Abound Energy Inc · CSE:ABND

Abound Energy — Zinc8 Energy Solutions — Investor Presentation (March 2023)

21 slides from Abound Energy's investor presentation, March 2023

  1. Slide 1: Redefining Long-Duration Storage

    REDEFINING LONG-DURATION STORAGE CORPORATE PRESENTATION MARCH 2023 CSE: ZAIR – OTC: ZAIRF – FSE: 0E9 ZINC8 ENERGY SOLUTIONS 10.22 CORPORATE PRESENTATION

  2. Slide 2: Important Disclosures

    IMPORTANT DISCLOSURES • Certain information in this presentation constitutes forward-looking statements under applicable securities laws. Any statements that are contained in this presentation that are not statements of historical fact are forward-looking statements. Forward looking statements are o

  3. Slide 3: Zinc8 Is a Technology-First Leader in the Long-Term Energy Storage Industry

    ZINC8 IS A TECHNOLOGY-FIRST LEADER IN THE LONG-TERM ENERGY STORAGE INDUSTRY Zinc8 Energy Solutions has developed innovative battery technology that uses zinc and air as fuel. Our technology resolves the intermittent and unpredictable nature of renewable energy sources such as wind and solar. With a

  4. Slide 4: Solutions to Address Industry Challenges

    SOLUTIONS TO ADDRESS INDUSTRY CHALLENGES Solutions and Services Provided By Zinc8 Carbon Footprint Grid & Transmission Renewable Energies Instability & Unreliability Curtailment • Peak management, demand reduction • Demand response • Bill management • Backup power • Energy arbitrage Renewable Peak D

  5. Slide 5: How Our Technology Works

    HOW OUR TECHNOLOGY WORKS 21 US patents issued* – 5 pending** Designed to meet ANSI/CAN/UL 1973, ANSI/CAN/UL 9540, UL 9540A 2 3 1 1. Power from the grid or renewable source is used to generate zinc particles in the Zinc Regenerator. Oxygen is released to the atmosphere as a by-product. 2. The zinc pa

  6. Slide 6: Why Our Technology Is Superior

    WHY OUR TECHNOLOGY IS SUPERIOR DURABLE ROBUST SAFE 20,000 Operating Zero capacity fade over Full discharge cycles. Non-flammable and life hours extensive lifetime Same performance non-toxic LOW COST SCALABLE SUSTAINABLE Scalable 100+hrs Energy storage Longer duration Energy capacity easily Stable su

  7. Slide 7: Our Tech Enables Decoupling of Energy and Power

    OUR TECH ENABLES DECOUPLING OF ENERGY AND POWER Lithium Ion Power & Energy Are Coupled CHARGE DISCHARGE (POWER) ENERGY (POWER) Unlike lithium-ion technology, which requires new stacks in order to scale, Zinc8 has completely decoupled the linkage between energy and power. This means that scaling Zinc

  8. Slide 8: Decoupling Drives Scalability

    DECOUPLING DRIVES SCALABILITY Zinc8 battery can be scalable and customizable for different applications with various power/energy requirements from 5 kW to MW-scale High Charge Power Longer Discharge Duration High Discharge Power More Charge Power (kW) More Energy (kWh) More Discharge Power (kW) Cap

  9. Slide 9: Decoupling Drives Scalability

    DECOUPLING DRIVES SCALABILITY Comparison of different technologies for a 100 kW battery system $1,200 We strategically have chosen to target the 6+ hour market $1,100 $1,000 $900 $800 CAPEX ($/kWh) $700 $600 $500 VRB $400 Li-ion By decoupling the linkage between power and energy, $300 Li-ion and usi

  10. Slide 10: Market Validation of Zinc8's Technology

    MARKET VALIDATION OF ZINC8’S TECHNOLOGY Winner of NYC DOB’s 2020 Winner of Real Estate Board of NY Accepted into Accelerator Accepted into Accelerator Innovation Challenge 2022 PropTech Challenge Third Derivative for ClimateTech New York City Department of Building REBNY is New York City’s leading F

  11. Slide 11: Secured Supply Chain with Abundant Raw Materials

    Secured Supply Chain with Abundant Raw Materials Zinc costs remain reasonable versus industry comparatives 80,000 73,150 70,000 60,000 Cost of Raw Material ($/ton) 50,000 Image Credit: K. Cantner, AGI. 40,000 30,000 20,000 15,873 11,905 8,750 10,000 2,573 2,928 0 Zinc Oxide Zinc Metal Zinc Lithium C

  12. Slide 12: A Large and Growing Addressable Market

    A LARGE AND GROWING ADDRESSABLE MARKET (By 2027) Commercial & Industrial Microgrid Distribution Transmission Generation Meter Behind the Meter (BTM) Front of the Meter (FTM) COMMERCIAL UTILITIES & INDUSTRIAL + Multi MWs $337 Billion $475 Billion Guidehouse Insights, ‘Market Data: Utility-Scale Energ

  13. Slide 13: Government Regulation Is Driving Adoption

    GOVERNMENT REGULATION IS DRIVING ADOPTION State GHG Emission Reduction Timeline Washington 95% (of 1990 levels) 2050 Oregon 80% (of 1990 levels) 2050 California 80% (net-zero by 2045) 2050 CO2e Carbon Nevada Net-zero 2050 Emissions Sequestration Montana Net-zero 2045-2050 Colorado 90% (of 2005 level

  14. Slide 14: Zinc8's Business Model & Strategy

    ZINC8’S BUSINESS MODEL & STRATEGY Before Commercializing (Demonstrations) BUSINESS STRATEGY 8kW (80 kWh) Cloud Service 100kW (1.5 Scale-up of 2022 - Provider Project 2023 - MWh) 2024 - Commercialized Collaboration and partnership with large project 2024 100 kW (1 MWh) 2025 NYSERDA Project 2026 produ

  15. Slide 15: Numerous Demonstration Projects Underway

    NUMEROUS DEMONSTRATION PROJECTS UNDERWAY Data Centers Demo with Queens, NYC Univ. at Buffalo (UB), NY Global Cloud Provider STAGE: COMPLETED STAGE: ENG. DESIGN STAGE: ENG. DESIGN 10kW / 80kWh (8-hr duration) 100kW / 1.5MWh (15-hr duration) 100kW / 1MWh (10-hr duration) • DE operates 100+ CHP sites f

  16. Slide 16: Expansion of Manufacturing Capacity Underway

    EXPANSION OF MANUFACTURING CAPACITY UNDERWAY Consulting Firms Engaged for Commercial Development Plan Ramboll Engineering Site reviews, permits/approvals, code review, critical issues analysis, Site selection report. 3 sites under analysis. Deloitte Federal and State tax incentives, research & devel

  17. Slide 17: Roadmap

    ROADMAP 2023 2024 2025 2026 2027 2028 2029 2030 Front of the Behind-The- Meter Application Meter Distributed Renewables • C&I • C&I Markets • Microgrids • Utilities • Global • Global • Global • Global • Building • Building Demo: Fresh Demo: NYPA / Large Meadows To be To be To be To be To be Projects

  18. Slide 18: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM Ron MacDonald Dr. Simon Fan Ph.D, P.Eng Sorin Spinu Mark Baggio Tristan Sloan CEO CTO, VP of Product Management CFO VP of Business Development VP of Engineering Over 35 years of both public Over 19 years’ experience in Over 20 years’ experience Zinc8’s Founding Engineer;

  19. Slide 19: Corporation Strengthened by New Board Members

    CORPORATION STRENGTHENED BY NEW BOARD MEMBERS Bernard Pinsky Q.C. Storm Boswick Chair of the board and a founding director An experienced Founder, Partner, of one of British Columbia’s largest Portfolio Manager(PM), and Sr philanthropic foundations by assets. Senior Managing Director(MD) in Asset pa

  20. Slide 20: As of February 28, 2022

    AS OF FEBRUARY 28, 2022 Shares outstanding 179,094,151 Warrants outstanding 14,145,200 @ $0.30 200,000 @ $0.20 2,571,929 @ $0.21 Options outstanding 1,000,000 @ $0.22 2,188,885 @ $0.32 6,115,000 @ $0.62 Restricted share units 7,744,166 Deferred share units 1,002,904 Fully diluted 205,315,165 Market

  21. Slide 21: Thank You

    THANK YOU Contact Eric Negraeff | Darren Seed Incite Capital Markets T 604-493-2004 investors@zinc8energy.com Zinc8energy.com CSE: ZAIR – OTC: ZAIRF – FSE: 0E9

Zinc8 Energy Solutions — Investor Presentation (March 2023) on 6ix