    Cautionary Statement This presentation contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "anticipate", "believe", "plan", "expect", "inten

  3. Slide 3: JV Ethiopian Assets – Future Cash Flow

    JV Ethiopian Assets – Future Cash Flow Binding LOI11 In February 2019, East Africa Metals executed a binding Letter of Intent (“LOI”) with Tibet Huayu Mining Co., Ltd (“Tibet Huayu”) to advance EAM’s Ethiopian Mining Assets to operation. The LOI for the proposed Joint Venture agreements contemplates

  4. Slide 4: Preliminary Economic Assessments

    Preliminary Economic Assessments Mato Bula Gold Copper, Da Tambuk Gold, and Terakimti Gold Oxide Preliminary Economic Assessment (PEA)10. PEAs Financial Metrics Summary PARAMETER PROJECT Units Mato Bula Da Tambuk Terakimti Mine Plan Tonnes 3,335,000 650,000 1,086,000 Capital Cost US$ (‘000s) 54,200

  5. Slide 5: EAM's Value Equation

    EAM’s Value Equation Market Metrics As of May 21, 2019 Share Price $0.25 Market Capitalization $44.9M Share Structure (as of September 28, 2018) Basic Shares Outstanding 179.5 M Shares issuable from Options (avg. exercise price of $0.175) 26.5 M Shares issuable from Warrants (avg. exercise price of

  6. Slide 6: East Africa Metals

    East Africa Metals East Africa Metals is a mineral exploration company focused on advanced exploration in Africa. The company holds a mining licence for the Terakimti Oxide Gold Project, part of the 70% owned Harvest exploration property in Ethiopia1. The Harvest & Adyabo company also holds mining l

  7. Slide 7: Arabian-Nubian Shield Overview

    Arabian-Nubian Shield Overview Arabian- Arabian The Arabian-Nubian Shield (ANS) is composed of granitoid-greenstone terranes stretching over NE Africa and western Saudi Arabia. The geological characteristics of this assemblage make it highly prospective for VMS and orogenic lode gold deposits, and i

  8. Slide 8: Ethiopian Assets

    Ethiopian Assets Deposit Prospect Sentraley Adi Gozomo Exploration Area1 Exploration Extension Application Areas Mining Licence Areas Awahi N Igub 10 km Adi Goshu Adi Asgedom VTEM09 Adi Nigisti Lihamat Hager Selam Widak Da Tambuk Terakimti Mugnae Andi Adi Million Mato Bula Mayshehagne Zelazle Adyabo

  9. Slide 9: Harvest and Adyabo Project Infrastructure

    Harvest and Adyabo Project Infrastructure Exploration Area1 Exploration Extension Application Areas A paved highway and high Mining Licence Areas voltage powerline pass within 7 kilometres west of the Terakimti deposit, and are roughly equidistant with resources defined at the Adyabo project to the

  10. Slide 10: The Terakimti Deposit

    The Terakimti Deposit A mining licence for the Terakimti Oxide Gold Project was granted in December 2017. Terakimti Adyabo Project1 Harvest Project1 Exploration Area1 Exploration Extension Application Areas 20 kilometres 10 Mining Licence Areas

  11. Slide 11: Terakimti Gold Heap Leach Project

    Terakimti Gold Heap Leach Project Additional PEA Highlights10: ! Average metal production of approximately 17,800 ozs gold per year and 57,250 ozs silver per year. ! Pre-production capital cost of approximately US$17.2 M including contingency of 25% on direct costs 19% on total of direct and indirec

  12. Slide 12: Terakimti Gold Project – Site Layout

    Terakimti Gold Project – Site Layout Local Grid North Waste Rock Roads Gold oxide resource Ponds Open Pit ADR Pad Heap Leach Grid Spacing 250m 12

  13. Slide 13: Terakimti Exploration Potential

    Terakimti Exploration Potential In addition to heap leaching of the Local Grid North gold oxide zone, potential exists to develop supergene gold, silver, and copper, and primary sulphide Open Pit copper, gold, silver, and zinc resources underlying the gold oxide Gold oxide zone. cap Supergene/Transi

  14. Slide 14: Terakimti Mineral Resource Estimate

    Terakimti Mineral Resource Estimate Terakimti Deposit Updated Oxide Mineral Resource Estimate7,9 NSR Cut- Grade Contained Metals Mineralization Mineralization Tonnes Off Au Ag Cu Au Ag Cu Class Type ('000s) ($/t) g/t g/t % ('000 oz) ('000 oz) ('000 lb) Indicated Oxide 15.74 1,110 3.20 23.6 0.08 114

  15. Slide 15: The Mato Bula and Da Tambuk Deposits

    The Mato Bula and Da Tambuk Deposits Mining licences for the Mato Bula Gold Copper and the Da Tambuk Gold Projects were granted in May 2019. Da Tambuk Mato Bula Adyabo Project1 Harvest Project1 Exploration Area1 Exploration Extension Application Areas 20 kilometres 15 Mining Licence Areas

  16. Slide 16: Mato Bula Gold Copper Project

    Mato Bula Gold Copper Project Additional PEA Highlights10: ! Average annual metal production of approximately 34,750 ozs gold, 1.67 million pounds copper and 4,780 ozs silver. ! Pre-production capital cost of US$54.2M million including contingency of 38% on direct costs and 26% on total of direct an

  17. Slide 17: Mato Bula Project – Mine Site Layout

    Mato Bula Project – Mine Site Layout Local Grid North Processing Tailings Plant Containment Open Pit Waste Rock Grid Spacing 500m 17

  18. Slide 18: Mato Bula Project – Resources

    Mato Bula Project – Resources 2016 Indicated Resource6 2016 Inferred Resource6 The current minimum 8 year mine life is based upon an open pit depth of 190m. Drilling has intersected significant mineralization to 370m down dip, leading to potential additional resources which could extend the mine lif

  19. Slide 19: Mato Bula Project – IP Geophysics

    Mato Bula Project – IP Geophysics Anomaly is open grid north and to depth. Anomaly is open grid south and to depth. Additional drilling is planned in this area. In 2017 an I.P./Resistivity/Magnetic survey was conducted over the Mato Bula area. The survey identified a strong chargeability correlation

  20. Slide 20: Da Tambuk Gold Project

    Da Tambuk Gold Project Additional PEA Highlights10: ! Average metal production of approximately 24,000 ozs gold per year and 6,000 ozs silver per year. ! Pre-production capital cost of approximately US$34.1 M including contingency of 36% on direct costs and 26% total of direct and indirect costs. !

  21. Slide 21: Da Tambuk Project – Mine Site Layout

    Da Tambuk Project – Mine Site Layout Local Grid North Undergroun d Processing Developmen Plant t Tailings Waste Rock Containment Indicated Resources Inferred Resources Grid Spacing 500m 21

  22. Slide 22: Da Tambuk Project – Resources

    Da Tambuk Project – Resources The current minimum 4 year mine life is 2016 based on a mine plan depth of 200m. Indicated Resource6 Drilling has intersected significant mineralization to 260m down dip, 2016 Inferred leading to potential additional resources Resource6 which could extend the mine life.

  23. Slide 23: The Mato Bula Trend

    The Mato Bula Trend The Mato Bula Trend is a geologically defined area with anomalous base and precious metal soil values, and prospective alteration similar to that in the deposit areas. Da Tambuk Numerous targets exist along the trend that require systematic exploration follow-up. Additional IP wo

  24. Slide 24: Adyabo Mineral Resource Estimate

    Adyabo Mineral Resource Estimate Adyabo Project Mineral Resource Estimate6 Grade Contained Metals Category Tonnes Au ('000s) Au Cu Ag Au Equiv. Au Cu Ag Equiv.Metal g/t % g/t g/t ('000 oz) (M lb) ('000 oz) (‘000 oz) Indicated 3,215 3.92 0.24 1.4 4.29 408 16.8 132 446 Inferred 5,930 1.43 0.50 2.9 2.2

  25. Slide 25: Adyabo Mineral Resource Estimate

    Adyabo Mineral Resource Estimate Adyabo Project Inferred Mineral Resource Estimate6 Grade Contained Metals Pit Optimized Cut-Off Tonnes Au ($/t) ('000s) Au Cu Ag Au Equiv. Au Cu Ag Equiv.Metal Area g/t % g/t g/t ('000 oz) (M lb) ('000 oz) (‘000 oz) Da Tambuk 23.9 35 4.30 0.08 3.0 4.42 5 0.1 3 5 Mato

  26. Slide 26: Drill Tested Targets

    Drill Tested Targets Deposit Drilled Prospect Sentraley Adi Gozomo Prospect Exploration Area1 Exploration Extension Application Areas Mining Licence Areas Awahi N Igub Adi Goshu Adi Asgedom VTEM09 10 km Adi Nigisti Lihamat Hager Selam Widak Da Tambuk Terakimti Mugnae Andi Adi Million Mato Bula Maysh

  27. Slide 27: Ethiopia

    Ethiopia Ethiopia Ethiopia and Neighbouring Key Projects ! The oldest independent country in Africa, with an economy mostly based in Eritrea agriculture. Bisha (Cu,Zn,Au,Ag) Emba Derho,Debarwa (Cu,Zn,Au) ! A mining-friendly jurisdiction with several Danakhil (Potash) gold, copper, and potash project

  28. Slide 28: Magambazi Project

    Magambazi Project Overview Magambazi Mineral Resource Estimate5 ! Gold project located in the Handeni area of Tanzania Grade Contained Metal ! Project has been sold to a development partner, Mineralization Tonnes Class ('000s) Tanzanian Goldfields Limited, for US$2.0M + 30% Au g/t Au oz production s

  29. Slide 29: Experienced Management Team

    Experienced Management Team Name Position Experience Management Andrew Lee Smith, President, CEO, and ! Professional geologist with over 25 years of mineral exploration and mine development P.Geo, ICD.D Director experience Jeff Heidema, Vice President ! Professional geologist with over 25 years of d

  30. Slide 30: Appendix

    TSX-V:EAM I Appendix _ EAST AFRICA 30 METALS RRs

  31. Slide 31: Presentation Notes

    Presentation Notes 1 Harvest Project as at Jan 10, 2017; West Shire (Adyabo south) as at Oct 13, 2017; Adi Dairo (Adyabo north) as at Jan 24, 2017 2 Subject to a 2% N.S.R. 30% stream based on agreement terms outlined in EAM press releases dated June 15, 2015 and December 10, 2015. As of EAM press re

East Africa Metals — Investor Presentation (June 2019) on 6ix