Ausquest Limited · ASX:AQD

Ausquest — RIU Conference (February 2007)

28 slides from Ausquest's conference presentation, Feb 21, 2007

  1. Slide 1: a nen

    a nen mi MT

  2. Slide 2: AusQuest Structure

    AusQuest Structure

  3. Slide 3: AusQuest Projects

    AusQuest Projects Beasley Ni-Cu-PGE Bellary Ni-Cu-PGE ETT Kilometers

  4. Slide 4: Project summary: drill targets by project

    | Beasley Project 100% Raglan WieCiePGE style 7 | 00m WIDE TARGET Sylvania Project 100% Raglan Ni<Cu-PGE style 2 DRILL TARGETS Bellary Project T5% Ragian Ni-Cu-PGE style #13 DRILL TARGETS Table Hill Project 160% Noril'sk Ni-Cu-PGE style 8 DRILL TARGETS

  5. Slide 5: Bellary - Beasley Nickel Projects

  6. Slide 6: Bellary Nickel - New Mapping & Target Areas

    Bellary Nickel - New Mapping &Target Areas Stream Sediment Anomalies Ni-Cu-PGE

  7. Slide 7: Stream Sediment Anomalies

    tream Sediment Anomalies a5 Survey Areas |i

  8. Slide 8: Stream Sediment Anomalies

    Stream Sediment Anomalies Ni-Cu-PGE

  9. Slide 9: Bellary Nickel — Drilling Targets

    Bellary Nickel — Drilling Targets Stream Sediment Anomalies Ni-Cu-PGE Peay Drill Target Prospective Ultramafic VTEM Channel 22 Image

  10. Slide 10: Bellary Nickel Drilling Targets

    DD _ Bellary Nickel Drilling Ta rge ts ee. Gay yy O Drill Target Prospective Ultramafic RE en i) is a zi Ly TMI Magnetic Image ; 7 . | ; : . |

  11. Slide 11: Beasley Nickel — Drilling Target

    Beasley Nickel — Drilling Target Drill Hotes 2007 a BRD06-2 Magmatic Ni Cu PGE suiphides NEO.12%, Cu 0.30%, PGE 1.8 git Drill Holes 2007 - BRDO6-2 Magmatic Ni Cu PGE sulphides Ni 0.12%, Cu 9.36%, PGE 1.8 git

  12. Slide 12: Beasley Nickel — Long-Section

    Beasley Nickel — Long-Section Magnetic model fis _Ni-Cu-PGE sulphides -— ~~ — _ BRDOG-2 Basalt and sediments

  13. Slide 13: AusQuest Nickel Projects — Drilling 2007

    AusQuest Nickel Projects — Drilling 2007 | Beasley Project 100% Ragian NiCu-PGE etyle 500m WIDE TARGET Sylvania Project 100% Raglan Ni<Cu-PGE style 2 DRILL TARGETS Bellary Project T5% Ragian Ni-Cu-PGE style #13 DRILL TARGETS Table Hill Project 160% Noril'sk Ni-Cu-PGE style 8 DRILL TARGETS

  14. Slide 14: Table Hill Nickel Project

  15. Slide 15: Table Hill Ni-Cu-PGE Project

  16. Slide 16: Anomaly

    FL 4082 Anomaly V sens 34020 aan aac sasney Easting (awtras) Choneety 120 Kharaelakh Orebod

  17. Slide 17: Sediments

    sediments

  18. Slide 18: sat 8h

    7 sat 8h Erecting (eines) Goowavs ay Easting Gngeres] _aoeinee shoe

  19. Slide 19: AusQuest Nickel Projects — Drilling 2007

    AusQuest Nickel Projects — Drilling 2007 | Beasley Project 100% Ragian NiCu-PGE etyle 500m WIDE TARGET Sylvania Project 100% Raglan NiCu-PGE style 2 DRILL TARGETS Bellary Project T5% Ragian Ni-Cu-PGE style #13 DRILL TARGETS Table Hill Project 160% Noril'sk Ni-Cu-PGE style 8 DRILL TARGETS

  20. Slide 20: Sylvania Nickel Project

    Sylvania Nickel Project _

  21. Slide 21: Geotem Targets

    Geotem Targets | 7

  22. Slide 22: Geotem Channel

    tae Geotem Channel 18) _ [eae a

  23. Slide 23: Sylvania Uranium Project

  24. Slide 24: Sylvania Uranium Potential

    Sylvania Uranium Potential Ternary Radiometric Image

  25. Slide 25: Sylvania Uranium Sampling (U3O8 / Pb)

  26. Slide 26: AN

    AN

  27. Slide 27: Uranium Channel Image

    Uranium Channel Image oe i 0 — EH36 ald *Fixed Wing Survey || 4 : ‘Helicopter Survey «200m line spacing ; “50m line spacing 80m flying height : *30m flying height | | iiroionn *60m sampling : “ *30m sampling

  28. Slide 28: AusQuest in 2007

    AUSQUEST LIMITED AusQuest in 2007 Strong cash position ($8.0m)

AusQuest — RIU Conference (February 2007) on 6ix