Legend Mining Limited · ASX:LEG

Legend Mining — Shareholder Meeting (May 2017)

12 slides from Legend Mining's shareholder meeting presentation, May 18, 2017

  1. Slide 1: Legend Mining Limited Annual General Meeting – 18 May 2017

    ASX:LEG LEGEND MINING LIMITED ANNUAL GENERAL MEETING – 18 MAY 2017 THE CELTIC CLUB

  2. Slide 2: Resolutions and Proxies

    RESOLUTIONS AND PROXIES CHAIRMAN’S RESOLUTIONS FOR AGAINST DISCRETION ABSTAIN DISCRETION 1 Re-election of Michael Atkins as 272,854,151 779,100 500,000 4,184,138 18,000 Chairman 2 Adoption of 154,688,817 779,100 500,000 4,184,138 118,183,334 Remuneration Report 3 Ratification of Grant of Options to

  3. Slide 3: Activities Report – Mark Wilson, Managing Director

    LEGEND MINING LIMITED ANNUAL GENERAL MEETING – 18 MAY 2017 ACTIVITIES REPORT – MARK WILSON, MANAGING DIRECTOR

  4. Slide 4: Disclosure

    DISCLOSURE This is not a disclosure document. Any material used in this presentation is a summary of selected data, and any investor in Legend Mining Limited should refer to all Legend Mining Limited ASX releases and statutory reports before considering to invest in the company. Any forward looking

  5. Slide 5: Project Location

    PROJECT LOCATION Located in northern Fraser Range District 120km NE of Nova 100km S of Tropicana Comprises nine granted exploration licences and three applications covering 2,792km2 Infrastructure access Project potential for - Nova style Nickel-Copper - Tropicana style Gold 5

  6. Slide 6: Rockford Project: Innovative EM

    INNOVATIVE EM  500m line space - 300m x 300m square ‘loops’  High power ~200amp  Unique transmitter – wave type  Reading technique – out of loop ‘slingram’ Cable size High Power EM transmitter Innovative EM System 6 ROCKFORD PROJECT

  7. Slide 7: Rockford Project: Aircore Drilling

    AIRCORE DRILLING GEOLOGY KNOWLEDGE  Depth of Cover  Regolith type  Rock type at Bottom of Hole  Assays  Petrology Samples ready for Assaying Aircore Drillrig 7 ROCKFORD PROJECT

  8. Slide 8: Rockford Project: Moving Loop EM Survey Locations

    MOVING LOOP EM – SURVEY LOCATIONS  First surveys Sept 15  Ongoing  Qualifies for R&D tax rebate ($1.037M 2016)  Area selection from gravity and mag interpretation  Only 5.1% of total project area covered Area N Location “First Pass Exploration Technique” 8 ROCKFORD PROJECT

  9. Slide 9: Rockford Project: Moving and Fixed Loop – Area N

    MOVING AND FIXED LOOP - AREA N  Dec 2015 – Moving Loop identified conductors  May 2017 – Fixed Loop better defines conductors o N1 – 850 x 300m ~ 500m deep ~ 9000S o N2 – 700 x 600m ~350m deep ~ 450S  N1 conductor lies on SE margin of gravity and aeromagnetic features “Fixed Loop enables more Are

  10. Slide 10: Rockford Project: Aircore – Area N

    AIRCORE - AREA N  Lithology  Assays  Petrology  Updip projection of N1 conductor and gravity high Aircore Drill Section at Area N “Anomalous Assays in Regolith and Positive Petrology Report” Aircore Drillhole RKAC068 (61m) at Area N 10 ROCKFORD PROJECT

  11. Slide 11: Future Programmes

    FUTURE PROGRAMMES  RC/Diamond Drilling N1 and N2 and other TBA  Ongoing Moving and Fixed Loop Surveys  Ongoing Aircore Drilling Programmes LEGEND MINING LIMITED ASX:LEG 11

  12. Slide 12: Thank You

    THANK YOU LEGEND MINING LIMITED ASX:LEG

Legend Mining — Shareholder Meeting (May 2017) on 6ix