  1. Slide 1: HDIL Creating Value

    Slide 1: HDIL Creating Value

    Inv HDIL Creating Value Microstructures | Megastructures | Infrastructure Housing Development and Infrastructure Ltd.

  2. Slide 2: Company Overview

    Slide 2: Company Overview

    Company Overview ƒ HDIL Group – HDIL listed on BSE/NSE in July 2007 – Over three Decades of expertise in the Real Estate Business – Developed over 100 million sq. ft. area ƒ Company Profile – A major player in Mumbai Realty with 90% land Reserves in the Mumbai Metropolitan Region (MMR) – Total Land

  3. Slide 3: Largest Player in Mumbai Metropolitan Region (MMR)

    Slide 3: Largest Player in Mumbai Metropolitan Region (MMR)

    Largest Player in Mumbai Metropolitan Region (MMR) Virar ƒƒ Vasai-Virar Vasai-Virar belt belt (Part (Part of of Thane Thane Ongoing Projects district) district) Preferred Preferred residential residential destination, destination, well well connected connected withwith rail rail Residential: and roa

  4. Slide 4: Diversified Project Mix - Ongoing Projects

    Slide 4: Diversified Project Mix - Ongoing Projects

    Diversified Project Mix Ongoing Projects Segment wise Project Breakup Ongoing Projects Residential 15% 9.28 mn Commercial 9% 5.43 mn Retail 1% 0.97 mn SRS/Redevelopment 75% 46.89 mn 19 19 Ongoing Ongoing Projects Projects aggregating aggregating 62.57 62.57 million million sq. sq. ft. ft. 3

  5. Slide 5: Residential Projects - Construction Update

    Slide 5: Residential Projects - Construction Update

    Residential Projects- Construction Update Metropolis Meadows 4

  6. Slide 6: Premier - Kurla (W)

    Slide 6: Premier - Kurla (W)

    1 Premier- Kurla (W) Week 4, May 10 Week 3, July 10 Location Kurla (W) Launch Date 6th March, 2009 Total Saleable Area 10,00,000 sq. ft. Average Size 1,000 sq. ft. Type 1 BHK/2 BHK Units offered 1,050 Sold > 95% 5

  7. Slide 7: Galaxy - Kurla (E)

    Slide 7: Galaxy - Kurla (E)

    2 Galaxy- Kurla (E) Week 4, May 10 Week 3, July 10 Location Kurla (E) Launch Date 10th April, 2009 Total Saleable Area 4,75,000 sq. ft. Average Size 600 sq. ft. Type 1 BHK/2 BHK Units offered 450 Sold > 90% 6

  8. Slide 8: Metropolis - Andheri (W)

    Slide 8: Metropolis - Andheri (W)

    3 Metropolis- Andheri (W) Week 4, May 10 Week 3, July 10 Location Andheri (W) Launch Date 20th March, 2009 Total Saleable Area 6,50,000 sq. ft. Average Size 1,500 sq. ft. Type 2 BHK/3 BHK/4 BHK Units offered 414 Sold > 95% 7

  9. Slide 9: Majestic - Bhandup (W)

    Slide 9: Majestic - Bhandup (W)

    4 Majestic- Bhandup (W) Week 4, May 10 Week 3, July 10 Location Bhandup (W) Launch Date 29th October, 2009 Total Saleable Area 13,00,000 sq. ft. Average Size 1,100 sq. ft. Type 2 BHK/3 BHK Units offered 1,000 Sold > 40% 8

  10. Slide 10: Residency Park - Virar (W)

    Slide 10: Residency Park - Virar (W)

    5 Residency Park- Virar (W) Week 4, May 10 Week 3, July 10 Location Virar (W) Launch Date January, 2010 Total Saleable Area 12,50,000 sq. ft. Average Size 650 sq. ft. Type 1 BHK/2 BHK Units offered 728 Sold > 75% 9

  11. Slide 11: Harmony - Goregaon (W)

    Slide 11: Harmony - Goregaon (W)

    6 Harmony- Goregaon (W) Week 4, May 10 Week 3, July 10 Location Goregaon (W) Launch Date May, 2010 Total Saleable Area 43858 sq. ft Average Size 1160-1180 sq. ft Units offered 38 Sold ~ 95% 10

  12. Slide 12: Meadows - Goregaon (W)

    Slide 12: Meadows - Goregaon (W)

    7 Meadows- Goregaon (W) Week 4, May 10 Week 3, July 10 Location Goregaon (W) Launch Date June, 2010 Total Saleable Area 46,00,000 sq. ft Residential Area- Phase 1 10,00,000 sq.ft Average Size 1256 sq. ft Units offered (Phase 1) 652 Sold ~ 75% 11

  13. Slide 13: Commercial Projects - Construction Update

    Slide 13: Commercial Projects - Construction Update

    Commercial Projects- Construction Update Harmony Metropolis 12

  14. Slide 14: HDIL Industrial Park - Virar (W)

    Slide 14: HDIL Industrial Park - Virar (W)

    1 HDIL Industrial Park- Virar (W) Week 4, May 10 Week 3, July 10 Location Virar (E) Launch Date September, 2009 Total Saleable Area 15,00,000 sq. ft. Units offered 1068 Sold ~90- 95% 13

  15. Slide 15: Metropolis - Andheri (W)

    Slide 15: Metropolis - Andheri (W)

    2 Metropolis- Andheri (W) Week 4, May 10 Week 3, July 10 Location Andheri (W) Launch Date July, 2009 Total Saleable Area 10,20,000 sq. ft. Type Lease Model Average Lease Rent ~ Rs. 140/ sq. ft Pre-Leasing ~ 20% 14

  16. Slide 16: Harmony - Goregaon (W)

    Slide 16: Harmony - Goregaon (W)

    3 Harmony- Goregaon (W) Week 4, May 10 Week 3, July 10 Location Goregaon (W) Launch Date May, 2010 Total Saleable Area 65,850 sq. ft Average Size 250-600 sq. ft Units offered 163 Sold ~ 75% 15

  17. Slide 17: MIAL Rehabilitation Project: Uplifting face of Mumbai

    Slide 17: MIAL Rehabilitation Project: Uplifting face of Mumbai

    MIAL Rehabilitation Project: Uplifting face of Mumbai 13 4 3 HIGHLIGHTS 2 ƒ Largest Urban Rehabilitation 22 Scheme in India 8 5 ƒ Rehabilitation > 1 million 9 6 people 11 10 ƒ No. of Hutments – 85,000 approx. 7 1 ƒ Scale similar to Town Planning 21 & Urban Renewal Scheme 12 31 ƒ Vital Public Infrast

  18. Slide 18: Aerial Snapshot of MIAL Phase I Rehab. Sites

    Slide 18: Aerial Snapshot of MIAL Phase I Rehab. Sites

    Aerial Snapshot of MIAL Phase I Rehab. Sites Bhandup 3 N m 0k <1 HIGHLIGHTS Premiere Kurla Bhandup Airport No. of 18,000 – d oa Families 20,000 2000 2500 SR <1 Rehab. Area km LB 1 (Sq. ft.) 6 mn. 0.5 mn. 0.7 mn. Project Premiere Start Date May 08 May 08 Sep 09 Site Vidyavihar Station Work completd >

  19. Slide 19: MIAL Rehabilitation Project - Phase 1

    Slide 19: MIAL Rehabilitation Project - Phase 1

    MIAL Rehabilitation Project- Phase 1 ¾ 8mn sq ft of rehabilitation ¾ 0.5 mn sq ft of amenities ¾ 25,000 apartments ¾ Completed > 75% (in 2 yrs) ¾ Relocation < 3 months 18

  20. Slide 20: Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation Phase 1)

    Slide 20: Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation Phase 1)

    Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation- Phase 1) Sr. No Amenities Features 1. Internal Roads 6m, 9m and 12 m roads to be constructed 2. S.W.D Provided on both sides of the road 3. Electrical Lamp Post 625 nos. 4. Electrical Sub- Station 6 nos. 5. Receiving Station 2000 s

  21. Slide 21: Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation Phase 1)

    Slide 21: Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation Phase 1)

    Amenities for Project Premiere/Galaxy/Majestic (Slum Rehabilitation- Phase 1) i) School ii) Science, Commerce and Arts College iii) I.I.T College 9. Educational Institutions iv) Central Library v) Cafeteria vi) Fine Arts College vii) Appheel Art College i) Police Station ii) Bank iii) Gymnasium and

  22. Slide 22: Virar Rental Housing Project

    Slide 22: Virar Rental Housing Project

    Virar Rental Housing Project HIGHLIGHTS RENTAL RENTAL HOUSING HOUSING SECTOR SECTOR ƒ Largest Rental Housing Scheme in MMR since 1947 ƒ Development of 525 acres aggregating to 56 million sq. ft. of built up area - FSI of 4 ƒ Completion in 4 phases by 2015 ƒ Approx. 40,000 rental units of 160 sq. ft.

  23. Slide 23: Financial Overview

    Slide 23: Financial Overview

    Financial Overview 22

  24. Slide 24: Financial Performance / Ratios

    Slide 24: Financial Performance / Ratios

    Housing Development and Infrastructure Limited Financial Performance/ Ratios Rs. in crores Stand alone Particulars Quarter ended Quarter ended Growth Growth 30/06/2010 30/06/2009 30/06/2010 31/03/2010 Turnover (Net) 450.92 295.35 52.67% 450.92 434.07 3.88% Other Income 34.21 23.27 34.21 30.39 Total

  25. Slide 25: Balance Sheet as at 30-Jun-2010

    Slide 25: Balance Sheet as at 30-Jun-2010

    Housing Development and Infrastructure Limited Balance Sheet as at 30-Jun-2010 31-Mar-2010 (Unaudited) (Audited) Schedule (Amount in Rs.) (Amount in Rs.) SOURCES OF FUNDS Shareholders' funds Share capital A 3,668,426,760 3,588,426,760 Reserves and surplus B 70,992,266,801 66,809,008,378 Share warran

  26. Slide 26: Profit and Loss Account

    Slide 26: Profit and Loss Account

    Housing Development and Infrastructure Limited Profit and Loss Account for the period ended Quarter ended Quarter ended Quarter ended Year ended Schedules 30-Jun-2010 31-Mar-2010 30-Jun-2009 31-Mar-2010 (Unaudited) (Audited) (Unaudited) (Audited) (Amount in Rs.) (Amount in Rs.) (Amount in Rs.) (Amou

  27. Slide 27: Cash Flow Statement

    Slide 27: Cash Flow Statement

    Housing Development and Infrastructure Limited Cash Flow Statement for the period ended Quarter ended 30-Jun-2010 (Unaudited) (Amount in Rs.) A Cash flow from operating activities Net profit before tax 2,782,263,311 Adjustments for : (1) Depreciation 19,155,565 (2) Interest expenses 214,498,579 (3)

  28. Slide 28: Earnings Per Share

    Slide 28: Earnings Per Share

    Earnings Per Share 7.00 6.48 6.00 5.14 4.71 5.00 4.34 3.90 (In Rupees) 4.00 3.00 2.00 1.00 0.00 Jun-09 Sep-09 Dec-09 Mar-10 Jun-10 Consistent Growth

  29. Slide 29: Net Debt

    Slide 29: Net Debt

    Net Debt 4347 4400 4200 4000 (Rs. In Crores) 3800 3533 3600 3400 3251 3264 3163 3200 3000 2800 Jun-09 Sep-09 Dec-09 Mar-10 Jun-10 Net Debt to Equity Ratio < 0.5

  30. Slide 30: Net Profit After Tax

    Slide 30: Net Profit After Tax

    Net Profit After Tax 234.31 250 183.47 200 162.76 148.59 (Rs. In Crores) 150 107.47 100 50 0 Jun-09 Sep-09 Dec-09 Mar-10 Jun-10 Consistent Growth

  31. Slide 31: EBIDTA

    Slide 31: EBIDTA

    EBIDTA 350 301.60 300 257.51 250 215.36 (Rs. In Crores) 207.04 200 139.37 150 100 50 0 Jun-09 Sep-09 Dec-09 Mar-10 Jun-10 Consistent Growth

  32. Slide 32: IFRS Implementation Norms (From F.Y 2011)

    Slide 32: IFRS Implementation Norms (From F.Y 2011)

    IFRS Implementation Norms (From F.Y 2011) • All Real Estate companies to adopt “Project Completion Method of Accounting” from April, 2011 • Most Real Estate companies in India follow “Percentage Completion Method of Accounting” and will undergo a change a change in their method from April, 2011 • Cu

  33. Slide 33: IFRS Implementation Norms (From F.Y 2011)

    Slide 33: IFRS Implementation Norms (From F.Y 2011)

    IFRS Implementation Norms (From F.Y 2011) • HDIL currently has approx Rupees 5000 crores of unrecognised turnover from its residential & commercial vertical (8 residential projects and 4 commercial project) • Residential & commercial projects- been sold more than 75 pc and project cash inflow receiv

  34. Slide 34: Annexure 1: SRS

    Slide 34: Annexure 1: SRS

    Annexure 1: SRS 33

  35. Slide 35: Slum Rehabilitation Scheme

    Slide 35: Slum Rehabilitation Scheme

    Slum Rehabilitation Scheme Initial Stage Second Stage Third Stage Developer appointed/ Lots of allotment of If non-participants do not 70% of dwellers from Co- Developer appoints Scrutiny by sub engineer/ Annexure II & III certified by tenements to participating agree within 15 days, they Op. Hsg. S

  36. Slide 36: Disclaimer

    Slide 36: Disclaimer

    Disclaimer This investor presentation has been prepared by Housing Development and Infrastructure Ltd (“HDIL”). and does not constitute a prospectus or placement memorandum or an offer to acquire any securities. This presentation or any other documentation or information (or any part thereof) delive

  37. Slide 37: Thank You

    Slide 37: Thank You

    HDIL Creating Value Microstructures | Megastructures | Infrastructure Housing Development and Infrastructure Ltd. Thank You