Maple Gold Mines Ltd · TSXV:MGM
Maple Gold Mines — Investor Presentation (September 2018)
30 slides from Maple Gold Mines's investor presentation, September 2018
Slide 1: Investor Presentation – September 2018
INVESTOR PRESENTATION – SEPTEMBER 2018
Slide 2: Disclaimer
DISCLAIMER Cautionary Notes Regarding Forward-Looking Statements This Corporate Presentation (“Presentation”) includes “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legisl
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS ESTABLISHED RESOURCE: 0.48M Indicated ounces & 2.75M Inferred ounces (virtually royalty free)* PREMIER MINING JURISDICTION: Quebec ranked 6th best jurisdiction for mining in the world** C$23M MARKET CAP – TRADING @ ~C$7/OZ [~240,000m of drill core archived – replacement value ~
Slide 4: Vision & Outlook
VISION & OUTLOOK Targeting the next Malartic style combined “super-pit” / underground operation in the Abitibi Greenstone Belt Management believes there is strong potential to connect a number of the existing resource zones and expand mineralization at depth and along strike The greater 377 Km
Slide 5: $7B in Recent Gold Transactions in the Abitibi
$7B IN RECENT GOLD TRANSACTIONS IN THE ABITIBI PP/OZ Abitibi Greenstone Belt Price paid per ounce of reserves and resources ($/OZ) OSISKO: $3.91B (2014) 200M ounces of gold MAPLE GOLD MC/OZ production to-date ~C$7/OZ PP/OZ: $208 LAKESHORE GOLD: AURIZON: $945M (2016) $796M** (2013) PP/OZ: $62 PP/OZ:
Slide 6: Excellent Infrastructure: 370 km² Project
EXCELLENT INFRASTRUCTURE: 370 KM² PROJECT Douay Gold Project* Indicated: 479,000 Inferred: 2,759,000 *Contained gold from resource estimate at 0.45 g/t cut-off grade. Please refer to press release dated February 14, 2018 PAGE 6
Slide 7: Established Resource in Top Tier Jurisdiction
ESTABLISHED RESOURCE IN TOP TIER JURISDICTION Updated Pit-Constrained Mineral Resource Estimate (Micon 2018) CUT-OFF CONTAINED GOLD GRADE GRADE CATEGORY TONNES GOLD (G/T) (G/T AU) (OUNCES) INDICATED 8,615,000 1.69 467,000 0.50 INFERRED 74,286,000 1.09 2,610,000 INDICATED 9,383,000 1.59 479,000 0.45*
Slide 8: Share Structure & Ownership
SHARE STRUCTURE & OWNERSHIP Capitalization Share Ownership Shares Outstanding 208,468,772 Warrants* 76,608,534 5% Management/Insiders & 10% Closely Related Options 14,155,000 Quebec Fund & 12% Institutional Fully Diluted 299,232,306 Other Fund & Institutional *Approximately 31M ($0.40) warrants comm
Slide 9: Management
MANAGEMENT MATTHEW HORNOR, PRESIDENT & CEO, DIRECTOR Served as the VP & Executive VP for Ivanhoe Mines Ltd. for 10+ years where he structured strategic partnerships and directly negotiated project/equity financings for more than $450M. Mr. Hornor also served as Managing Director for Ivanhoe Capital
Slide 10: Board of Directors
BOARD OF DIRECTORS JAY CHMELAUSKAS, CHAIRMAN MATTHEW HORNOR, PRESIDENT & CEO, DIRECTOR Former President & CEO of Western Lithium USA Corp. and Served as the VP & Executive VP for Ivanhoe Mines Ltd. for 10+ prior to that CEO of Jinshan Gold Mines Inc., where he led years where he structured strategic
Slide 11: Douay Project History
DOUAY PROJECT HISTORY Exploration in the Abitibi historically focused on high-grade underground mining, as was the case with previous exploration & MAPLE GOLD New team of industry experts. drilling at Douay New vision. Renamed Nov 2017. Drilled 20,000+ metres in 2018. VIOR VIOR Discovers the high-gr
Slide 12: Plan View of Micon 2018 Resource Areas
PLAN VIEW OF MICON 2018 RESOURCE AREAS Conceptual pit-shells from Micon 2018 resource estimate. Maple Gold believes there is potential for larger more unified pit scenario with further “gap” drilling. • No underlying NSR’s except for 1% at NW Zone (~50k ounces) Mineral resources which are not minera
Slide 13: 2018 Winter Drilling Campaign Overview
2018 WINTER DRILLING CAMPAIGN OVERVIEW 2018 Program Objectives: 1- Expand existing resource base via successful infill and step-out drilling 2- Confirm additional targets in greenfields areas Total meterage for campaign: ~22,606m Resource Area drilling (step-out / infill): ~73% of meterage Greenfiel
Slide 14: 2018 Drill Hole Locations
2018 DRILL HOLE LOCATIONS Geographic distribution drill-holes from 2018 campaign PAGE 14
Slide 15: Resource Area Drilling - 2018
RESOURCE AREA DRILLING - 2018 NW Zone NW Gap Area New Nika Zones Central Zone N Porphyry Zone 500m Douay West Zone Main Zone 2018 drill-holes Permitted sites Historic Holes Micon 2018 Whittle Pits Current wireframes 531 Zone 2018 Resource Area drilling focused on infill and step-out areas with signi
Slide 16: 2018 Drill Results Porphyry Zone (W-Central)
2018 DRILL RESULTS PORPHYRY ZONE (W-Central) DO-18-229: Section 705900E 5.5m @ 1.94 g/t Au 8.5m @ 3.83 g/t Au N 12.0m @ 1.90 g/t Au DO-18-216: DO-18-230: 52.0m @3.53 g/t Au 7.0m @ 1.17g/t Au 4.8m@1.25 g/t Au DO-18-234: 7.0m @ 1.47 g/t Au 27.9m @ 0.66 g/t Au Porphyry Zone 2018 Drillhole Collars Histo
Slide 17: 2018 Drill Results – Target Remains Open
2018 DRILL RESULTS – TARGET REMAINS OPEN (PORPHYRY ZONE – West Central) Black bars on left side of hole trace = individual Au assays, scale 0.1-6.0 g/t Au for presentation purposes. Note broader low grade envelope up- hole, and significantly higher grade at depth in the main mineralized zone. Interc
Slide 18: Distribution of Higher Grade Samples
DISTRIBUTION OF HIGHER GRADE SAMPLES NW Zone N Nika Zone Central Zone Douay W. Zone Main Zone Porphyry Zone Conceptual pit (Micon 2018) Historical drill samples >2 g/t Au 531 Zone 2018 drill samples >2 g/t Au 1km 2018 drilling has continued to provide numerous intercepts >2 g/t Au, not only within k
Slide 19: New Nika Zones
NEW NIKA ZONES New Nika Zones are outside conceptual pits and will therefore contribute to existing resource base. Current wide drill spacing in this area leaves opportunity for zone extension. PAGE 19
Slide 20: Nika Zone Cross-Section
NIKA ZONE CROSS-SECTION PAGE 20
Slide 21: Drill Program Summary
DRILL PROGRAM SUMMARY • New mineralized zones continue to be discovered outside current conceptual pits (eg. Nika Zone) • New mineralized zones continue to be found within existing conceptual pits, in areas previously classified as waste (eg. NW and Porphyry Zones) • Numerous high-grade zones inters
Slide 22: Exploration Outlook
EXPLORATION OUTLOOK • Summer exploration work is ongoing: mapping and sampling program covering outcrop area in the central third of the Douay Project • Updating geological and structural models • Updated resource estimate to follow that will incorporate the ~16,300 metres of drilling in the resourc
Slide 23: Key Takeaways
KEY TAKEAWAYS WORLD CLASS JURISDICTION, ESTABLISHED RESOURCE & INFRASTRUCTURE STRONG MANAGEMENT, TECHNICAL TEAM & BOARD (including EX-IVANHOE MINES) DOUAY GOLD PROJECT EXHIBITS STRONG SIMILARITIES TO AN EARLY STAGE CANADIAN MALARTIC WITH SIGNIFICANT EXPLORATION UPSIDE WORKING TOWARDS UPDATED
Slide 24: SUITE O: +1(416) 682.2674 RICHMOND STREET WEST =: +1(416) 306.8141
SUITE 701 O: +1(416) 682.2674 1 RICHMOND STREET WEST =: +1(416) 306.8141 TORONTO, ONTARIO MSH 3W4 CANADA INFO@MAPLEGOLDMINES.COM MAPLEGOLDMINES.COM oe y WAS RANA AN ‘\ & MAPLE MAPLEGOLDMINES.COM
Slide 25: Appendix Slides
MAPLE APPENDIX SLIDES
Slide 26: 2018 Drill Results – Porphyry Zone (Central)
2018 DRILL RESULTS – PORPHYRY ZONE (Central) S N 13.6m @ 0.98g/t Au 4.8m @1.25 g/t Au 93.6m @ 0.87 g/t Au 7m @ 1.17 g/t Au 200m APPENDIX
Slide 27: 2018 Drill Results – Porphyry Zone (Central)
2018 DRILL RESULTS – PORPHYRY ZONE (Central) S N 7.0m @1.47 g/t Au 27.9m @0.66 g/t Au 4.0m @1.21 g/t Au 200m APPENDIX
Slide 28: 2018 Drill Results Porphyry Zone (E-Central)
2018 DRILL RESULTS PORPHYRY ZONE (E-Central) DO-18-254: 61.5m @ 0.8 g/t Au Incl. 27.5m @ 1.3 g/t Au Section 708000E DO-18-244: N 2.5m @ 3.5 g/t Au Section 707850 3.0m @ 1.4 g/t Au 7.0m @ 2.1 g/t Au 1.0m @ 6.3 g/t Au DO-18-247: 21.0m @ 3.5g/t Au Porphyry Zone Incl. 6.0m @9.3g/t Au 2018 Drill Collars
Slide 29: 2018 Drill Results Porphyry Zone (E-Central)
2018 DRILL RESULTS PORPHYRY ZONE (E-Central) S N 21m@ 3.49 g/t Au 100m Geological Section for DO-18-247. Mineralization extends from surface to below the lower limit of the current (Micon 2018) conceptual pit shown as dark v-shaped outline, with the deeper intercept in DO-18-247 being significantly
Slide 30: 2018 Drill Results Porphyry Zone (E-Central)
2018 DRILL RESULTS PORPHYRY ZONE (E-Central) S N 27.5m @ 1.25 g/t Au 100m Geological Section for DO-18-254 with very limited drilling. Higher grade mineralization continues beyond limits of conceptual pit shown as dark v-shaped outline. Lower grade zone in D-93-11 is associated with mixed basalt-sye
Maple Gold Mines — Investor Presentation (September 2018) on 6ix