Linq Minerals Limited · ASX:LNQ
Linq Minerals — Investor Presentation (June 2026)
21 slides from Linq Minerals's investor presentation, Jun 12, 2026
Slide 1: Gilmore Gold Copper Project Investment Showcase
ASX :LNQ For personal use only GILMORE GOLD COPPER PROJECT ASX :LNQ Gold Coast June 2026 Investment Showcase
Slide 2: Important Notice
Important Notice ASX :LNQ Nature of Document : This presentation has been prepared and issued by LinQ Minerals Limited (ACN 665 642 820 ) (LinQ or the Company) to provide general information about the Company . The information in this document is in summary form and contains only a synopsis of more
Slide 3: Corporate Overview
Corporate Overview ASX :LNQ Corporate Structure Substantial Shareholders Shares on Issue ~205.1m Woodcross Holdings Pty Ltd 41.71% Unlisted Options 1 ~35.2m Sam Investors Pty Ltd 10.29% Performance Rights ~0.6m Michael Gibson 10.03% For personal use only Share Price 2 30.0c Top 10 Shareholders 69.68
Slide 4: Investment Proposition: A Generational Asset
Investment Proposition: A Generational Asset ASX :LNQ For personal use only Strategic Asset Significant Scale Growth Tier 1 Location Global JORC MRE 6 JORC Resources 100% owned Au Cu Project ~516Mt +20 mineralised prospects 1 Extensive target pipeline Not publicly visible for ~40 yrs ~3.7Moz Au & ~1
Slide 5: Project resources and Cu occurrences
Gilmore Project 279Mt @ 0.34% CuEq 0.25% Cu, 0.12g/t Au, 35 ppm Mo Longest strike ~40km of continuous Cu Au ASX :LNQ occurrences in the Macquarie Arc North Red: Resources Dark Blue: >0.5% Cu Orange: Cu occurrences Light Blue: >0.1% Cu For personal use only 41Mt @ 0.50% CuEq 0.29% Cu, 0.25g/t Au, 35
Slide 6: Project & Historical Drilling
Gilmore Project & Historical Drilling ASX :LNQ Southern Development Zone North Central Zone Gidginbung (3.3km strike) Monza • 40m @ 2.8g/t Au from 80m • 150m @ 1.02%Cu, 0.75g/t Au from 65m • 101m @ 2.1g/t Au from 90m • Incl. 12.7m @ 8.9% Cu, 6.15g/t Au • 77m @ 1.7g/t Au from 95m from 127m • 76m @ 1.
Slide 7: Dam Drill Results
Dam Drill Results Significant thick, shallow mineralisation ASX :LNQ TDRCD001 (Dam) • 144m @ 1.00g/t Au Eq (0.55g/t Au, 0.36% Cu) from 84m TDRCD002 (Dam) • 142m @ 1.01g/t Au Eq (0.50g/t Au, 0.41% Cu) from 121m TDRCD003 (Dam) For personal use only • 130m @ 1.00g/t Au Eq (0.53g/t Au, 0.38% Cu) from 10
Slide 8: South – Large Growth Opportunity
Gilmore South – Large Growth Opportunity ASX :LNQ • Gidginbung/Dam part of much larger system . >6km strike – limited drilling to date • Significant potential for additional porphyry and epithermal resources/ discoveries. • >6km long strike. Comparable to Cadia complex. • NW "arc transfer" structure
Slide 9: Central Zone – 17km trend
Gilmore Central Zone – 17km trend ASX :LNQ • 3 JORC Resources: >17km strike – multiple drill targets o Mandamah: 41Mt @ 0.50% CuEq o Culingerai: 43Mt @ 0.42% CuEq o Estoril: 33Mt @ 0.37% CuEq For personal use only • >17km strike length • Part of a much larger system? • Multiple advanced drill prospe
Slide 10: Central Zone long section to west
Gilmore Central Zone long section to west ASX :LNQ Open along strike and at depth >10km For personal use only Estoril Monza Cullingerai Mandamah Donnington 2x vertical scale, Cu above 0.1% in drill holes 10
Slide 11: Monza target – Open and High Grade
Monza target – Open and High Grade ASX :LNQ • Maiden drilling campaign commenced – assays pending • High grade porphyry related copper -gold mineralisation • 150m @ 1.02%Cu, 0.75g/t Au • Including 12.7m @ 8.9% Cu, 6.15g/t Au • Open along strike north and south and at depth For personal use only • Sh
Slide 12: Mandamah – Central Zone
Mandamah – Central Zone ASX :LNQ For personal use only Core photos from MDACD001. Left 187.5m. Potassium feldspar, magnetite and biotite altered diorite porphyry hosting quartz veined, bornite, chalcopyrite and pyrite mineralised stockwork 0.44g/t Au & 0.42% Cu Right 293.4m. Magnetite, biotite alter
Slide 13: Donnington – Newest Discovery, Not Yet in Resources
Donnington – Newest Discovery, Not Yet in Resources ASX :LNQ Commentary • Gold rich porphyry system. • TMMRD046 - 125m @ 0.6%CuEq (Inc 44m @ 1.2%CuEq) • TMMRD011 - 77m @1% CuEq • Drilling to date intersected volcanic hosted sheeted quartz - (long section view to the west) For personal use only magne
Slide 14: Central Zone - Larger System?
Central Zone - Larger System? (long section view to the west) ASX :LNQ Mandamah Donnington 1.5km 134m @ 0.8% CuEq 59m @ 0.5% CuEq For personal use only OPEN 150m @ 0.8% CuEq 63m @ 0.5% CuEq 40m @ 2.4% CuEq 81m @ 0.8% CuEq 105m @ 0.9% CuEq 40m @ 0.7% CuEq CuEq *thickness CuEq*thickness OPEN 77m @ 1.0
Slide 15: Yiddah – Northern Zone - Significant Scale
Yiddah – Northern Zone - Significant Scale • Very large copper -gold -molybdenum system (>2km strike). ASX :LNQ • Drill spacing nominally 200 -300m (up to 600m along strike). • Significant drill intercept widths. • Potential to yield a very large open pit operation in its own right. • Open along str
Slide 16: Northern Zone long section to east
Gilmore Northern Zone long section to east ASX :LNQ Open along strike and at depth Yiddah Cu deposit For personal use only Anomalous shallow Cu Anomalous shallow Cu Open: no effective drilling >5kms 2x vertical scale Cu above 0.1% 16
Slide 17: Project – Summary
Gilmore Project – Summary ASX :LNQ Right rocks - Tier 1 Jurisdiction, infrastructure and skilled labour availability For personal use only Project not publicly visible for ~ 40 years - tenement ownership has previously been fragmented Funded for + 30,000m drill program underway Organic growth - subs
Slide 18: Appendix
For personal use only 18 ASX :LNQ Appendix
Slide 19: South JORC MRE
Gilmore South JORC MRE ASX :LNQ Table 1: Mineral Resources for Gilmore South (Gidginbung & Dam) – Global grade cut off Competent Persons Statement – Mineral Resources The information in this report that relates to Exploration Results and INDICATED INFERRED TOTAL METAL Mineral Resources pertaining to
Slide 20: Project Global JORC MRE
Gilmore Project Global JORC MRE ASX :LNQ Global Resource: 516Mt containing ~3.7Moz Au and ~1.2Mt Cu Competent Persons Statement – Mineral Resources The information in this report that relates to Exploration Results and Mineral Resources pertaining to the Gilmore Project is based on Table 1: Total Mi
Slide 21: Project JORC MRE – Multiple Cut Offs
Gilmore Project JORC MRE – Multiple Cut Offs ASX :LNQ DEPOSIT Cut-off INDICATED INFERRED TOTAL Cu equiv METAL tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t Cu (Kt) Au (Koz) Mo (t) (Kt) Oxide Resources reported to a gold