Torque Metals Ltd. · ASX:TOR

Torque Metals — Mining Americas Forum (September 2026)

25 slides from Torque Metals's conference presentation, Sep 29, 2026

  1. Slide 1: A New High-Grade Gold Growth Story

    rsonal use only A NEW HIGH-GRADE GOLD GROWTH STORY Former Spartan team embarks on a new growth chapter at the Ritz Gold Project ASX: TOR Craig Jones | Managing Director | September 2026

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT THIS PRESENTATION CONTAINS SUMMARY INFORMATION ABOUT TORQUE METALS LIMITED (ACN 621 122 905) (“TORQUE OR “THE COMPANY”). THE INFORMATION IN THIS PRESENTATION IS OF GENERAL BACKGROUND AND DOES NOT PURPORT TO BE COMPLETE. This Presentation, including the information contained in t

  3. Slide 3: Why Torque Metals

    WHY TORQUE METALS Logged visible gold in RC chip from hole 26HRC135 from 122m to 123m down hole drilled at the HHH Deposit INVESTMENT HIGHLIGHTS – PROVEN EXECUTION & PERFORMANCE rsonal use only Execution Strategy Cornerstone Near Surface, Ex Spartan team asset high-grade executing a clear strategy 1

  4. Slide 4: Corporate Overview and Board of Directors

    CORPORATE OVERVIEW BOARD OF DIRECTORS Simon Craig INVESTMENT DASHBOARD Lawson Jones Shares on Issue Share Register Non-Executive Managing Director rsonal use only Chairman & CEO 624.9M (Geologist) (Mining Engineer) Board & Management 8% Market Capitalisation (25 September) David Evan $122M (at $0.19

  5. Slide 5: South Kalgoorlie Gold Camp

    SOUTH KALGOORLIE GOLD CAMP Significant land holding package in the Ritz rsonal use only Gold Project area (> 1,000km2) Flanked by operating tier-1 mines (Northern Star - Super Pit, Goldfields - St Ives, Westgold - Beta Hunt) ~100km from Kalgoorlie with highway, rail, power and water crossing site Se

  6. Slide 6: Ritz Gold Project

    RITZ GOLD PROJECT KEY ASSET - 100% TORQUE METALS District-scale 350km² of tenure in the central corridor situated on the rsonal use only Boulder-Lefroy fault corridor with 57km of strike, Mineral Resources on granted MLs Shallow drilling At least 55km of strike on a greenstone belt, minimal drill- t

  7. Slide 7: Project RPM

    Project RPM STRATEGY FOR A RAPID PATH TO A MILLION OUNCE MRE AT +2.0G/T OVER THE NEXT 2 YEARS1 Aggressive exploration framework, with +70,000m of drilling planned for Growth and Discovery over the next 12 months rsonal use only Systematically grow the MRE at existing deposits Growth – 40% of planned

  8. Slide 8: Paris Gold Deposit Growth Drilling

    PARIS GOLD DEPOSIT GROWTH DRILLING Recent drilling outside of MRE, designed to test a third structural offset (PL3) has returned an intersection in a hanging wall shear rsonal use only Possibly representing a splay from another shallow-angle shear as seen higher in the deposit sequence Further DHEM

  9. Slide 9: Paris Gold Deposit High-Grade, Thick Intercepts

    PARIS GOLD DEPOSIT HIGH-GRADE, THICK INTERCEPTS UNDERPIN PROJECT QUALITY South Kalgoorlie Exploration Edge 35m @ 14.1 g/t Au rsonal use only from 157m - 494 gm 23PRCDD076 The Signature: The Tech: The Value: High-grade ore DHEM plates Reduces 10m @ 46.6 g/t Au shoots directly linked precisely map exp

  10. Slide 10: HHH Gold Deposit Growth Drilling

    HHH GOLD DEPOSIT GROWTH DRILLING First growth drilling outside of MRE rsonal use only intersects high-grade mineralisation - target designed by structural interpretation 11.0m @ 456.00 g/t Au from 122m (26HRC135) – large gold nuggets visible in RC drill sample, interpreted to be potentially drilling

  11. Slide 11: HHH Gold Deposit Growth Drilling

    HHH GOLD DEPOSIT GROWTH DRILLING Deepest intercept to date, 115m rsonal use only below MRE and 300m below surface • 8.9m @ 17.5 g/t Au Additional results include • 2.0m @ 7.57g/t Au • 1.0m @ 8.91g/t Au Updated DHEM modelling confirm the intercept is associated with a large-scale mineralised structur

  12. Slide 12: Observation Gold Deposit Growth Drilling

    OBSERVATION GOLD DEPOSIT GROWTH DRILLING Extensional drilling outside the 2024 MRE immediately produced high-grade results including 3.0m @ 8.82g/t Au, 4.0m @ 3.49g/t rsonal use only Au, 3.0m @ 4.06g/t Au, 2.7m @ 5.2 g/t Au and 1.0m @ 10.64g/t Au Additional drilling occurring, DHEM surveys to follow

  13. Slide 13: RPM Project Target Areas

    rsonal use only RPM Project Target Area RPM Project RPM Project Target Area RPM Project Target Area Target Area RPM Project Target Area 13

  14. Slide 14: Regional Potential - Further Afield

    REGIONAL POTENTIAL - FURTHER AFIELD WHY WE LIKE IT – THE DISCOVERY OPPORTUNITY District-Scale Footprint: • Multiple interconnected prospects spanning major structural corridors, rsonal use only anchored by the Boulder Lefroy Fault (BLF) and adjacent to tier-one gold ground (St Ives / Victory-Defianc

  15. Slide 15: Regional Potential – Strauss Corridor

    REGIONAL POTENTIAL – STRAUSS CORRIDOR Strauss Marmaracs 3 km Surface No Historic Drilling ▬ 100 mbs rsonal use only ▬ 200 mbs ▬ 300 mbs Strauss Max Au ppm Marmaracs 1984 Drilling results (WAMEX): (Best results to date include) <0.1 1.0 – 3.0 0.1 – 0.5 3.0 – 15.0 ▬ 400 mbs • 14.0m @ 2.22 g/t Au from

  16. Slide 16: Regional Potential – Maynards Corridor

    REGIONAL POTENTIAL – MAYNARDS Maynards Dam CORRIDOR Koolie Kelpie 5 km Surface ▬ 100 mbs rsonal use only Shallow, ineffective AC/RAB ▬ 200 mbs Shallow, ineffective AC/RAB ▬ 300 mbs ▬ 400 mbs Koolie 1991 Drilling – No Modern exploration Maynards Dam Kelpie • 8.0m @ 1.4 g/t in (PBC024) ▬ 500 mbs • Out

  17. Slide 17: Regional Potential - Maynards Dam

    Regional Potential - Maynards Dam INITIAL RC DRILLING CAMPAIGN UNDERWAY rsonal use only 17

  18. Slide 18: News Flow and Catalysts

    TORQUE: News flow and catalysts AGGRESSIVE DRILLING STRATEGY WITH CONTINUOUS UPDATES ON PROGRESS rsonal use only Sep - Dec Qtr 26 Mar - Jun Qtr 27 Sep - Dec Qtr 27 Mar - Jun Qtr 28 Drilling Resource Update Discovery ? ? ? Drilling Updates Tenement landholding review and potential rationalisation to

  19. Slide 19: Aggressive Growth & Discovery Plan

    TORQUE: AGGRESSIVE GROWTH & DISCOVERY PLAN PROJECT RPM (RAPID PATH TO 1.0 MOZ) rsonal use only Proven explorers and Current MRE of Focused on Greenfields developers applying a 351koz @ 3.1g/t Au systematic MRE exploration rapid MRE Growth & with material upside Growth and opportunities across Discov

  20. Slide 20: Appendix

    20 Appendix Ajuo asn jedosie

  21. Slide 21: Mineral Resource Table – June 2026

    Mineral Resource1 Table – June 2026 TABLE 1 Ritz Gold Project, Global Mineral Resource Estimate rsonal use only Indicated Inferred Total Potential Mining Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Scenario (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) (kt) (g/t) (‘000oz) Open Pit Paris 70

  22. Slide 22: Edleston Gold Project Key Highlights

    Edleston Gold Project KEY HIGHLIGHTS rsonal use only 1,500,000 @ 1.0g/t Au JORC RESOURCE¹ • Systematic exploration controlled by IP geophysical anomalies EXTENSIVE AND PROSPECTIVE LAND AREA • Project controlled by 100% owned subsidiary, Aston Minerals • ~310km² in Abitibi Greenstone Belt, host of ov

  23. Slide 23: Edleston Gold Project Deposit Resource

    Edleston Gold Project 1,500 000 Oz @ 1.0 g/t Au DEPOSIT RESOURCE Indicated: 14Mt @ 0.9g/t gold Inferred: 34.1Mt @ 1.0g/t gold for 400,200 ounces (29.1%) for 1,099,800 ounces (70.9%) rsonal use only ¹Refer to ASX: ASO Announcement dated 31 October 2024 – September 2024 Quarterly Activities Report ²Re

  24. Slide 24: Boomerang Nickel-Cobalt Sulphide System

    Boomerang Nickel-Cobalt Sulphide System KEY HIGHLIGHTS rsonal use only MINERAL RESOURCES ESTIMATE • Boomerang Nickel-Cobalt project estimated at 1,270 Mt (Indicated + Inferred) at 0.27% Ni and 109 ppm Co (0.30%NiEq¹) at a cut- off grade of (0.265% NiEq¹)² Indicated Mineral Resource • 231 Mt at 0.27%

  25. Slide 25: Torque Metals Limited

    rsonal use only TORQUE METALS LIMITED ABN 44 621 122 905 UNIT 1, LEVEL 16, 1 SPRING STREET admin@torquemetals.com PERTH, WA torquemetals.com ASX: TOR 25

Torque Metals — Mining Americas Forum (September 2026) on 6ix