: 20m @ 4.8g/t from 70m Dave: 26m @ 5.0g/t Au from 26m Prospect 71: 4m @ 7.1g/t Au from 20m Tamboana:
Slide 13: PROGRESS: The statistics
For personal use only PROGRESS: The statistics Since IPO in Dec 2010: 105,000m of drilling (power auger, RC, diamond, air core) including 39,000m of RC RC and diamond drilling on 10 prospects Aeromagnetic surveys on all permits More than 700 km2 of geological mapping PDI ADU Presentation 2012 Pa
Slide 14: PROGRESS: The results
For personal use only PROGRESS: The results Since IPO in Dec 2010: Optimised drill targeting for JORC Resource calculations by: Establishing geological continuity of mineralisation at Dave & Tambiri Revised interpretation for Solna high grade mineralisation Improved understanding of structura
Slide 15: PROGRESS: Extensive reconnaissance drilling at Laterite Hill
For personal use only PROGRESS: Extensive reconnaissance drilling at Laterite Hill 8km gold mineralised strike drilled with RC Dave & Laterite Hill - many intercepts, moderate grades, mostly oxide Higher grades returned from multiple prospects (Bongou, Dave, Tamboana, Koundi, Prospect 71) PDI
Slide 16: PROGRESS: Geological continuity established at Tambiri
PROGRESS: Geological continuity established at Tambiri (Bangaba Permit) For personal use only Shallow plunging shoot Open pittable gold mineralisation Potential for repeats along strike and at depth PDI ADU Presentation 2012 Page 16
Slide 17: PROGRESS: New gold discovery at Bongou
For personal use only PROGRESS: New gold discovery at Bongou 54m @ 2.1 g/t Au including 20m at 4.8g/t Au One hole only at end of last field season Well defined structure open to east and west Structure continues for >1km under cover PDI ADU Presentation 2012 Page 17
Slide 18: PROGRESS: Exploration target defined
For personal use only PROGRESS: Exploration target defined 12Mt to 16Mt at 1.9 to 2.3g/t Au (750,000 to 1.2 million ounces)* Drilled areas only To 70m depth on Laterite Hill Gold Field and 100-180m at Bangaba Based on polygonal calculations of drilled sections or longitudinal projections Maximum
Slide 19: PROGRESS: Next steps
For personal use only PROGRESS: Next steps Prioritise high grade targets e.g Bongou RC and/or diamond drilling of these targets Resource drilling of higher grade prospects PDI ADU Presentation 2012 Page 19
Slide 20: Predictive Discovery Limited: Scale, Opportunity, Progress
For personal use only PREDICTIVE DISCOVERY LIMITED Scale: •110km greenstone strike length •33km of bedrock gold anomalies •Extensive artisanal workings Opportunity: •>9km of strike in RC drilling to date •High grades in several prospects •Central mill strategy Progress: •105,000m drilling since IPO
Slide 21: Predictive Discovery Limited Contact Details
Predictive Discovery Limited For personal use only West African Gold Explorer Contact Details: Level 2, 9 Colin St, West Perth, Western Australia 6005 Telephone: +61 402 857 249 Email: paul.roberts@predictivediscovery.com Website: www.predictivediscovery.com PDI ADU Presentation 2012 Page 21
Slide 22: For personal use only
For personal use only PDI ADU Presentation 2012 Page 22