Everest Metals Corporation Limited · ASX:EMC

Everest Metals — Investor Presentation (August 2025)

25 slides from Everest Metals's investor presentation, Aug 21, 2025

  1. Slide 1: Western Australian World-Class Assets

    ASX: EMC WESTERN AUSTRALIAN WORLD-CLASS ASSETS NEAR-TERM GOLD PRODUCER & EXPLORER DEVELOPING AUSTRALIA’S FIRST RUBIDIUM INDUSTRY CORPORATE PRESENTATION | AUGUST 2025

  2. Slide 2: Corporate Disclaimer

    Corporate Disclaimer This presentation has been prepared by Everest Metals Corporation Limited (Everest Metals Corporation). This document contains background information about Everest Metals Corporation’s current situation at the date of this presentation. The presentation is in summary form and do

  3. Slide 3: Proven Gold Mine Developers

    Proven Gold Mine Developers Port Headland MT DIMER REVERE Exmouth Newman TAIPAN GOLD GOLD Revere Project Fast-tracking to production Unlocking the Full Potential Canarvon and near-term cash flow of the Revere Reef Gold System in the Murchison Meekatharra Gold Field Kalbarri Mt Magnet Sandstone Mt Di

  4. Slide 4: Corporate Profile

    Corporate Profile EMC $0.14 224M $31M $2.1M $0 ASX CODE SHARE PRICE SHARES ON ISSUE MARKET CAP CASH DEBT (undiluted) Numbers as of 30 June 2025 SHARES ON ISSUE Top 20 Shareholders Remaining Shareholders Mark Caruso Bahman Rashidi Executive Chair & CEO Chief Geologist 40.3% 59.7% Robert Downey Tony S

  5. Slide 5: Mt Dimer Taipan Gold Project

    MT DIMER TAIPAN GOLD PROJECT Low risk processing via toll treatment Inferred JORC Compliant Resource of: 722kt @ 2.1g/t for 48,500oz of Gold and 3.84g/t Ag for 89,000oz Silver (2) Mining approvals granted Toll treatment processing agreement – Q3, 2025 Mining activities to commence – Q4, 2025 August

  6. Slide 6: Mt Dimer Taipan – High Grade Deposit

    Mt Dimer Taipan – HIGH GRADE DEPOSIT Established Resource on granted Mining Lease with Mining Approval o Current JORC Compliant Resource (2): 722kt @ 2.10 g/t Au for 48,545oz of gold 3.84 g/t Ag for 89,011oz of silver o No Gold produced since 1996 and significant Gold mineralisation existing under t

  7. Slide 7: Mt Dimer Taipan – High Grade Gold & Silver Systems

    Mt Dimer Taipan – HIGH GRADE GOLD & SILVER SYSTEMS Previously drilled high grade gold/silver systems include intersection of: (7) o 21MDRC017 8m @ 13.55 g/t Au from 80m incl. 4m @ 23 g/t Au from 80m o 21MDRC025 6m @ 7.07 g/t Au & 6.93 g/t Ag from 45m o 21MDRC008 7m @ 3.19 g/t Au & 14 g/t Ag from 106

  8. Slide 8: Mt Dimer Taipan – Exploration Upside

    Mt Dimer Taipan – EXPLORATION UPSIDE Mt Dimer exploration targets o Priority targets identified through geochemical anomalies and advanced satellite imagery (E77/2383) o Targets appear to correlate with mapped and interpreted shear zones from adjacent mining lease (12) o Initial RC drilling complete

  9. Slide 9: Revere Gold Project

    REVERE GOLD PROJECT Strategic location along the gold-rich Andy Well Greenstone Shear System Near the DeGrussa and Monty Copper-Gold mines High grade gold up to 85.1g/t Au (1) Gold anomaly zones identified along a total 2000m of strike from surface Maiden JORC Resource establishment – Q3, 2025 Augus

  10. Slide 10: Revere Gold Project

    Revere Gold Project Gold from Surface, Near-Term Production Opportunity o 9 tenements and a mining lease application, covering a total area of 171 km2 o Includes a ~7km strike of gold reefs known as the Revere Reefs o High grade gold up to 85.1g/t Au (1) o Gold anomaly zones identified along a total

  11. Slide 11: Revere – Prolific Gold Mineralisation

    Revere – PROLIFIC GOLD MINERALISATION Reconciled grade of quartz lodes by historical processing reported 17 to 325g/t Au (6) o Resource modelling underway o Maiden JORC resource expected in Q3, 2025 o The saddle reefs or fault reefs are at least 25-90m wide and found to repeat from surface to a curr

  12. Slide 12: Revere – Resource Development

    Revere – RESOURCE DEVELOPMENT o The Revere reef system proved by connecting two drill and blast areas (Pit 1 and Pit 2) (1) o These areas are within the target area with previously identified gold mineralisation of at least 700m along strike o High-grade gold close to surface supports potential deve

  13. Slide 13: Pathway to Multi Asset Gold Production

    PATHWAY TO MULTI ASSET GOLD PRODUCTION JORC Native Title Mining Lease Mining proposal Mining proposal resource agreement approval studies approvals REVERE Q3 CY25 Q4 CY25 Q1 CY26 Q2 CY26 Q3 CY26 MT DIMER TAIPAN Exploration Mining Site Mining Resource Ore drilling proposal preparation commencement ex

  14. Slide 14: Rare, Reactive, and Essential

    MT EDON CRITICAL MINERAL PROJECT World-Class Rubidium Resource RARE, REACTIVE, AND ESSENTIAL The West is moving fast to secure EVEREST is proud to be at the its supply of CRITICAL METALS forefront of this PIVOTAL effort 14

  15. Slide 15: Mt Edon Critical Mineral Project

    MT EDON CRITICAL MINERAL PROJECT Developing Australia’s first Rubidium industry Located 420km north Maiden Inferred Preliminary World-Class of Perth on granted JORC Compliant Engineering Scoping Rubidium Resource Mining Lease Resource (3) Study completed (14) Scoping Study Caesium pod completion to

  16. Slide 16: Rubidium – A Critical & Strategic Mineral

    Rubidium – A CRITICAL & STRATEGIC MINERAL Current and developing applications include: Quantum Computing & Aerospace & Defense Atomic Clocks Ion propulsion engines and atomic Atomic clocks which are essential clocks / High-performance plasma for GPS, telecommunications, and thrusters for space propu

  17. Slide 17: Mt Edon – High Tech Critical Mineral Project

    Mt Edon – HIGH TECH CRITICAL MINERAL PROJECT Targeted drilling programs delivered high- grade rubidium-lithium results up to 0.54% Rb2O and 1% Li2O (8) o Mt Edon Pegmatite Field located on the granted Mining Lease (M579/714) in the Southern portion of the Paynes Find Greenstone Belt, an area known t

  18. Slide 18: Mt Edon – World Class Maiden Rubidium Resource

    Mt Edon – WORLD CLASS MAIDEN RUBIDIUM RESOURCE Mt Edon’s initial MRE is based on drilling along a ~400m strike within a 1.2km- long pegmatite corridor on a granted mining lease o The MRE contains more than 7,900 tonnes of Rb2O (3) o Mineralisation remains open along strike and at depth, providing ex

  19. Slide 19: R&D – Successful Recoveries of Rubidium

    R&D – SUCCESSFUL RECOVERIES OF RUBIDIUM Exceptional Process Control and Efficiency Up to 97% Rubidium recovery achieved during Phase 3 ECU Mineral Recovery Research Centre (MRRC) processing program (14) Rubidium chloride product successfully produced via Direct Rubidium Extraction (DRE) as well as L

  20. Slide 20: Pilot Plant – Rubidium & Lithium Extraction

    Pilot Plant – RUBIDIUM & LITHIUM EXTRACTION o Pilot plant will facilitate to scale up the lab-proven extraction process (RbCl) o The optimal pilot plant capacity is projected would be 10 tpa (approx. 1 kg/h) o Potential of transitioning into a R&D hub for downstream processing (Rubidium and Lithium

  21. Slide 21: Mt Edon – Key Milestones

    Mt Edon – KEY MILESTONES H2 CY25 H1 CY26 H2 CY26 H1 CY27 H2 CY27 Engineering CSIRO studies Environmental Pilot plant Mining proposal Scoping Study complement studies operation approvals Grant Bench scale Granting of Prefeasibility application for optimisation Patent study pilot plant Phase-2 Resourc

  22. Slide 22: Contact Us

    ASX: EMC Contact Us EVEREST METALS CORPORATION LTD Suite 4.02, 256 Adelaide Terrace, Perth WA 6000 Australia MARK CARUSO SIMON PHILLIPS Chief Executive Officer Business Development & IR +61 417 964 234 +61 411 883 450 mcaruso@everestmetals.au sphillips@everestmetals.au everestmetalscorporation evere

  23. Slide 23: Corporate Disclaimer

    Corporate Disclaimer Competent Person Statement The information in this report related to exploration results of Mt Edon and Revere projects and Mineral Resource of Mt Edon is based on information compiled and approved for release by Mr Bahman Rashidi, who is a member of the Australasian Institute o

  24. Slide 24: Reference

    Reference 1) EMC ASX Release – 31 October 2024, Shallow High Grade Gold Continues at Revere Gold Project 2) TSC ASX Release – 31 May 2021, Maiden JORC Resource Defined at Mt Dimer Gold and Silver Project in WA 3) EMC ASX Release – 21 August 2024, EMC Delivers World-Class Rubidium Resource at Mt Edon

  25. Slide 25: Appendix: Mineral Resource Tables

    Appendix Mineral Resource- Mt Edon Table 1: Mt Edon Maiden Mineral Resource Estimate, using a 0.1% Rb2O cut-off grade Tonnes Contained Contained Category Rb2O (%) Li2O (%) (Mt) Rb2O (t) Li2O (t) Inferred 3.6 0.22 7,900 0.07 2,500 Total 3.6 0.22 7,900 0.07 2,500 Mineral Resource- Mt Dimer Table 2: Mt

Everest Metals — Investor Presentation (August 2025) on 6ix