Contents Disclaimer Snap Shot Progress Since Listing Strategy Pig Iron Project Main Magnetite Layer Resource Statement Work Program Case Studies Investment Case Appendix 1
Slide 3: Disclaimer
Disclaimer The content of information contained in this Presentation has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (“FSMA”). Reliance upon this Presentation for the purpose of engaging in any investment activity may expose an individu
Slide 4: Snapshot
Snapshot Reverse take over of Mercury Recycling Group completed August 2012 Company renamed to Ironveld PLC Shares in Issue 285.6 million Share Price GBP 0.0212 Market Capitalization GBP 6.07 million 3
Slide 5: Solid Progress since listing
Solid Progress since listing Successful on going drilling program since listing Maiden inferred resource on the Farm La Pucella 9.44Mt @ 37.4% Fe Total project resource increased to 42.34 Mt @36,2 % Fe On track to deliver pre feasibility study in early 2013 Further strengthening of board w
Slide 6: Strategy
Strategy Drivers Bushveld Ti Magnetite cannot be exported as Direct Shipping Ore as it is Lower grade than haematite Cannot be used directly in a blast furnace Carries a titanium penalty which outweighs the vanadium bonus In order to maximise value the ore must be processed on site to:
Slide 7: Pig Iron Project
Pig Iron Project Ironveld holds interests in prospecting rights in the Northern Limb of the Bushveld Complex north of Mokopane, South Africa Ironveld will develop a new pig iron plant with associated vanadium and titanium slag by products Ironveld expects to mine its own magnetite resource at
Slide 8: Main Magnetite Layer
Main Magnetite Layer ) Fe,0; % V205% TiO, % SiO, % 10 20 30, 40 50 60 70 80 oo 03 o6 oo 12 18 oO 3 6 9 12 15 18 oO 10 20 30 40 50 Ea 22 22 22 2a t hanging wall gabbro 23 1 23 Lt 23 1 24 24 24 24 MAG 3 massive Ti-mgt 25 25 25 25 26 26 26 26 parting gabbro ar 27 aT 27 = MAG 4 massive Ti-mgt B28 28 28
Slide 9: Resource Statement
Resource Statement Mineral Resource estimations were undertaken on the MML down to a vertical depth of 120 m, at a 30% Fe cut-off. The Mineral Resource has been separately calculated for the massive magnetite layers i.e. MAG3, parting and MAG4 (= MML) and for the MML including the disseminated Ti-
Slide 10: Work Program
Work Program Resource upgrade Resource upgrade from Inferred to from Indicated to Indicated measured Work Program 2013 2014 2015 OCT NOV DEC JAN FEB MAR APR MAY JUN 3rd Qtr 4th Qtr Ist Half 2nd Half Ist Half 2nd Half Exploration Driiling Assay Trenching Testwork Beneficiation Pre reduction Smelting
Slide 11: Investment Case
Investment Case Experienced board with strong track record High quality resource identified Attractive and realistic project economics Infrastructure and logistics to support project Scoping Study complete Pre -feasibility Study in hand completed early 2013 Drill program well advanced
Slide 12: Appendix
Appendix
Slide 13: Pig Iron
Pig Iron Pig Iron lower melting point than that of steel scrap. combined with a denser charge make-up result in lower energy requirements and faster melting time in steel manufacture Two main types of Pig Iron Basic (used for steel making) Foundry (used for grey iron – automotive industr
Slide 14: Pig Iron Prices
100 200 300 400 500 600 700 800 0 2001 M1 2001 M5 2001 M9 2002 M1 2002 M5 2002 M9 2003 M1 2003 M5 2003 M9 2004 M1 2004 M5 2004 M9 2005 M1 Pig Iron Prices 2005 M5 2005 M9 2006 M1 2006 M5 2006 M9 2007 M1 2007 M5 2007 M9 2008 M1 2008 M5 2008 M9 2009 M1 2009 M5 2009 M9 Brazillian Pig iron Prices 2010 M1
Slide 15: New uses for Vanadium
New uses for Vanadium Currently the majority of Vanadium is used in the steel Industry Growth in demand is linked to growth in steel HOWEVER New Demand is anticipated from REDOX batteries The extremely large capacities possible from vanadium redox batteries make them well suited to use in la
Slide 16: Company Structure
Company Structure Ironveld plc (formerly MRG) 100% 100% Mercury Recycling Ironveld Limited Mauritus 100% Ironveld Holdings 100% Ironveld Mining 74% 71% 74% Luge HW Iron Lapon 15
Slide 17: Prospecting Rights Contractual Arrangements
Prospecting Rights Contractual Arrangements Ironveld has contracted with Pan Palladium and Hacra to explore for Magnetite Ore for its own account On completion of the exploration Ironveld will apply for mining rights in the name of Pan Palladium and Hacra with a simultaneous section 11 transfer
Slide 18: Core Drilling
Core Drilling Drilling has continued on the Northern Limb Ti-magnetite layers. Current focussed on HACRA properties 4 rigs in use 61 holes, totalling 3,528m, now completed or in progress. 33 holes have been submitted to Set Point Laboratories for analysis. Results being received monthly
Slide 19: Infrastructure and Logistics
Infrastructure and Logistics Power Pre reduction and hot charging furnace reduces power requirements Eskom have indicated supply by 2014 Water Located close to Glen Alpine Dam; offtake to be negotiated Olifants/Steelpoort Rivers Joint Water forum planned Mokopane supply by 2015 Logisti
Slide 20: Current Exploration
Current Exploration (mene ERR PSA ee ne = =; aie |