Agrimin Limited · ASX:AMN

Agrimin — Diggers & Dealers Mining Forum 2018

35 slides from Agrimin's conference presentation, August 2018

  1. Slide 1: Investor Presentation Diggers & Dealers Mining Forum 2018

    Investor Presentation Diggers & Dealers Mining Forum 2018

  2. Slide 2: Important Notices and Disclaimers

    Important Notices and Disclaimers Nature of Document This presentation has been prepared as a summary only, and does not contain all information about Agrimin Limited’s (“Agrimin” or “the Company”) assets and liabilities, financial position and performance, profits and losses, prospects, and the rig

  3. Slide 3: Agrimin Highlights

    Agrimin Highlights ➢ Major structural changes to BOTH supply and demand = opportunity for the establishment of a significant new seaborne supplier of SOP ➢ Pre-Feasibility Study demonstrated the potential for the Mackay SOP Project to become the largest and lowest cost seaborne supply ➢ Definitive F

  4. Slide 4: Corporate Overview

    Corporate Overview Capital Structure (as at 6 August 2018) Share Price Chart ASX Code AMN Share Price A$0.86 Positive $1.40 Pre-Feasibility Shares 169.6M Native Title Study Share Rights 8.0M $1.20 Agreement Positive Signed Market Capitalisation A$145.9M Scoping $1.00 Study Cash A$14.4M $0.80 Maiden

  5. Slide 5: Mackay SOP Project

    Mackay SOP Project Western Australia

  6. Slide 6: Project Overview

    Project Overview ➢ Project is situated on the world’s largest undeveloped SOP bearing Project Location & Proposed Infrastructure Corridor salt lake and is 100% owned by Agrimin ➢ Located 785km south of Wyndham Port in Western Australia ➢ Pre-Feasibility Study completed in May 2018 and demonstrated t

  7. Slide 7: Highly Attractive Project Economics

    Highly Attractive Project Economics ➢ Pre-Feasibility Study1 indicates the Mackay SOP Project is a Pre-Feasibility Study Material Assumptions and Outcomes technically and financially robust development proposition Parameter Value Initial Operating Life 20 years Annual SOP Production Rate 426,000t ➢

  8. Slide 8: Operating Costs

    Operating Costs ➢ Agrimin’s AISC of US$256/t will be in the bottom quartile of Operating Cost Estimates (±25%) the global cost curve Parameter US$/t Labour 42.78 All-In Sustaining Cost Breakdown Electricity 47.22 Maintenance & Consumables 10.03 Road Haulage Royalties & & Shiploading Gas & Diesel Fue

  9. Slide 9: Capital Costs

    Capital Costs ➢ Capital cost of US$409M has a post-tax payback period of Capital Cost Estimates (±25%) 4.2 years Parameter US$M Brine Field 28.0 Capital Cost Breakdown Evaporation Pond System 52.6 Camp & Indirects & Process Plant 80.1 Infrastruction Contingecy Trench & Pond Utilities & Equipment 42.

  10. Slide 10: Key Attributes that Support Large-Scale Production

    Key Attributes that Support Large-Scale Production ➢ Potassium and Sulphate mineralisation is dissolved within the hypersaline groundwater (brine) in Lake Mackay Shallow Brine Resources Across the Entire Deposit ➢ Total Mineral Resource1 of 26.1Mt of SOP (drainable porosity) and 264.4Mt of SOP (tota

  11. Slide 11: Project Scale has Growth Potential

    Project Scale has Growth Potential ➢ Mineral Resources are hosted within a single Project Tenement Map contiguous brine deposit across Lake Mackay ➢ Current proposed development covers only 70% of the overall project area, with potential to expand over time ➢ Deepest drill hole on Lake Mackay is 30m

  12. Slide 12: Mineral Resources

    Mineral Resources1 ➢ Shallow Mineral Resources commence at an average of 0.4m beneath the ground surface across the entire deposit ➢ 98 drill holes on a 5km grid provide a strong geological understanding of the deposit ➢ Long-term pumping tests up to 120 days provide a strong basis for the developme

  13. Slide 13: Mine Plan

    Mine Plan ➢ Mine plan predicts an average annual brine extraction Mine Plan – Brine Extraction and Grade rate of 66.3Mm3 at 8.0kg/m3 of SOP over an initial 20 90.0 9.0 year period 80.0 8.0 70.0 7.0 ➢ Mine Plan is based on a portion of the Indicated 60.0 6.0 Mineral Resource to a depth of only 3.0m A

  14. Slide 14: Near Surface Brine Provides Low Resource Risk

    Near Surface Brine Provides Low Resource Risk ➢ Simple and low-cost extraction of Potassium-rich brine via a Proposed Trench Layout (20 Years) shallow on-lake trench system ➢ Trench design optimised to allow natural surface water movement to the feed channel Pilot Trenching on Lake Mackay Investor P

  15. Slide 15: Large On-Lake Area Supports a Sustainable Operation

    Large On-Lake Area Supports a Sustainable Operation ➢ Full-scale evaporation ponds will cover less than 2% of Proposed Evaporation Pond Layout (20 Years) Lake Mackay over the project’s initial 20 year life ➢ Unlined evaporation ponds to have a low capital cost and use of wet harvesters to provide op

  16. Slide 16: Significant Investment in New Regional Infrastructure

    Significant Investment in New Regional Infrastructure ➢ Gas to be supplied via a pipeline connected to the Amadeus Gas Proposed Site Layout Pipeline, proposed under a Build-Own-Operation (BOO) arrangement ➢ Process water to be supplied by a raw water borefield located to the south-east of the proces

  17. Slide 17: Mine-to-Ship Logistics Chain

    Mine-to-Ship Logistics Chain ➢ Supply and demand fundamentals for SOP support the Proposed Quad Road Train Configuration establishment of reliable and large-scale seaborne supply ➢ A dedicated fleet of quad road trains will be loaded via a load-out facility at the process plant Wyndham Port ➢ Road t

  18. Slide 18: High Quality SOP Samples Produced

    High Quality SOP Samples Produced ➢ Process testwork has produced commercial grade SOP samples Simplified Process Flow Diagram (>52% K2O) that exceed industry benchmark grades ➢ Saskatchewan Research Council has completed extensive testwork to validate the conventional SOP production flowsheet SOP S

  19. Slide 19: Long-Term Field Work Underway

    Long-Term Field Work Underway ➢ Long-term field tests commenced in August 2017 and will continue throughout 2018 to support the Definitive Feasibility Study ➢ Pilot scale evaporation trials underway to test the full crystallisation process under site conditions ➢ Environmental and heritage surveys c

  20. Slide 20: Indicative Project Delivery Schedule

    Indicative Project Delivery Schedule 2018 2019 2020 2021 Activity Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Off-take & Project Financing Definitive Feasibility Study Environmental Assessment Front End Engineering Design Regulatory Approvals Site Establishment Trench & Pond Earthworks Plant & Infrast

  21. Slide 21: A Catalyst for Regional Economic Development

    A Catalyst for Regional Economic Development ➢ Agrimin’s proposed US$409M fertilizer operation at Lake Mackay is the only advanced industrial development in this very remote part of Australia ➢ The Mackay SOP Project will create substantial economic and public benefits for Australia’s central desert

  22. Slide 22: Sulphate of Potash (SOP)

    Sulphate of Potash (SOP) Specialty Fertilizer for Modern Agriculture

  23. Slide 23: Overview of Fertilizers

    Overview of Fertilizers ➢ Fertilizers provide three macronutrients that every crop needs: ➢ Nitrogen (N) – the most important for healthy plant growth, such as leaf size, colour and yield ➢ Phosphorus (P) – vital for photosynthesis and enhances stem durability ➢ Potassium (K) – essential to increase

  24. Slide 24: Potash Overview

    Potash Overview ➢ 90% of all potash production is in the form of MOP (muriate of potash) which contains 46% chloride ➢ SOP is chloride-free and vital for cash crops, such as fruits and vegetables. SOP improves nutritional value, taste and appearance of crops ➢ Global SOP market is 7Mtpa and valued a

  25. Slide 25: Robust Outlook for SOP Prices

    Robust Outlook for SOP Prices ➢ SOP demand in China has more than tripled since 2007 and was met with a tripling in supply… but future supply growth is not apparent ➢ Long-term SOP prices will be supported by major structural trends: 1. Strong demand caused by: • Increasing area under cultivation fo

  26. Slide 26: Strong China SOP Prices

    Strong China SOP Prices ➢ SOP prices in China have increased by >30% in the China SOP Price – 2 Year History last 2 years due to strong demand growth and 650 3,600 rising production costs 600 3,400 550 3,200 ➢ Latest public price is US$478/t for Powder SOP and 500 3,000 US$502/t for Granular SOP (52

  27. Slide 27: SOP Demand has Experienced Major Structural Change

    SOP Demand has Experienced Major Structural Change Traditional Farmer Evolving Farmer 2009 2018 Source: Yara, Google Earth Investor Presentation | Diggers & Dealers Mining Forum 2018 27

  28. Slide 28: SOP Supply has also Experienced Major Structural Change

    SOP Supply has also Experienced Major Structural Change ➢ 3 major salt lake projects have been built in China in 2018 Forecast SOP Production of Major Producers1 the last 10 years to meet the increased SOP demand: 2,000,000tpa ➢ CITIC Guoan Group at Xitai Jinair salt lake (2012) 1,800,000tpa Salt La

  29. Slide 29: An Emerging SOP Supply Gap in China

    An Emerging SOP Supply Gap in China ➢ China’s demand for SOP has grown from 1.2Mtpa in 2007 to 4.0Mtpa in 2017. China now provides over 50% of current global demand ➢ This demand growth has been met by increased domestic production of SOP from new salt lake operations in China ➢ For the first time i

  30. Slide 30: Tightening Environmental Controls are Impacting SOP

    Tightening Environmental Controls are Impacting SOP ➢ There is approximately 3.2Mtpa of SOP Mannheim capacity ➢ More than 40% of China’s SOP supply comes from the throughout China, which produced a total of 1.7Mtpa in 2017 conversion of MOP to SOP using the Mannheim Process Mannheim Process: ➢ Stric

  31. Slide 31: Compelling Investment Case for New Seaborne SOP Supply

    Compelling Investment Case for New Seaborne SOP Supply ➢ Agrimin is aiming to become the largest and lowest cost supplier of seaborne SOP 2017 Global SOP Cost Curve (FOB) ➢ Major industry opportunity to replace high-cost Mannheim production in China ➢ Australia has the advantages of low geopolitical

  32. Slide 32: Office Contact

    Office Contact: 2C Loch Street Nedlands, Western Australia 6009 Australia T: +61 8 9389 5363 E: admin@agrimin.com.au W: www.agrimin.com.au Investor Relations Contact: Mark Savich Chief Executive Officer M: +61 402 746 757 E: msavich@agrimin.com.au Media Contact: Michael Vaughan Fivemark Partners M:

  33. Slide 33: Appendix 1. Key People

    Appendix 1. Key People Board of Directors Key Technical Personnel Mark Savich | Chief Executive Officer Tom Lyons | General Manager Financial analyst (CFA) with 14 years of experience in the resources Geologist with experience in a range of commodities including industrial minerals, metals and bulks

  34. Slide 34: Appendix 2. Mineral Resources Statement (JORC Code 2012)

    Appendix 2. Mineral Resources Statement (JORC Code 2012) Mineral Resource – April 2018 (Total Porosity) Category State Depth (mbgs) Volume (Mm3) Average Total Porosity SOP Grade (kg/m3) Contained SOP (Mt) Indicated WA 0.40 – 11.25 24,182 46.1% 8.3 92.2 WA 0.40 – 11.25 2,627 46.0% 8.2 9.9 NT 0.40 – 1

  35. Slide 35: Appendix 3. Climate

    Appendix 3. Climate ➢ Arid climate of Lake Mackay is excellent for solar evaporation of brines ➢ Project is located in the highest solar radiation zone in the country with an evaporation rate of between 3,200mm to 3,400mm per year ➢ Project area has an average rainfall of 280mm per year Average Annu

Agrimin — Diggers & Dealers Mining Forum 2018 on 6ix