Endurance Gold Corporation · TSXV:EDG
Endurance Gold — Investor Presentation (January 2022)
38 slides from Endurance Gold's investor presentation, January 2022
Slide 1: North American Focused Project Generator
North American Focused Project Generator January 2022 TSX.V: EDG
Slide 2: Corporate Disclosure
2 Corporate Disclosure The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to
Slide 3: Corporate Snapshot
3 Corporate Snapshot Shares Outstanding (Dec. 31, 2021) 127.1m Market Capitalization (C$0.42 – Jan 132 2021) C$53.3m Options (C$0.05 – C$0.34) 6.7m Insiders Warrants (C$0.25 – C$0.50) 7.7m own over 55% Fully Diluted (Dec. 31, 2021) 141.5m Working Capital (Sept. 30, 2021) C$3.4m* * includes marketabl
Slide 4: Highlights and Plans
4 Endurance Gold Corporation HIGHLIGHTS AND PLANS 100% controlled - Drill-ready Gold Projects - top-ranked jurisdictions. Reliance Gold Project, B.C. – Epizonal Orogenic – 2021 Drilling • Next to a former +4 m ounce producer • Three phases of drilling - highlights - 14.08 gpt Gold over 15.24m • 1.5
Slide 5: Reliance Gold Project
5 Reliance Gold Project Bralorne Camp, Gold Bridge, B.C. 4 hour Summer Drive +4 million ounces of production
Slide 6: Reliance Gold Project, Gold Bridge, BC
6 Reliance Gold Project, Gold Bridge, BC 2020 & 2021 Program Highlights “Discovery Stage” Gold Project in a productive gold camp. 1. 100% Option – requires payment of EDG shares, cash, and exploration expenditures - subject to a 1.0% NSR after buydown. 2. Historic Exploration between 1985 and 2008 l
Slide 7: Reliance Gold Project Royal Shear
7 Reliance Gold Project Bralorne Camp, Gold Bridge B.C. Iron Carbonate Treasure Alteration Shear Eagle South Camp Creek Eagle Shear Vista Imperial Bona Diplomat Grey Rock Carpenter Lake Royal Shear
Slide 8: Reliance Gold Results Highlights
8 Reliance Gold Results Highlights Bralorne Camp, Gold Bridge B.C. • ‘Epizonal’ Orogenic structural Gold-Antimony, breccia, silicification & sulphidization • Channel samples including 5.89 gpt Gold over 31.5m and 4.88 gpt Gold over 23.5m • Eagle Zone 2020/21 RC Drill Intersections include; • 14.08 g
Slide 9: Eagle Zone at Eagle Road – Shallow Dipping Shear Zone
9 Reliance Gold Project Eagle Zone at Eagle 3 Road – Shallow Dipping Shear Zone Structural Top of Horizontal Channel Sample with average 4.88 gpt Gold over 23.5 metres
Slide 10: Priority Targets Discovered – about 1.5 km Trend
10 Reliance Gold Project Priority Targets Discovered – about 1.5 km Trend 3.14 gpt Au over 6.7 m DIPLOMAT 16.49 gpt Au over 4.6 m IMPERIAL 13.3 gpt Au over 4.2 m 5.89 gpt Au over 31.5 m EAGLE 4.88 gpt Au over 23.5 m 6.92 gpt Au 8.62 gpt Au over 13.4 m over 24.4 m 15.7 gpt Au EAGLE SOUTH over 24.8 m
Slide 11: Reliance Gold Project, BC – 2020 & 2021 RC Drilling
11 Reliance Gold Project, BC – 2020 & 2021 RC Drilling 1. Completed 51 RC Drill Holes in late 2020 and spring 2021. 2. Spring assay results received by June 2021. 3. Significant gold intersections in 41 of the 51 RC holes with some Excellent results (gold over greater than 3 metres width). 4. EAGLE
Slide 12: Reliance Project – EAGLE – RC Drilling Gold Results
12 Reliance Project – EAGLE – RC Drilling Gold Results Average 4.63 gpt Gold over 16.0 m 8.95 gpt Gold over 3.05 m OPEN
Slide 13: Reliance Eagle Zone – 2021 RC Drilling Section 5635816 N
13 Reliance Eagle Zone – 2021 RC Drilling Section 5635816 N
Slide 14: Reliance Eagle Zone – 2021 RC Drilling Section 5635737 N
14 Reliance Eagle Zone – 2021 RC Drilling Section 5635737 N
Slide 15: Reliance Gold Project, BC – 2021 Diamond Drilling
15 Reliance Gold Project, BC – 2021 Diamond Drilling 1. Completed 22 Diamond Drill Holes between August and November. 2. 16 Diamond Drill holes at the Eagle Area – majority mineralized • Eagle and Eagle South Area – now minimum 400 m trend • 15.7 gpt gold over 24.8 m including 26.96 gpt gold over 4.
Slide 16: Eagle Zone & Eagle South Drill Plan and Key Intercepts
16 Reliance Gold Project Eagle Zone & Eagle South Drill Plan and Key Intercepts
Slide 17: Reliance Eagle Zone 2021 Diamond Drill Section 5635735 N
17 Reliance Eagle Zone 2021 Diamond Drill Section 5635735 N Elevation (m)
Slide 18: Eagle Zone & Eagle South – Longitudinal Section
18 Reliance Gold Project Eagle Zone & Eagle South – Longitudinal Section Section 5635735N
Slide 19: 2021 Drill Core Highlights – Eagle South
19 Reliance Gold Project, BC 2021 Drill Core Highlights – Eagle South NQ Core Diameter
Slide 20: NEW Eagle Road Sampling
20 Reliance Gold Project NEW Eagle 5 Road Sampling 7.01 gpt gold over 1.8 m Representative chip sample Mt. Meager Volcanic Ash 2,400 yrs old New Road Built in October 2021 area with +100 ppb Gold-in-soils
Slide 21: Reliance Gold Project – 2021 Longitudinal Section
Reliance Gold Project – 2021 Longitudinal Section 1.5 km DDH21-20 DDH21-06 DDH21-09 See Highlighted Core Photo Presentation on Endurance Website 21
Slide 22: Reliance Gold Project – 2021 DDH Imperial Zone
22 Reliance Gold Project – 2021 DDH Imperial Zone
Slide 23: Imperial Zone 2021 Drill Cross-Section
23 Reliance Gold Project Imperial Zone 2021 Drill Cross-Section @ 060o
Slide 24: 2021 Drill Core Highlights – Imperial Zone DDH21-009
24 Reliance Gold Project, BC 2021 Drill Core Highlights – Imperial Zone DDH21-009 DDH 21-009 IMPERIAL ZONE 8.47 gpt gold over 24.9 m @164.3m 13.5 gpt Au / 2 m @169m 54.5 gpt Au / 2m @170.7m 4.18 gpt Au / 2m NQ Core Diameter
Slide 25: Option Deal Terms
25 Reliance Gold Project, BC Option Deal Terms Option to own 100% The following optional payments and exploration obligations are required prior to December 31, 2025: 1. C$300,000 cash. ($230,000 remaining) 2. 4 Million Endurance Shares. (3.0 Million remaining) 3. C$3 Million in exploration expendit
Slide 26: Conclusions and The Future
26 Reliance Gold Project, BC Conclusions and The Future 1. An outstanding New Exploration Discovery in an historically productive multi-million ounce Orogenic Gold Camp. 2. Wide pervasive iron-carbonate sericite alteration, sulphidization, breccia, and antimony indicate an “Epizonal” Orogenic settin
Slide 27: Alaska Gold Projects
ENDURANCE GOLD ALASKA GOLD PROJECTS 27
Slide 28: Tintina Gold Province - Alaska & Yukon
28 Tintina Gold Province - Alaska & Yukon Alaska ranks in the Top 5 in Fraser Institute’s Investment Attractive Index Elephant Mountain Map source: USGS Fact Sheet 2007-3061
Slide 29: Alaska Properties – Road Accessible
29 Alaska Properties – Road Accessible Within the Yukon-Tanana Reduced Intrusive-Related Gold District
Slide 30: Elephant Mountain Gold Project
30 Elephant Mountain Gold Project Yukon River Rampart Elephant Property North, Pump, Central & South Targets Trout - Wolverine Property Hutlinana Hot Springs Eureka
Slide 31: Elephant Mountain Gold Project
31 Elephant Mountain Gold Project
Slide 32: Elephant Mountain Project, Alaska
32 ELEPHANT MOUNTAIN PROJECT, Alaska • Own 100% of Elephant Claims - Option to Earn 100% on Trout Claims • Road and State trail accessible in Central Alaska. – Permitted for Drilling • State Mining Claims • Target Similarity to Fort Knox, Golden Summit, Eagle Deposit (Yukon) • Six intrusive hosted g
Slide 33: Airborne Geophysics – 7200 Hz. Resistivity
33 Elephant Mountain Gold Project Airborne Geophysics – 7200 Hz. Resistivity Granodiorite Intrusive 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 34: Intrusive Hosted - Induced Polarization Anomalies
34 Elephant Mountain Gold Project, Alaska Intrusive Hosted - Induced Polarization Anomalies SW Looking West Northwest NE Diamond Drill Hole Modelled Chargeability (mV/V) 0.4 gpt Gold / 147 m Elephant Mtn. includes 0.63 gpt Gold / 48.2 m Fault Zone Deeper Oxidation? & Covered Area North Zone Pump Zon
Slide 35: Chargeability (50m dipole) – N2
35 Elephant Mountain Gold Project Chargeability (50m dipole) – N2 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Elephant Mtn. Fault Zone Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 36: Elephant Mountain Gold Project – Area Geology
36 Elephant Mountain Gold Project – Area Geology Option to 100% South Wolverine Fork Up to 11.65 gpt Gold Zone Up to 11.98 gpt Gold Trout Peak Zone Up to 23 gpt Gold North, Pump & Central Zone IP Chargeability High Anomalies South Zone Drilling: 4.1 gpt Gold over 4.6 m 100% Owned Gold-in-Soil Anomal
Slide 37: Ownership - Option Terms
37 Elephant Mountain Gold Project Eureka – Manley Hot Springs District, Alaska OWNERSHIP - OPTION TERMS 100% Vested on Elephant - Option for 100% on Trout/Wolverine Remaining obligations for the Trout deal include: • Total US$140,000 cash by December 2024 • 200,000 Endurance shares by December 2022
Slide 38: www.endurancegold.com
www.endurancegold.com Robert T. Boyd, P.Geo. is a qualified person as defined in National Instrument 43-101 and supervised the compilation of the information forming the basis for this summary. Suite 520 – 800 West Pender Street Vancouver, BC V6C 2V6 Canada Toll Free Phone: 877-624-2237
Endurance Gold — Investor Presentation (January 2022) on 6ix