  1. Slide 1: Paradox Brine Project: Fast Tracking to Production

    Paradox Brine Project: Fast Tracking to Production Battery Materials 2019 12th April 2019 Anson’s First Lithium Carbonate

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this confidential document ("Presentation") has been prepared by Anson Resources Limited (the "Company"). It has not been fully verified and is subject to material updating, revision and further amendment. The Information many not be distributed to others at a

  3. Slide 3: Shareholder Details

    Shareholder Details Apr 2019 # of shares 497m Price $0.073 Market Cap $36m # of shareholders 3,537 ASX: ASN 3

  4. Slide 4: Directors

    Directors Bruce Richardson, B.A (Hons) Peter (Greg) Knox, B.Sc. Michael van Uffelen, B. Com. Alexander Grant, M(Eng) – – Executive Chairman & CEO (Geology) – Director – Director Director § 10 years in exploration, § Experienced Director, § Co-founder of Lilac § Qualified geologist with Solutions Inc

  5. Slide 5: Paradox Brine Project - Location

    Paradox Brine Project - Location Well Known Historic Mining Area: § Existing exploration and mining support infrastructure § Mined for uranium, copper, potash etc and oil & gas § Brines known to exist throughout the Paradox Basin which covers an area 33,000 square miles (85,470km2) in the “Four Corn

  6. Slide 6: Paradox Brine Project - Timeline

    Paradox Brine Project - Timeline Q4 2018 Q1 2019 Q2 2019 Q3 2019 Q4 2019 Q1 2020 Exploration – drilling: Skyline Unit 1 √ Long Canyon No. 2 √ JORC Resource Lithium pilot plants: Design and engineering √ √ Proof of concept - mini pilot plant Li2CO3 product qualification testing Industrial scale, in-f

  7. Slide 7: Paradox Brine Project – Project Area

    Paradox Brine Project – Project Area § Total project area 1,317 claims covering 10,791 hectares (108 sq km) of land, re-entered 4 wells § Fast-track to production: § Oil/gas lease and well at Cane Creek 32-1 (marked by blue arrow), pad for in-field pilot plant § Industrial Lease at Cane Creek § Inst

  8. Slide 8: Paradox Brine Project – Exploration Results

    Paradox Brine Project – Exploration Results Well Clastic Li Br B I Mg Zone Anson’s Results: Skyline Unit 1 31 193.5 4,427 163.8 156.4 13,669 Cane Creek 32-1 31 102 5,041 65.3 97 27,900 Long Canyon No. 2 31 253 2,282 360 138 17,400 Historic Results: Long Canyon No. 1 31 500 6,100 n/a 300 21,000 White

  9. Slide 9: Paradox Brine Project – Test Work

    Paradox Brine Project – Test Work Lilac Solutions – Adsorption Ion Exchange (IX) § Li only extraction process using patented beads § First stage bench top test work extracted Li successfully from the Cane Creek well : § Li2CO3 produced § LiOH produced Li2CO3 § The extraction of the lithium can be co

  10. Slide 10: Paradox Brine Project – Conceptual Flow Sheet

    Paradox Brine Project – Conceptual Flow Sheet Li production test work completed: § Bench top test work established a 80%Li recovery rate § Eluate concentration 16,000 ppm following completion of ion extraction Potential additional revenue streams: § Bench top testwork had the following recoveries: §

  11. Slide 11: Paradox Brine Project – In-field Pilot Plant

    Paradox Brine Project – In-field Pilot Plant § Industrial scale § Design and engineering by Lilac and Hatch underway § Construction of infrastructure commenced ASX: ASN 11

  12. Slide 12: Additional Projects – Utah, USA

    Additional Projects – Utah, USA • Historic high grade vanadium and uranium mineralisation • Rock chip samples up to 13.1% V or 23.38% V2O5 • 418 lode claims, 3,380 hectares • New claims strategically located in the Yellow Cat Mining District Sample Type Vanadium V2O5 Uranium U3O8 (V%) (%) (U%) (%) Y

  13. Slide 13: Additional Projects – Western Australia

    Additional Projects – Western Australia § Ajana – Graphite & Base Metals: § Lead Resource just upgraded to JORC 2012 § Base metals and graphite: § 31 VTEM targets to test § Soil anomalies throughout project area to be tested § 470km north of Perth § Hooley Well Nickel & Cobalt: § Lateritic Ni-Co-Cr

  14. Slide 14: Thank You

    Paradox Brine Project Thank You ASX: ASN 14

  15. Slide 15: Contact Details

    Contact Details Bruce Richardson Executive Chairman and CEO E: brichardson@ansonresources.com T: +61 8 9226 0299 W: www.ansonresources.com twitter.com/anson_ir Linkedin: https://www.linkedin.com/company/13357337/ ASX: ASN 15