    CAPITILISING ON rsonal use only MOMENTUM ACCELERATING EXPLORATION & RESOURCE GROWTH NOOSA - NOVEMBER 11 - 13 2026 ASX: TOR

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT THIS PRESENTATION CONTAINS SUMMARY INFORMATION ABOUT TORQUE METALS LIMITED (ACN 621 122 905) (“TORQUE OR “THE COMPANY”). THE INFORMATION IN THIS PRESENTATION IS OF GENERAL BACKGROUND AND DOES NOT PURPORT TO BE COMPLETE This Presentation, including the information contained in th

  3. Slide 3: Why Torque Metals: Proven Execution & Performance

    Slide 3: Why Torque Metals: Proven Execution & Performance

    WHY TORQUE METALS INVESTMENT HIGHLIGHTS – PROVEN EXECUTION & PERFORMANCE Logged visible gold in RC chip from hole 26HRC135 from 122m to 123m down hole drilled at the HHH Deposit rsonal use only Right team Right location Right ground Proven explorers and Prolific South Kalgoorlie Mineralisation open

  4. Slide 4: Corporate Overview

    Slide 4: Corporate Overview

    CORPORATE OVERVIEW INVESTMENT DASHBOARD BOARD OF DIRECTORS Shares on Issue Share Register rsonal use only 756.5M Board & Management 7% Market Capitalisation (9 November) $133M (at $0.18) Institutional 20% Cash (at 31 October 2026)* $28.4M 12-month share price *Unaudited as at 31 October 2026 Broker

  5. Slide 5: South Kalgoorlie Gold Camp

    Slide 5: South Kalgoorlie Gold Camp

    SOUTH KALGOORLIE GOLD CAMP Significant land holding package in the Ritz Gold Project rsonal use only area (> 1,000km2) Flanked by operating tier-1 mines (Northern Star - Super Pit, Goldfields - St Ives, Westgold - Beta Hunt) ~100km from Kalgoorlie with significant services and infrastructure availab

  6. Slide 6: Ritz Gold Project

    Slide 6: Ritz Gold Project

    RITZ GOLD PROJECT KEY ASSET - 100% TORQUE METALS District-scale 350km² of tenure in the central corridor situated on the Boulder- rsonal use only Lefroy fault corridor with 57km of strike, Mineral Resources on granted MLs Shallow drilling At least 55km of strike on a greenstone belt, minimal drill-t

  7. Slide 7: Funded for Project RPM

    Slide 7: Funded for Project RPM

    Funded for Project RPM A RAPID PATH TO A MILLION OUNCE MRE AT +2.0G/T OVER THE NEXT 2 YEARS1 Aggressive exploration framework, drilling planned for Growth and Discovery rsonal use only Systematically grow the MRE at existing deposits Growth – 40% of planned metres into growing resources • Extensiona

  8. Slide 8: HHH Gold Deposit Growth Drilling

    Slide 8: HHH Gold Deposit Growth Drilling

    HHH GOLD DEPOSIT GROWTH DRILLING Recent drilling results rsonal use only • 4.0m @ 9.74 g/t Au • 1.1m @ 89.64g/t Au Deepest intercept to date, 400m down plunge of existing MRE and 80m below 8.9m @ 17.5 g/t Au Extensional drilling delivering growth results Latest intercept is outside DHEM modelling co

  9. Slide 9: Observation Gold Deposit Growth Drilling

    Slide 9: Observation Gold Deposit Growth Drilling

    OBSERVATION GOLD DEPOSIT GROWTH DRILLING Extensional drilling outside the 2024 MRE immediately produced rsonal use only high-grade results including 3.0m @ 8.82g/t Au, 4.0m @ 3.49g/t Au, 3.0m @ 4.06g/t Au, 2.7m @ 5.2 g/t Au and 1.0m @ 10.64g/t Au Additional drilling occurring, DHEM surveys to follow

  10. Slide 10: Untested Exploration Potential

    Slide 10: Untested Exploration Potential

    27m @ S20 gh Au 20000004 | 9m @ 11,52 g/t Au ORCOOS 2 e RPM project UNTESTED EXPLORATION POTENTIAL 7 | _ REN peoject ‘ ta as 11.0m @ 456.00 g/t Au, | target areas: 26HRCI35: | RPM project : | : target areas “12.0m @ 3.53 g/t Au, 12.0m @ 2. DHDA25 26HDDO10 26PRC295 26HDDO11 \ 1 1.0m @ 8.41 I berger 1

  11. Slide 11: Regional Potential - Further Afield

    Slide 11: Regional Potential - Further Afield

    REGIONAL POTENTIAL - FURTHER AFIELD WHY WE LIKE IT – THE DISCOVERY OPPORTUNITY District-scale footprint: • Multiple interconnected prospects spanning major structural corridors, rsonal use only anchored by the Boulder Lefroy Fault (BLF) and adjacent to tier-one gold ground (St Ives / Victory-defianc

  12. Slide 12: Koolie, Maynards Dam and Kelpie prospects

    Slide 12: Koolie, Maynards Dam and Kelpie prospects

    rsonal use only Koolie (Nth) | Open Mineralised System Maynards Dam (Central) | High-Grade Splay Target Kelpie (Sth) | Open Mineralised System Sheared mafics with outcropping quartz Prominent N-S geophysical structural trap Targeting NW structural breaks for high- 12 veins backed by a +800m soil ano

  13. Slide 13: Regional Potential - Strauss Corridor

    Slide 13: Regional Potential - Strauss Corridor

    REGIONAL POTENTIAL – STRAUSS CORRIDOR Marmaracs Strauss 3 km Surface No historic drilling ▬ 100 mbs rsonal use only ▬ 200 mbs ▬ 300 mbs Strauss (Best results to date include) Max Au ppm Marmaracs • 14.0m @ 2.22 g/t Au from 32m (DHD965) <0.1 1.0 – 3.0 ▬ 400 mbs 1984 drilling results (WAMEX): • 12.0m

  14. Slide 14: News Flow and Catalysts

    Slide 14: News Flow and Catalysts

    TORQUE | news flow and catalysts AGGRESSIVE DRILLING STRATEGY WITH CONTINUOUS UPDATES ON PROGRESS rsonal use only September - December Quarter 26 March - June Quarter 27 September - December Quarter 27 March - June Quarter 28 Drilling Resource Update Discovery HHH ? ? Drilling Updates TENEMENT LANDH

  15. Slide 15: Aggressive Growth and Discovery Plan

    Slide 15: Aggressive Growth and Discovery Plan

    TORQUE | capitalising on momentum AGGRESSIVE GROWTH AND DISCOVERY PLAN rsonal use only Proven explorers Current MRE of Greenfields Focused on and developers 351koz @ 3.1g/t Au exploration systematic MRE applying a rapid with material upside opportunities across Growth and Discovery MRE Growth & the

  16. Slide 16: rsonal use only

    Slide 16: rsonal use only

    rsonal use only

  17. Slide 17: Mineral Resource Table July 2026

    Slide 17: Mineral Resource Table July 2026

    MINERAL RESOURCE1 TABLE | July 2026 TABLE 1 Ritz Gold Project, Global Mineral Resource Estimate Indicated Inferred Total rsonal use only Potential Mining Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Scenario (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) Open Pit Paris 70

  18. Slide 18: Mineral Resource Table July 2026 - Edleston

    Slide 18: Mineral Resource Table July 2026 - Edleston

    MINERAL RESOURCE1 TABLE | July 2026 TABLE 3 Edleston Gold Project Mineral Resource Estimate rsonal use only 1Refer to ASX:ASO Announcement 19 January 2023: Maiden Gold Mineral Resource of 1.5 Moz Au Delineated at Edleston Project, Ontario, Canada 18

  19. Slide 19: Paris Gold Deposit Growth Drilling

    Slide 19: Paris Gold Deposit Growth Drilling

    PARIS GOLD DEPOSIT GROWTH DRILLING Recent results include 12.0m @ 2.20 g/t Au and 2.0m @ 8.45 g/t Au rsonal use only Drilling outside of MRE, designed to test a third structural offset (PL3) has returned an intersection in a hanging wall shear The Company advises that visual estimates of mineral abu

  20. Slide 20: HHH Gold Deposit Growth Drilling

    Slide 20: HHH Gold Deposit Growth Drilling

    HHH GOLD DEPOSIT GROWTH DRILLING Growth drilling outside of MRE rsonal use only intersected high-grade mineralisation - target designed by structural interpretation 11.0m @ 456.00 g/t Au from 122m (26HRC135) – large gold nuggets visible in RC drill sample, interpreted to be potentially drilling with

  21. Slide 21: Edleston Gold Project Key Highlights

    Slide 21: Edleston Gold Project Key Highlights

    EDLESTON GOLD PROJECT KEY HIGHLIGHTS 1,500,000 @ 1.0g/t Au JORC RESOURCE¹ rsonal use only • Systematic exploration controlled by IP geophysical anomalies EXTENSIVE AND PROSPECTIVE LAND AREA • Project controlled by 100% owned subsidiary, Aston Minerals • ~310km² in Abitibi Greenstone Belt, host of ov

  22. Slide 22: Edleston Gold Project Deposit Resource

    Slide 22: Edleston Gold Project Deposit Resource

    Edleston Gold Project 1,500 000oz @ 1.0 g/t Au DEPOSIT RESOURCE Indicated: 14Mt @ 0.9g/t gold Inferred: 34.1Mt @ 1.0g/t gold for 400,200 ounces (29.1%) for 1,099,800 ounces (70.9%) rsonal use only ¹Refer to ASX: ASO Announcement dated 31 October 2024 – September 2024 Quarterly Activities Report ²Ref

  23. Slide 23: Boomerang Nickel-Cobalt Sulphide System

    Slide 23: Boomerang Nickel-Cobalt Sulphide System

    Boomerang Nickel-Cobalt Sulphide System KEY HIGHLIGHTS rsonal use only MINERAL RESOURCES ESTIMATE • Boomerang Nickel-Cobalt project estimated at 1,270 Mt (Indicated + Inferred) at 0.27% Ni and 109 ppm Co (0.30%NiEq¹) at a cut- off grade of (0.265% NiEq¹)² Indicated Mineral Resource • 231 Mt at 0.27%

  24. Slide 24: Torque Metals Limited

    Slide 24: Torque Metals Limited

    rsonal use only TORQUE METALS LIMITED LEVEL 16 / 1 SPRING STREET PERTH WA 6000 ABN 44 621 122 905 admin@torquemetals.com torquemetals.com ASX: TOR

Source: ASX announcement, Nov 11, 2026

More decks from Torque Metals Ltd.

All 21 Torque Metals decks