Iamgold Corporation · TSX:IMG

Iamgold — Deutsche Bank 27th Annual Leveraged Finance Conference 2019

51 slides from Iamgold's conference presentation, Sep 24, 2019

  1. Slide 1: Deutsche Bank 27th Annual Leveraged Finance Conference

    Deutsche Bank 27th Annual Leveraged Finance Conference September 24, 2019 TSX: IMG l NYSE: IAG

  2. Slide 2: Cautionary Statement

    Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than s

  3. Slide 3: Technical Information and Qualified Persons

    Technical Information and Qualified Persons The mineral resource estimates contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43- 101"). The "Qualified Person" responsible for the review and approval of al

  4. Slide 4: IAMGOLD: Building a Cash Flow Pipeline

    IAMGOLD: Building a Cash Flow Pipeline Our vision is to be the global leader in generating superior value for our stakeholders through accountable mining. 1 2 3 4 CREATING DIVERSIFYING MAINTAINING ENSURING superior our portfolio a strong a robust stakeholder balance sheet pipeline value • Operationa

  5. Slide 5: Creating Superior Stakeholder Value

    1 2 3 4 Creating Superior Stakeholder Value Our Operations SELF-FUNDING, SELF-SUSTAINING, SAFE & PROFITABLE • Operating cost management to achieve positive cash-flow; • Capital expenditures reflect value-adding initiatives. Operational improvements at our current sites: • Debottleneck Essakane mill;

  6. Slide 6: Diversifying Our Portfolio

    1 2 3 4 Diversifying Our Portfolio MAP OF OPERATING, DEVELOPMENT AND EXPLORATION PROJECTS Operating Mine Development Project Advanced Exploration NORTH AMERICA Westwood Côté Gold Nelligan ATTRIBUTABLE MEASURED AND Monster Lake INDICATED RESOURCES CENTRAL AMERICA Eastern Borosi 32% 39% South Africa A

  7. Slide 7: Maintaining a Strong Balance Sheet

    1 2 3 4 Maintaining a Strong Balance Sheet MAINTAINING LIQUIDITY WELL ABOVE $1 BILLION Cash and cash equivalents $609.7 M Short-term investments $ 50.7 M Available credit facility $499.6 M Total Liquidity As at June 30, 2019 $1,160 M Forward Sale Funds Receipt: Dec. 2019 + $170 M On January 15, 2019

  8. Slide 8: Ensuring a Robust Pipeline

    1 2 3 4 Ensuring a Robust Pipeline FUTURE PRODUCTION OPPORTUNITIES GROWTH OPPORTUNITIES Monster Lake Quebec Nelligan Quebec Diakha-Siribaya Mali Saramacca, Suriname Mill Optimization, Burkina Faso Eastern Borosi Nicaragua Côté Gold Project, Canada Boto Gold Project, Senegal Pitangui Project, Brazil

  9. Slide 9: Financial Highlights

    Financial Highlights 9

  10. Slide 10: Operating and Financial Highlights

    Operating and Financial Highlights (In $ millions, except where noted) H1’18 H1’19 Variance Attributable production (000s oz) 443 383 14% Attributable sales (000s oz) 450 377 16% Total cash costs ($/oz)1 $773 $890 15% AISC ($/oz)1 $1,012 $1,109 10% Revenue2 $592 $498 16% Gross profit $105 $6 94% Net

  11. Slide 11: Recent Financial Achievements

    Recent Financial Achievements MOODY’S UPGRADES TO BA31 On September 28, 2018, Moody's Investor Services upgraded long-term corporate credit rating to Ba3 from B1 with a stable outlook. CREDIT FACILITY2 On November 15, 2018, amended credit facility to increase the amount to $500 million (from $250 mi

  12. Slide 12: Lowest Leverage Amongst Peer Group

    Lowest Leverage Amongst Peer Group Multiples of EBITDA Average Peer Debt/EBITDA Liabilities Cash Source: FactSet, Company Filings. Market data as of September 18th 2019, Company Fillings as of June 30th 2019 1 Availability as of June 30th 2019, which also excludes amount utilized for Letters of Cred

  13. Slide 13: Cash and Debt – Historical Balances

    Cash and Debt – Historical Balances $800 Cash Total Debt Total Leverage (1) 5.0x 4.6x $600 $677 $639 $640 $400 $699 $485 4.0x $392 $399 $200 3.6x $0 3.0x Total Leverage $(222) $(159) $(271) $(763) -$200 $MM $(548) -$400 $(797) $(816) $(758) 2.0x $(1,052) -$600 1.9x -$800 1.1x 1.0x 1.6x 1.2x -$1,000

  14. Slide 14: Hedging Summary – Reducing Input Exposure

    Hedging Summary – Reducing Input Exposure Fuel hedges of planned consumption › WTI oil – coverage for 5 years  2019 – 90% using zero cost collar options with strike prices between $40-$60/barrel  2020 & 2021 – 75% using zero cost collar options with strike prices between $43-$62/barrel  2022 & 20

  15. Slide 15: Capital Allocation

    Capital Allocation UPDATE ON SELF-FUNDING MODEL • Mine sites tasked with free cash flow generation: • Must cover operating, sustaining and site expansion projects • Mine sites additionally fund corporate, exploration and financing. • New growth projects would be funded from the balance sheet. • Only

  16. Slide 16: Leveraging Existing Asset Base

    Leveraging Existing Asset Base Photo: Wärtsilä 16

  17. Slide 17: Environmental, Social and Governance (ESG)

    Environmental, Social and Governance (ESG) Zero Harm remains both a goal and journey: • Respecting the natural environment, building strong community partnerships and putting the health and safety of our employees first. Strong environmental, social, and governance practices have always been part of

  18. Slide 18: Near Term Catalysts

    Near Term Catalysts H1 2019 $170 Million Gold Prepay Agreement Diahka-Siribaya Updated Resource H2 2019 Essakane CIL and Heap Leach Feasibility Study Saramacca Production Targeted Expect delivery of Boto Mining Permit Nelligan Initial Resource Preliminary Westwood Plan Update 2020 Saramacca Full Pro

  19. Slide 19: 2019 Production and Cost Guidance

    2019 Production and Cost Guidance REFLECTS YTD PROGRESS AND H2 EXPECTATIONS Updated Guidance Previous Guidance1 Essakane (000s oz) 380 – 390 375 – 390 Rosebel (000s oz) 240 – 260 315 – 330 Westwood (000s oz) 95 – 105 100 – 120 Total owner-operated production (000s oz) 715 – 755 790 – 840 Sadiola Joi

  20. Slide 20: 2019 Capex Outlook

    2019 Capex Outlook GUIDANCE UPDATED AT Q2 Updated Guidance Previous Guidance $millions Non- Non- Sustaining1 Sustaining Total Sustaining1 Sustaining Total $40 $70 $110 Essakane $55 $70 $125 $40 $50 $90 Rosebel $70 $75 $145 $15 $20 $35 Westwood $15 $30 $45 Owner-operator $95 $140 $235 $140 $175 $315

  21. Slide 21: Rosebel Gold Mine, Suriname

    Rosebel Gold Mine, Suriname 21

  22. Slide 22: Rosebel – Overview

    Rosebel – Overview OVERVIEW Brokopondo district in north eastern Suriname Ownership • 95% IAMGOLD, 5% Government of Suriname South Mining Method • Conventional open pit methods Paramaribo America Guyana Production • Began commercial production in 2004 Status Rosebel French • Updated 43-101 disclosed

  23. Slide 23: Rosebel – Consolidating a Gold District

    Rosebel – Consolidating a Gold District Joint Venture 45km radius Pits Existing concessions subject to the UJV Gross Rosebel right of Brokolonko exploitation not subject to the UJV 23

  24. Slide 24: Saramacca Progress: Roadwork

    Saramacca Progress: Roadwork 24

  25. Slide 25: Essakane Gold Mine, Burkina Faso

    Essakane Gold Mine, Burkina Faso 25

  26. Slide 26: Essakane – Overview

    Essakane – Overview OVERVIEW North-eastern Burkina Faso, West Africa Morocco Ownership • 90% IAMGOLD, 10% Government of Burkina Faso Algeria • Conventional drill, blast, load and haul surface Western Mining Method Sahara mining method Africa • Began commercial production in July 2010 Mauritania Mali

  27. Slide 27: Essakane – Regional Exploration Targets

    Essakane – Regional Exploration Targets BROWNFIELD SUCCESS • ~1 Moz of resources delineated at Falagountou West and East, 8 kilometres east of Essakane; evaluating potential to increase resources at both deposits • Approximately 24km RC and diamond drilling on the mine lease and surrounding concessi

  28. Slide 28: Westwood Gold Mine, Canada

    Westwood Gold Mine, Canada 28

  29. Slide 29: Westwood – Overview

    Westwood – Overview OVERVIEW Northwestern Québec – A Prolific Gold Mining Camp Ownership • 100% IAMGOLD Mining Method • Underground • Commenced commercial production Production July 2014 Status • Progressing development LOM • Mine life to 2033 • 95 – 105koz 2019 Guidance • $15mm sustaining capex • $

  30. Slide 30: Re-seeding the Pipeline

    Re-seeding the Pipeline >5 Moz Au Brownfield >2 Moz Au Advance Greenfield <2 Moz Au Greenfield Production Fala/Fala E Côté Boto Saramacca Feasibility Study Sadiola Pre-feasibility Study Monster Lake Diakha Yorbeau Saõ Sebastiaõ Gossey E. Borosi Initial Resource / Scoping Nelligan Tassiri Korizena Je

  31. Slide 31: IAMGOLD: Building a Cash Flow Pipeline

    IAMGOLD: Building a Cash Flow Pipeline Our vision is to be the global leader in generating superior value for our stakeholders through accountable mining. 1 2 3 4 CREATING DIVERSIFYING MAINTAINING ENSURING superior our portfolio a strong a robust stakeholder balance sheet pipeline value • Operationa

  32. Slide 32: Appendix

    Appendix tf [IAMGOLD 32

  33. Slide 33: Development Projects

    Development Projects 33

  34. Slide 34: Côté Gold Project Ontario (64.75%)

    Côté Gold Project Ontario (64.75%) OVERVIEW FEASIBILITY STUDY HIGHLIGHTS1- 100% Basis Mining: open pit Mine Capacity: 62 Mtpa • Gogama, Ontario, 130 km southwest of Location Timmins; 200 km northwest of Sudbury Process: crush, grind, gravity, leach, CIP Mill Capacity: 13.1 Mtpa • Land package coveri

  35. Slide 35: Boto Gold Senegal (90%)

    Boto Gold Senegal (90%) OVERVIEW FEASIBILITY STUDY HIGHLIGHTS3- 100% Basis Mining: open pit Mine Capacity: 18.2 Mtpa • Senegal, West Africa Location • Along same trend as B2Gold’s Fekola Mine Process: crush, grind, leach, CIP Mill Capacity: 2.75 Mtpa in Mali Mill Daily Throughput 7,500 tpd Ownership

  36. Slide 36: Mineral Reserves and Resources

    Mineral Reserves and Resources 36

  37. Slide 37: 2018 Mineral Reserves and Resources

    2018 Mineral Reserves and Resources Mineral resources (“resources”) and mineral reserves (“reserves”) have been estimated as at December 31, 2018 pursuant to Canadian securities regulatory requirements, specifically the requirements of National Instrument 43-101 and the definitions of resources and

  38. Slide 38: Attributable Reserves (Moz)

    129% Increase in Reserves Since 2016 20 17.9 Moz 18 14.5 Moz Attributable Reserves (Moz) 1,2 16 Reserve Increases5 14 Rosebel3: +1.3Moz 12 Côté: +0.9Moz Essakane: +0.9Moz 10 7.8 Moz Boto: +0.3Moz 8 6 4 2 0 2016 2017 2018 4 1 Mineral reserves have been estimated at December 31, 2017 and 2018 using a

  39. Slide 39: Gold Mineral Reserves (100% Basis)

    Gold Mineral Reserves1 100% BASIS RESERVES Proven Probable Contained Contained Tonnes Grade Tonnes Grade As at December 31, 2018 Ounces Ounces (000s) (g/t) (000s) (g/t) (000s) (000s) Rosebel 29,776 0.6 587 100,583 1.0 3,208 Saramacca — — — 26,549 1.8 1,542 Essakane — — — 148,812 0.9 4,380 Westwood 1

  40. Slide 40: Gold Mineral Reserves (Attributable)

    Gold Mineral Reserves1 ATTRIBUTABLE RESERVES Proven Probable Contained Contained Tonnes Grade Tonnes Grade As at December 31, 2018 Ounces Ounces (000s) (g/t) (000s) (g/t) (000s) (000s) Rosebel (95%) 28,287 0.6 558 95,554 1.0 3,048 Saramacca (66.5%) — — — 17,655 1.8 1,025 Essakane (90%) — — — 133,931

  41. Slide 41: Gold Mineral Resources (100% Basis)

    Gold Mineral Resources1,2 (Measured and Indicated Resources are Inclusive of Proven and Probable Reserves) 100% BASIS RESOURCES Measured Indicated Inferred Contained Contained Contained As at December 31, 2018 Tonnes Grade Tonnes Grade Tonnes Grade Ounces Ounces Ounces (000s) (g/t) (000s) (g/t) (000

  42. Slide 42: Gold Mineral Resources (Attributable)

    Gold Mineral Resources1,2 (Measured and Indicated Resources are inclusive of Proven and Probable reserves) ATTRIBUTABLE RESOURCES Measured Indicated Inferred Contained Contained Contained As at December 31, 2018 Tonnes Grade Tonnes Grade Tonnes Grade Ounces Ounces Ounces (000s) (g/t) (000s) (g/t) (0

  43. Slide 43: Côté Gold Project – Reserves & Resources History

    Côté Gold Project – Reserves & Resources History CÔTÉ GOLD - IMG ATTRIBUTABLE RESERVES & RESOURCES 10.0 1.0 9.0 0.9 30% share 8.0 sold to SMM. 0.8 Initial Reserve Declared 7.0 from PFS 0.7 Ore Grade (g/t Au) Ounces Au (Moz) 6.0 0.6 5.0 0.5 4.0 0.4 3.0 0.3 2.0 0.2 1.0 0.1 0 14.5 Moz 1 0 2012.02 2012.

  44. Slide 44: Exploration Projects

    Exploration Projects tf [IAMGOLD 44

  45. Slide 45: Monster Lake

    Monster Lake Quebec (50% JV Interest) OVERVIEW RESOURCE Location • Quebec 100% Tonnes Grade Contained Ounces • 50:50 JV with TomaGold, with option to earn up to a Basis (000) (g/t) (000 Au) Ownership 75% interest • Continuing to better define and extend the 325- Inferred1 1,110 12.14 433 Megane Zone

  46. Slide 46: Nelligan

    Nelligan Quebec (51% JV Interest) OVERVIEW HIGHLIGHTS Renard Zone drill hole results1: Location • Quebec • NE-19-149: 17.3 metres grading 5.50 g/t Au • 51% JV Interest, option to earn up to 80% Ownership • NE-19-138: 123.7 metres grading 1.26 g/t Au interest • NE-19-113: 34.5 metres grading 1.75 g/t

  47. Slide 47: Diakha-Siribaya

    Diakha-Siribaya Mali (90%) OVERVIEW RESOURCE • Located approximately 10km south along 100% Tonnes Grade Contained Ounces strike from the Boto Gold Project in Senegal Basis (000) (g/t) (000 Au) • 20182: 14,600 metres of RC & DD drilling completed. Results include: Measured 18,031 1.28 744 › 1.61 g/t

  48. Slide 48: Pitangui

    Pitangui Brazil (100%) OVERVIEW RESOURCE Tonnes Grade Contained Ounces • Banded iron formation hosted deposit (000) (g/t) (000 Au) • 25 km from Jaguar’s Turmalina mill Highlights • 2017 drilling program resulted in a 21% Inferred1 5,365 4.7 819 increase in inferred resources • Continuing to test pri

  49. Slide 49: Eastern Borosi

    Eastern Borosi Nicaragua (51% JV Interest) OVERVIEW RESOURCE • Earn-in option with Calibre Mining; 100% Tonnes Grade Contained Ounces Ownership IAMGOLD can earn up to a 70% interest Basis (000) AuEq (g/t) (000 Au) Inferred1,2 4,418 5.7 812 • Multiple high grade Au-Ag epithermal vein Highlights syste

  50. Slide 50: Loma Larga: Optionality via Strategic Investment

    Loma Larga: Optionality via Strategic Investment Ecuador (~36%) OVERVIEW FEASIBILITY STUDY HIGHLIGHTS1 Mine Life ~12 years Nameplate Capacity 3,000 tpd • IAMGOLD owns ~36% of INV Metals (TSX:INV) Annual Average Gold Production 130,000 oz • FS has robust economics with after-tax IRR of Gold Grade 4.9

  51. Slide 51: Investor Relations Contacts

    Indi Gopinathan Martin Dumont Investor Relations Lead Senior Analyst, Investor Relations T: 416-360-4743 T: 416-933-5783 TSX: IMG l NYSE: IAG 51

IAMGOLD — Deutsche Bank 27th Annual Leveraged Finance Conference 2019 on 6ix