Ore Resources Limited · ASX:OR3

Ore Resources — Investor Presentation (August 2019)

18 slides from Ore Resources's investor presentation, Aug 5, 2019

  1. Slide 1: Exploring for High-Grade Nickel Sulphides in Western Australia

    EXPLORING FOR HIGH-GRADE NICKEL SULPHIDES IN WESTERN AUSTRALIA Investor Presentation – August 2019

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Auroch Minerals Ltd (Auroch or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentation

  3. Slide 3: Building a Strong Multi-Commodity Portfolio

    BUILDING A STRONG MULTI-COMMODITY PORTFOLIO FOCUSED BASE METALS EXPLORER with assets in Western Australia and South Australia. TEAM HAS STRONG NICKEL DISCOVERY HISTORY & CORPORATE SUCCESS. FULLY FUNDED AGGRESSIVE EXPLORATION PROGRAMMES for newly-acquired high grade Saints & Leinster nickel sulphide

  4. Slide 4: Exploration Led by Nickel Focused Management

    EXPLORATION LED BY NICKEL FOCUSED MANAGEMENT INDUSTRY LEADING NICKEL EXPERIENCE WITH PROVEN SUCCESS IN ALL STAGES FROM EXPLORATION, THROUGH TO DEVELOPMENT AND PRODUCTION. AIDAN PLATEL CHIEF EXECUTIVE OFFICER • 20+ years’ global experience in exploration, development and mining • Proven exploration s

  5. Slide 5: Quality Australian Base-Metals Projects

    QUALITY AUSTRALIAN BASE-METALS PROJECTS ACROSS HIGHLY-PROSPECTIVE GEOLOGY Ni SAINTS NICKEL PROJECT* Nickel Cu Co ARDEN PROJECT Zn Cu Copper Cobalt Zinc Copper AREA: 20km2 AREA: 1,664km2 MINERALISATION: Archaean Greenstone MINERALISATION: SEDEX Style JORC (2012) Mineral Resource of 1.05Mt Drilling id

  6. Slide 6: Western Australian Nickel Sulphides

    WESTERN AUSTRALIAN NICKEL SULPHIDES SAINTS NICKEL PROJECT 100% owned 20km2 tenement package, located 65km northwest of Kalgoorlie. JORC (2012) Mineral Resource of 1.05Mt @ 2.0% Ni, 0.2% Cu & 0.06% Co for 21.4kt Ni, 1.6kt Cu & 0.6kt Co. • Sits in the same sequence of rocks that host the historical Sc

  7. Slide 7: Saints Nickel Project

    SAINTS NICKEL PROJECT SAINTS NICKEL PROJECT HAS A SIGNIFICANT HIGH GRADE NICKEL SULPHIDE RESOURCE THAT REMAINS OPEN DOWN-PLUNGE AND ALONG STRIKE. • Limited historical exploration since 2008. • Tenement package comprises two mining leases covering 20km2 of Archaean greenstone belt. • 15km north of th

  8. Slide 8: Saints Nickel Project: Long Section & Exploration Targets

    SAINTS NICKEL PROJECT LONG SECTION & EXPLORATION TARGETS • Advanced exploration targeting down-dip extensions and higher grade ore plunges. • Drilling and DHEM to commence immediately. 8 WWW.AUROCHMINERALS.COM 8

  9. Slide 9: Leinster Nickel Project

    LEINSTER NICKEL PROJECT LEINSTER NICKEL PROJECT IS PROSPECTIVE FOR NICKEL & GOLD, STRATEGICALLY LOCATED IN A HISTORIC NICKEL REGION WITH EXISTING INFRASTRUCTURE. • The tenement package covers 112km2 of prospective Archaean greenstone belt geology within the eastern goldfields of the Yilgarn Craton.

  10. Slide 10: Leinster Nickel Project: Valdez Prospect

    LEINSTER NICKEL PROJECT VALDEZ PROSPECT • The Valdez Prospect is located northeast of the Horn and lies along strike from the Waterloo nickel sulphide deposit owned by Saracen Minerals (SAR), 689.3kt @ 2.1% Ni for 14.4kt Nickel. • Historic drilling is shallow, however a drill- hole over the top on t

  11. Slide 11: Nickel Supply

    NICKEL SUPPLY ADOPTION OF EV TECHNOLOGY PROGRESSING FASTER THAN EXPECTED RAPID EVOLUTION IN COMMODITY CONSUMPTION HABITS IS FUELLING A DEMAND- SUPPLY DISCONNECT in a number of commodities underpinning a shift into deficit for nickel resulting in inventories already being drawn down MOBILITY TRANSITI

  12. Slide 12: South Australia Asset Portfolio

    SOUTH AUSTRALIA ASSET PORTFOLIO ARDEN PROJECT 90% owned 1,664km2 Exploration Tenement Package • Kennecott (Rio Group) delineated over 10km of strike potential in 60’s – early 70’s. • 2018 DRILLING PROGRAMME discovered significant high-grade zinc mineralisation: Drill-hole RRDD-0007: • 12.80m @ 4.96%

  13. Slide 13: Arden Project

    ARDEN PROJECT • Drilling at Ragless Range identified significant zinc mineralisation of 12.80m @ 5.0% Zn from 53m; including 3.65m @ 15.5% Zn from 62.15m • Ground-gravity survey completed at Ragless Range & Radford Creek to delineate possible mineralised horizons of the high- density, high grade zin

  14. Slide 14: Exploration Programmes

    EXPLORATION PROGRAMMES AUROCH IS FOCUSED ON DELIVERING MILESTONES & CONSISTENT NEWSFLOW Q3 2019 Q4 2019 2020 Aug Sep Oct Nov Dec 1H SAINTS NICKEL PROJECT Extensional Drilling DH EM Drilling High-priority Untested Targets LEINSTER NICKEL PROJECT Regional Drilling Extensional Drilling – The Horn ARDEN

  15. Slide 15: Exposure to High Grade Nickel Sulphides

    EXPOSURE TO HIGH GRADE NICKEL SULPHIDES IN A THE WORLD CLASS ARCHEAN GREENSTONE BELT NICKEL RESOURCES AT SAINTS AND LEINSTER PROVIDE A SOLID BASE to systematically explore high-priority targets and extend current resources. UNLOCKING LATENT VALUE FROM HISTORICALLY UNDEREXPLORED HIGH-GRADE NICKEL SUL

  16. Slide 16: Contact

    CONTACT CEO Mr Aidan Platel E: aplatel@aurochminerals.com M: +61 400 190 005 1A/1 Alvan Street Subiaco WA 6008 T: +61 8 6555 2950 F: +61 8 6166 0261

  17. Slide 17: Appendix A

    APPENDIX A Significant Mineral Intersections – Saints (0.5% Ni cut-off, 1 metre minimum width) 18 WWW.AUROCHMINERALS.COM

  18. Slide 18: Appendix A

    APPENDIX A Significant Mineral Intersections – Saints (0.5% Ni cut-off, 1 metre minimum width) 19 WWW.AUROCHMINERALS.COM

Ore Resources — Investor Presentation (August 2019) on 6ix