Everest Metals Corporation Limited · ASX:EMC
Everest Metals — Shareholder Meeting (November 2026)
19 slides from Everest Metals's shareholder meeting presentation, Nov 25, 2026

Slide 1: Western Australian Gold & Critical Minerals
rsonal use only AGM PRESENTATION | NOVEMBER 2026 WESTERN AUSTRALIAN GOLD & CRITICAL MINERALS NEAR-TERM GOLD PRODUCER & EXPLORER DEVELOPING AUSTRALIA'S FIRST RUBIDIUM INDUSTRY ASX | EMC everestmetals.au

Slide 2: Corporate Profile: Capital Structure and Board
CORPORATE PROFILE C A P I T A L S T R U CT U RE A N D B O A R D rsonal use only EMC A$0.110 269M A$30.0M A$4.1M A$0 ASX CODE SHARE PRICE SHARES ON ISSUE MARKET CAP CASH DEBT Information as at 30 September 2026. SHAREHOLDER COMPOSITION B O AR D & M AN A G E M E N T TOP 20 SHAREHOLDERS 42% Mark Caruso

Slide 3: The Portfolio
THE PORTFOLIO T H R E E W E S T E R N A U S T R A L I A N P R O J E C T S A C R O S S G O L D & C R I T I CA L M I N E R A L S rsonal use only MT DIMER TAIPAN REVERE MT EDON GOLD GOLD CRITICAL MINERALS Fast-tracking to production and near-term cash Unlocking the full potential of the Revere Reef Gol

Slide 4: Mt Dimer Taipan Gold Project
rsonal use only 01 MT DIMER TAIPAN GOLD PROJECT NEAR-TERM PRODUCTION AND FLOW ASX: EMC everestmetals.au 4

Slide 5: Near-Term Production via Low-Risk Toll Treatment
MT DIMER TAIPAN GOLD PROJECT N E A R - T E R M P R O DU CT I O N V I A L O W - R I S K T O L L T R E A T ME N T rsonal use only 975kt @ 1.37 g/t Au for 43,000 oz (13) MEASURED, INDICATED & INFERRED JORC MINERAL RESOURCE Low-risk processing Production via toll treatment, avoiding upfront plant capita

Slide 6: Mt Dimer Taipan Drilling & Upside
MT DIMER TAIPAN DRILLING & UPSIDE H I G H - G RA DE G O L D S Y S T E M W I T H E X T E N S I O N S O P E N rsonal use only S e l e c t e d D r i l l I n t e r s e c t i o n s (9&11) TPG0110 7m @ 16.1 g/t Au (9–16m) inc., 2m @ 43.6 g/t Au from 10m TPG0086 12m @ 6.2 g/t Au (10–22m) inc., 4m @ 15.8 g/

Slide 7: Revere Gold Project
rsonal use only 02 REVERE GOLD PROJECT RESOURCE UPGRADE ONGOING ASX: EMC everestmetals.au 7

Slide 8: Revere Gold Project: Gold from Surface
REVERE GOLD PROJECT G O L D F R O M S U R F A C E — N E A R - T E R M P R O DU CT I O N O P P O R T UN I T Y rsonal use only 15Mt @ 0.54 g/t Au for 260,780 oz (10) MAIDEN INDICATED & INFERRED JORC MINERAL RESOURCE Strategic location Along the gold-rich Andy Well Greenstone Shear System in the Murchi

Slide 9: Revere Resource Development
REVERE RESOURCE DEVELOPMENT D R I L L I N G C O N F I R M S A C O N T I N U OU S R E G I O NA L G O L D T R E N D rsonal use only S e l e c t e d D r i l l I n t e r s e c t i o n s (3&8) Hole L3-17 13–14 m: 11.3 g/t Au Hole L10-1 27–28 m: 13.8 g/t Au Hole BJ6-2 29–30 m: 32.5 g/t Au Hole BJ6-7 29–30

Slide 10: Revere Resource Expansion & Scoping Study
REVERE RESOURCE EXPANSION & SCOPING STUDY P R O J E CT D E V E L OP ME N T rsonal use only Resource drilling - 7,877m aircore drilling program completed - 125 holes across the Armstrong and Big John deposits and the Tree Reef prospect - Drill results expected in December 2026 - Update Mineral Resour

Slide 11: Mt Edon Critical Minerals Project
rsonal use only 03 WORLD CLASS RUBIDIUM RESOURCE MT EDON CRITICAL MINERALS PROJECT ASX: EMC everestmetals.au 11

Slide 12: World-Class Rubidium Resource on a Granted Mining Lease
MT EDON CRITICAL MINERAL PROJECT W O R L D- C L AS S R U B I D I U M R E S O UR CE O N A G R A N T E D M I N I N G L E A S E rsonal use only 4.3Mt @ 0.23% Rb₂O and 0.1% Li₂O (10) including 1.5Mt @ 0.31% Rb₂O and 0.1% Li₂O INDICATED & INFERRED MINERAL RESOURCE Reported above a 0.10% Rb₂O cut-off grad

Slide 13: Mt Edon Rubidium Resource
MT EDON RUBUDIUM RESOURCE OPEN ALONG STRIKE AND AT DEPTH rsonal use only More than 9,800 tonnes of Rb₂O CONTAINED WITHIN THE MINERAL RESOURCE Approximately 63% Indicated The majority of the Mineral Resource sits in the higher-confidence Indicated category Open in all directions Mineralisation remain

Slide 14: Extraction Technology & Pilot Plant
EXTRACTION TECHNOLOGY & PILOT PLANT D I R E CT R U B I DI U M E X T R A CT I O N D E V E L O PE D W I T H E D I T H C O W A N U N I V E RS I T Y rsonal use only Up to 97% rubidium recovery (1) PILOT PLANT PHASE 3 ECU MINERAL RECOVERY RESEARCH CENTRE PROGRAM o Pilot plant will facilitate to scale up

Slide 15: Pathway to Production
PATHWAY TO PRODUCTION MILESTONES ACROSS THE GOLD AND CRITICAL MINERALS PORTFOLIO Q1 CY26 Q2 CY26 Q3 CY26 Q4 CY26 Q1 CY27 Q2 CY27 rsonal use only MT DIMER Mining Resource expansion drilling Resource upgrade Toll Treatment TAIPAN commencement Native Title AC drilling results Scoping Study Agreement RE

Slide 16: Contact Us
rsonal use only CONTACT US MARK CARUSO SIMON PHILLIPS Chief Executive Officer Investor Relations +61 8 9468 9855 +61 411 883 450 enquiries@everestmetals.au sphillips@everestmetals.au EV EREST M ET ALS CORPORAT I O N LT D Suite 4 .0 2 , 2 5 6 Adelaide T errace, Perth W A 6 0 0 0 Australia ASX | EMC e

Slide 17: Corporate Disclaimer
Corporate Disclaimer Competent Person Statement rsonal use only The information in this report related to Mineral Resource of Mt Edon and Mt Dimer is based on information compiled and approved for release by Mr Bahman Rashidi, who is a member of the Australasian Institute of Mining and Metallurgy (A

Slide 18: References
References 1. EMC ASX Release – 3 June 2025, EMC Advances Australian-First Rubidium Industry at Mt Edon, WA rsonal use only 2. EMC ASX Release – 19 June 2025, U.S. Defence Industrial Base Consortium Membership Approved to Advance Mt Edon Rubidium Project, WA 3. EMC ASX Release – 26 June 2025, EMC’s

Slide 19: Appendix: Mineral Resource Tables
Appendix Mineral Resource - Mt Edon (ASX announcement 19 May 2026) Mineral Resource - Revere (ASX announcement 14 May 2026) Table 1: Mt Edon Mineral Resource Estimate, using a 0.1% Rb2O cut-off grade Table 3: Revere Maiden Resource Classification, using a 0.1g/t Au cut-off grade rsonal use only Tonn
Source: ASX announcement, Nov 25, 2026
More decks from Everest Metals Corporation Limited
Investor Presentation (February 2026)28 slides · Feb 11, 2026
Investor Presentation (August 2025)25 slides · Aug 21, 2025
Investor Presentation (March 2025)27 slides · Mar 18, 2025
Investor Presentation (November 2024)24 slides · Nov 28, 2024
Shareholder Meeting (November 2023)27 slides · Nov 30, 2023
Investor Presentation (October 2023)26 slides · October 2023