Abound Energy Inc · CSE:ABND
Abound Energy — Zinc8 Energy Solutions — Investor Presentation (March 2022)
14 slides from Abound Energy's investor presentation, March 2022
Slide 1: Redefining long-duration storage
Redefining long-duration storage. (CSE: ZAIR – OTC: ZAIRF – FSE: 0E9) 1 March, 2022
Slide 2: Important Disclosures
Important Disclosures This presentation contains forward-looking information that involves various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties a
Slide 3: How it Works
How it Works 21 U.S . patents issued and 3 more pending Designed to meet ANSI/CAN/UL 1 973, ANSI/CAN/UL 9540, UL 9540A 3 2 1 1. Power from the grid or renewable source is used to generate zinc particles in the Zinc Regenerator. Oxygen is released to the atmosphere as a by-product. 2. The zinc partic
Slide 4: Technology Advantages
Technology Advantages Durable. Zero capacity fade over extensive lifetime Robust. Full discharge cycles. Same performance. Low cost. The longer the duration requirements, the lower the cost per kWh Safe. Non-flammable and non-toxic Sustainable growth. Stable supply chains for mass manufacturing The
Slide 5: The Lowest Cost For Long-Duration Storage
The Lowest Cost For Long-Duration Storage Cost of Raw Materials Energy-Power Decoupling 80000 71,600 70000 60000 Cost of Raw Material ($/T) 716% High Power 50000 40000 30000 23,369 20000 11,905 10,000 10000 2,573 3,605 0 Lithium-ion Zinc Lithium Carbonate Vanadium Pentoxide (V2O5) Long Duration Jan-
Slide 6: Capital Cost per Installed kWh
Capital Cost per Installed kWh Comparison of different technologies for a 100 kW battery system $1,200 We strategically have chosen to target the 8+ hour market $1,100 $1,000 $900 $800 CAPEX ($/kWh) $700 $600 By decoupling the linkage between $500 Vanadium Redox $400 Li-ion power and energy, and usi
Slide 7: Demonstration Projects Underway
Demonstration Projects Underway Data Centers Demo with University at Buffalo (UB), Surrey, BC Queens, NYC Global Cloud Provider NY Stage: Interconnection Stage: Build Stage: Eng. Design Stage: Eng. Design 40kW / 160kWh 10kW / 80kWh 100kW / 1.5MWh 100kW / 1MWh (4-hour duration) (8-hour duration) (1 5
Slide 8: Latest Market Validation
Latest Market Validation Winners of the NYC DOB’s Accepted into Accelerator Accepted into Accelerator 2020 Innovation Challenge Third Derivative For ClimateTech DOB regulates over 1 M buildings in NYC Finds, funds, hones, and scales the De-risking critical decisions throughout most-promising energy
Slide 9: US GHG Reduction Targets
US GHG Reduction Targets State GHG Emission Reduction Timeline Washington 95% (of 1990 levels) 2050 Oregon 80% (of 1990 levels) 2050 California 80% (net-zero by 2045) 2050 Nevada Net-zero 2050 Montana Net-zero 2045-2050 Colorado 90% (of 2005 levels) 2050 New Mexico 45% (of 2005 levels) 2030 24 state
Slide 10: Expansion Planning 2023
Expansion Planning 2023 Consulting Firms Engaged for Commercial Development Plan Ramboll Engineering Site reviews, permits/approvals, code review, critical issues analysis, Site selection report. 3 sites under analysis. Deloitte Federal and State tax incentives, research & development tax credits, s
Slide 11: Capital Structure
Capital Structure As of March 10, 2022 Shares outstanding 152,218,629 8,070, 188 @ $0.30, expiry Sep 4/2022 Warrants outstanding 800,000 @ $0.50, expiry Feb 10/2023 1,725,000@ $0.54 expiry Feb 24 2023 200,000 @ $0.20, expiry July 27/2023 2,898,552 @ $0.21, expiry Sep 12/2024 Options outstanding 2,41
Slide 12: Zinc8 Team
Zinc8 Team Ron MacDonald Sorin Spinu Chief Executive Officer Chief Financial Officer Dr. Simon Fan Chief Technology Officer & Tristan Sloan VP of Product Management VP of Engineering John McLeod Mark Baggio Lead Software Engineer & VP of Business Development Staff Engineer 12
Slide 13: Recent Board Member Addition
Recent Board Member Addition Tom Chairman Greenbook Capital Hodgson Partners CEO, Lithium Americas Board Position & Senior Positions – Magna International Group President & CEO, - Central Guaranty Trust Executive Vice-president - Canada Permanent Mortgage Corp Vice-President – Canadian Imperial Bank
Slide 14: Contact Information: Thank you
Contact Information: Investor Inquiries: Incite Capital Markets Eric Negraeff/Kristian Schneck 604-493-2004 Thank you investors@zinc8energy.com zinc8energy.com 14
Zinc8 Energy Solutions — Investor Presentation (March 2022) on 6ix