Torque Metals Ltd. · ASX:TOR
Torque Metals — Mining Americas Forum (September 2026)
25 slides from Torque Metals's conference presentation, Sep 29, 2026
Slide 1: A New High-Grade Gold Growth Story
rsonal use only A NEW HIGH-GRADE GOLD GROWTH STORY Former Spartan team embarks on a new growth chapter at the Ritz Gold Project ASX: TOR Craig Jones | Managing Director | September 2026
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT THIS PRESENTATION CONTAINS SUMMARY INFORMATION ABOUT TORQUE METALS LIMITED (ACN 621 122 905) (“TORQUE OR “THE COMPANY”). THE INFORMATION IN THIS PRESENTATION IS OF GENERAL BACKGROUND AND DOES NOT PURPORT TO BE COMPLETE. This Presentation, including the information contained in t
Slide 3: Why Torque Metals
WHY TORQUE METALS Logged visible gold in RC chip from hole 26HRC135 from 122m to 123m down hole drilled at the HHH Deposit INVESTMENT HIGHLIGHTS – PROVEN EXECUTION & PERFORMANCE rsonal use only Execution Strategy Cornerstone Near Surface, Ex Spartan team asset high-grade executing a clear strategy 1
Slide 4: Corporate Overview and Board of Directors
CORPORATE OVERVIEW BOARD OF DIRECTORS Simon Craig INVESTMENT DASHBOARD Lawson Jones Shares on Issue Share Register Non-Executive Managing Director rsonal use only Chairman & CEO 624.9M (Geologist) (Mining Engineer) Board & Management 8% Market Capitalisation (25 September) David Evan $122M (at $0.19
Slide 5: South Kalgoorlie Gold Camp
SOUTH KALGOORLIE GOLD CAMP Significant land holding package in the Ritz rsonal use only Gold Project area (> 1,000km2) Flanked by operating tier-1 mines (Northern Star - Super Pit, Goldfields - St Ives, Westgold - Beta Hunt) ~100km from Kalgoorlie with highway, rail, power and water crossing site Se
Slide 6: Ritz Gold Project
RITZ GOLD PROJECT KEY ASSET - 100% TORQUE METALS District-scale 350km² of tenure in the central corridor situated on the rsonal use only Boulder-Lefroy fault corridor with 57km of strike, Mineral Resources on granted MLs Shallow drilling At least 55km of strike on a greenstone belt, minimal drill- t
Slide 7: Project RPM
Project RPM STRATEGY FOR A RAPID PATH TO A MILLION OUNCE MRE AT +2.0G/T OVER THE NEXT 2 YEARS1 Aggressive exploration framework, with +70,000m of drilling planned for Growth and Discovery over the next 12 months rsonal use only Systematically grow the MRE at existing deposits Growth – 40% of planned
Slide 8: Paris Gold Deposit Growth Drilling
PARIS GOLD DEPOSIT GROWTH DRILLING Recent drilling outside of MRE, designed to test a third structural offset (PL3) has returned an intersection in a hanging wall shear rsonal use only Possibly representing a splay from another shallow-angle shear as seen higher in the deposit sequence Further DHEM
Slide 9: Paris Gold Deposit High-Grade, Thick Intercepts
PARIS GOLD DEPOSIT HIGH-GRADE, THICK INTERCEPTS UNDERPIN PROJECT QUALITY South Kalgoorlie Exploration Edge 35m @ 14.1 g/t Au rsonal use only from 157m - 494 gm 23PRCDD076 The Signature: The Tech: The Value: High-grade ore DHEM plates Reduces 10m @ 46.6 g/t Au shoots directly linked precisely map exp
Slide 10: HHH Gold Deposit Growth Drilling
HHH GOLD DEPOSIT GROWTH DRILLING First growth drilling outside of MRE rsonal use only intersects high-grade mineralisation - target designed by structural interpretation 11.0m @ 456.00 g/t Au from 122m (26HRC135) – large gold nuggets visible in RC drill sample, interpreted to be potentially drilling
Slide 11: HHH Gold Deposit Growth Drilling
HHH GOLD DEPOSIT GROWTH DRILLING Deepest intercept to date, 115m rsonal use only below MRE and 300m below surface • 8.9m @ 17.5 g/t Au Additional results include • 2.0m @ 7.57g/t Au • 1.0m @ 8.91g/t Au Updated DHEM modelling confirm the intercept is associated with a large-scale mineralised structur
Slide 12: Observation Gold Deposit Growth Drilling
OBSERVATION GOLD DEPOSIT GROWTH DRILLING Extensional drilling outside the 2024 MRE immediately produced high-grade results including 3.0m @ 8.82g/t Au, 4.0m @ 3.49g/t rsonal use only Au, 3.0m @ 4.06g/t Au, 2.7m @ 5.2 g/t Au and 1.0m @ 10.64g/t Au Additional drilling occurring, DHEM surveys to follow
Slide 13: RPM Project Target Areas
rsonal use only RPM Project Target Area RPM Project RPM Project Target Area RPM Project Target Area Target Area RPM Project Target Area 13
Slide 14: Regional Potential - Further Afield
REGIONAL POTENTIAL - FURTHER AFIELD WHY WE LIKE IT – THE DISCOVERY OPPORTUNITY District-Scale Footprint: • Multiple interconnected prospects spanning major structural corridors, rsonal use only anchored by the Boulder Lefroy Fault (BLF) and adjacent to tier-one gold ground (St Ives / Victory-Defianc
Slide 15: Regional Potential – Strauss Corridor
REGIONAL POTENTIAL – STRAUSS CORRIDOR Strauss Marmaracs 3 km Surface No Historic Drilling ▬ 100 mbs rsonal use only ▬ 200 mbs ▬ 300 mbs Strauss Max Au ppm Marmaracs 1984 Drilling results (WAMEX): (Best results to date include) <0.1 1.0 – 3.0 0.1 – 0.5 3.0 – 15.0 ▬ 400 mbs • 14.0m @ 2.22 g/t Au from
Slide 16: Regional Potential – Maynards Corridor
REGIONAL POTENTIAL – MAYNARDS Maynards Dam CORRIDOR Koolie Kelpie 5 km Surface ▬ 100 mbs rsonal use only Shallow, ineffective AC/RAB ▬ 200 mbs Shallow, ineffective AC/RAB ▬ 300 mbs ▬ 400 mbs Koolie 1991 Drilling – No Modern exploration Maynards Dam Kelpie • 8.0m @ 1.4 g/t in (PBC024) ▬ 500 mbs • Out
Slide 17: Regional Potential - Maynards Dam
Regional Potential - Maynards Dam INITIAL RC DRILLING CAMPAIGN UNDERWAY rsonal use only 17
Slide 18: News Flow and Catalysts
TORQUE: News flow and catalysts AGGRESSIVE DRILLING STRATEGY WITH CONTINUOUS UPDATES ON PROGRESS rsonal use only Sep - Dec Qtr 26 Mar - Jun Qtr 27 Sep - Dec Qtr 27 Mar - Jun Qtr 28 Drilling Resource Update Discovery ? ? ? Drilling Updates Tenement landholding review and potential rationalisation to
Slide 19: Aggressive Growth & Discovery Plan
TORQUE: AGGRESSIVE GROWTH & DISCOVERY PLAN PROJECT RPM (RAPID PATH TO 1.0 MOZ) rsonal use only Proven explorers and Current MRE of Focused on Greenfields developers applying a 351koz @ 3.1g/t Au systematic MRE exploration rapid MRE Growth & with material upside Growth and opportunities across Discov
Slide 20: Appendix
20 Appendix Ajuo asn jedosie
Slide 21: Mineral Resource Table – June 2026
Mineral Resource1 Table – June 2026 TABLE 1 Ritz Gold Project, Global Mineral Resource Estimate rsonal use only Indicated Inferred Total Potential Mining Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Scenario (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) Open Pit Paris 70
Slide 22: Edleston Gold Project Key Highlights
Edleston Gold Project KEY HIGHLIGHTS rsonal use only 1,500,000 @ 1.0g/t Au JORC RESOURCE¹ • Systematic exploration controlled by IP geophysical anomalies EXTENSIVE AND PROSPECTIVE LAND AREA • Project controlled by 100% owned subsidiary, Aston Minerals • ~310km² in Abitibi Greenstone Belt, host of ov
Slide 23: Edleston Gold Project Deposit Resource
Edleston Gold Project 1,500 000 Oz @ 1.0 g/t Au DEPOSIT RESOURCE Indicated: 14Mt @ 0.9g/t gold Inferred: 34.1Mt @ 1.0g/t gold for 400,200 ounces (29.1%) for 1,099,800 ounces (70.9%) rsonal use only ¹Refer to ASX: ASO Announcement dated 31 October 2024 – September 2024 Quarterly Activities Report ²Re
Slide 24: Boomerang Nickel-Cobalt Sulphide System
Boomerang Nickel-Cobalt Sulphide System KEY HIGHLIGHTS rsonal use only MINERAL RESOURCES ESTIMATE • Boomerang Nickel-Cobalt project estimated at 1,270 Mt (Indicated + Inferred) at 0.27% Ni and 109 ppm Co (0.30%NiEq¹) at a cut- off grade of (0.265% NiEq¹)² Indicated Mineral Resource • 231 Mt at 0.27%
Slide 25: Torque Metals Limited
rsonal use only TORQUE METALS LIMITED ABN 44 621 122 905 UNIT 1, LEVEL 16, 1 SPRING STREET admin@torquemetals.com PERTH, WA torquemetals.com ASX: TOR 25
Torque Metals — Mining Americas Forum (September 2026) on 6ix