Manhattan Gold Corporation Limited · ASX:MHC

Manhattan Gold — Manhattan — Australian Uranium Conference 2012

22 slides from Manhattan Gold's conference presentation, Jul 23, 2012

  1. Slide 1: Ponton Uranium Project

    MANHATTAN MANHATTAN CORPORATION LIMITED x AG, N PONT URANIUM PROJECT Jean-Francois Kielt Project Geologist 18 - 19 JULY 2012 ESPLANADE HOTEL FREMANTLE

  2. Slide 2: Disclaimer

    MANHATTAN MANHATTAN CORPORATION LIMITED DISCLAIMER

  3. Slide 3: Competent Persons' Statements

    MANHATTAN MANHATTAN CORPORATION LIMITED COMPETENT PERSONS’ STATEMENTS

  4. Slide 4: Nuclear power and electricity in Europe

    Lowest | $4 Billion” , lectricity & Nuclear Power = Bills ~*~ )Expors *'\— "Emissions in Europe To Italy, Germany BUK per Capita than USA Fe iy LL, Shut Down Last Coal Fired Station in 2004 Source: Whole Earth Discipline (Steward Brand)

  5. Slide 5: 75% nuclear grid

    For personal use only 75% nuclear grid

  6. Slide 6: Business focus, directors and capital

    For personal use only Business Focus Uranium Resource & Mine Development Directors Alan J Eggers Executive Chairman John A G Seton Director Marcello Cardaci Director Company Secretary Sam Middlemas Manager Corp Services Sue Rowles (Experienced Former ASX TOP 200 SMM) Issued Capital 93.3m Shares 9.3m

  7. Slide 7: Share price

    MG Salis pales AU Ue $1.40 ASX Code: MHC $1.30 $150 Current Share Price: $0.155 $1.10 $1.00 $0.90 $0.80 $0.70 $0.60 $0.50 $0.40 $0.30 $0.20 $0.10 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr — May Jun Jul ely’ OR anearTan CURATION Lar

  8. Slide 8: Australian Uranium Deposits

    VANH AIAN DAU HRAWUAN JRANIUN IF BUSES: AUSTRALIAN URANIUM DEPOSITS GARDNER Gardneri| CD Operating Mine RANGE — C ) NORTHERN (Tanami Region) TERRITORY @ JORC Uranium Resource O @ Advanced Uranium Project WESTERN AUSTRALIA | QUEENSLAND SOUTH AUSTRALIA PONTON PROJECT foe J (Eastern Goldfields) “Ail +

  9. Slide 9: Ponton Project Location Map

    PUNIUNT USES ZJ40UKINS Ponton Project Location Map {|__| Exploration Licence Granted {|| Exploration Licence Application © Uranium Deposit ® Uranium Project (mineralisation) "y Palaeochannel Se REE Targets-Cundeelee Carbonatites —s> 20km MANHATTAN CORPORATION LIMITED @ Emperor @ Shogun Mulga Rock Ur

  10. Slide 10: ASX Release March 2011

    For personal use only ASX Release March 2011

  11. Slide 11: Extensive tabular body or sheet of mineralisation

    For personal use only Extensive tabular body or sheet of mineralisation

  12. Slide 12: For personal use only

    For personal use only

  13. Slide 13: Holes

    For personal use only 221 Holes 16 Holes

  14. Slide 14: Carbonaceous sand hosted uranium mineralisation

    = STALLION STSC1228 | ASS2)8 Uranium Activity | U;@8 e Vs e oe __3@Uranium Daughter Activity ____=————. Carbonaceous Sand Hosted Uranium Mineralisation 61m 62m 62m as Gg fee Es 1.0m @ 432ppmU308 ae | 63m ; 4 ee > ee oiled Samay, : ce \

  15. Slide 15: Disequilibrium

    For personal use only +VE Disequilibrium >100ppm >1 to 3? 100ppm ‐VE Disequilibrium <100ppm <1 to 0.5?

  16. Slide 16: Conclusions

    CONGLUSIONS Deposits are young and still mobile Positive disequilibrium at higher grades >100ppm (>1 to 3?) Negative disequilibrium at lower grades <100ppm (<1 to 0.57) Further drill samples being tested for disequilibrium at a range of grades WAT SANT NS SANG 5 P/N VAIZA\I NN I A\ | A\I NWN WUL-AUN

  17. Slide 17: Future Ponton Resource

    FUTURE PONTON RESOURCE? RANKED 10 PONTON PROJECT IR + MP (85Mlb) q S = = DOUBLE 8 RESOURCE RANKED 20 | i i

  18. Slide 18: Operating ISL uranium mine in Australia

    For personal use only OPERATING ISL URANIUM MINE IN AUSTRALIA LOW ENVIRONMENTAL IMPACT, NO MINING, WASTE, DUMPS or HAUL ROADS, SMALL PLANT FOOTPRINT

  19. Slide 19: Recommendations for studies

    4 August 2011 | P e Potential Low Cost ISU e Modest Capex Require RECOMMENDATIONS FOR ¢ Geological ¢ Hydrological ¢ Metallurgical & ¢ Engineering STUDIES NIGNI Usd

  20. Slide 20: 2012/2013 Priorities

    For personal use only 2012/2013 PRIORITIES Access to Key License in QVSNR Resource Definition Drilling Double 8 Stallion South Highway South Ponton Complete Disequilibrium Test Work Maiden Resource Estimates Stallion Highway

  21. Slide 21: ASX Code MHC

    For personal use only ASX Code MHC

  22. Slide 22: Uranium Conference

    MANTIAT TAN GORE Vis rt TT} i 18 - 19 JULY 2012 ESPLANADE HOTEL F FREMANTLE Uranium Conference

Manhattan — Australian Uranium Conference 2012 on 6ix