Terrain Minerals Ltd · ASX:TMX

Terrain Minerals — Investor Presentation (March 2012)

16 slides from Terrain Minerals's investor presentation, Mar 6, 2012

  1. Slide 1: Exploring for Gold & Nickel

    Exploring for Gold & Nickel Terrain Minerals March 2012 ABN: 45 116 153 514 1

  2. Slide 2: Forward Looking Statements; Competent Persons Statement

    FORWARD LOOKING STATEMENTS This presentation has been prepared by Terrain Minerals Ltd (“Terrain”) as a summary of the Company, its mineral assets and its plans to explore its tenements and for general information purposes only. This presentation contains material that can be construed as forward lo

  3. Slide 3: Two Well Funded Projects

    Two Well Funded Projects Nickel & Gold Two Projects - Fully Funded Aztec Dome Nickel Target » 100% owned strategic land holding (42 km2) in world class nickel province » Government Co-Funded Drill Grant for under explored areas » Drilled Jan/Feb 2012 – awaiting assay results – rock types, densities

  4. Slide 4: Project Locations

    Project Locations CAPITAL STRUCTURE Issued Shares (TMX): 346 m Issued Options Listed (TMXOA): 18.24 m Expiry: Dec 2012 at 8 cents Unlisted: 73.18 m Expiry: Various dates/prices Share Price (2/03/12): 2.6c Market Cap: $9.0m BOARD OF DIRECTORS Non executive Chairman: Dick Sandner Vice Chairman: Jonath

  5. Slide 5: Board of Directors

    Board of Directors Alan Coles – Managing Director Mr Coles is a qualified geologist and mining engineer with over 30 years experience in the mining industry. Alan has worked in South Africa and Australia which has culminated in extensive management and operational experience in gold, base metal and

  6. Slide 6: Black Cat Project Area

    Black Cat Project Area Bundarra Region 6

  7. Slide 7: Black Cat Gold Joint Venture

    Black Cat Gold Joint Venture Black Cat Joint Venture with St. Barbara - Budget $300,000 » TMX has a 60% interest, minimum $150k per year (can earn up to 90%) » Drilling scheduled for January 2012 – air core drilling along strike Craig/Katalina » Exciting topographical high one km long X 160m wide wi

  8. Slide 8: Black Cat - Craig Extended Soil Anomaly

    Black Cat - Craig Extended Soil Anomaly 8

  9. Slide 9: East Kambalda Location Map

    East Kambalda Location Map * KAMBALDA DOME Nickel Production: • Over 1,000,000 tonnes of CONTAINED NICKEL PRODUCED from 1967 9 • Average production of 30 000 tonnes nickel per year with value of > $600,000,000 * Dept of Industry & Resources – Gold and Nickel Deposits in the Archaean Norseman-Wiluna

  10. Slide 10: Kambalda Dome V Aztec Dome

    Kambalda Dome V Aztec Dome (15km apart) 10

  11. Slide 11: Kambalda Dome V Aztec Dome

    Kambalda Dome V Aztec Dome Kambalda Dome Deposits Aztec Dome » Dome top eroded away » Dome top intact » Ore bodies partially eroded with » Any ore bodies have not been gossan expressions at surface eroded as they do not come to the surface » Kambalda dome rock sequence is basalt overlying ultramafic

  12. Slide 12: Aztec Dome Nickel Exploration Program

    Aztec Dome Nickel Exploration Program Explorations Aim is to test for Kambalda style Nickel Deposits Stratigraphical Drilling » Two x 1km deep diamond core holes completed - awaiting assays, rock type, density & sequence analysis. Drill Identified EM Target » Each target drill tested - awaiting assa

  13. Slide 13: EM Anomalies 1 & 2

    AN EM Anomalies 1 & 2 . 4 8600 3 seg Aztec Dome Margins |e oe _ : a ; Sake 6556000mN AZRCDD0012 6

  14. Slide 14: Aztec Dome EM Target Test Zones

    Aztec Dome EM Target Test Zones EM Test Zone Plan EM Cross Section looking East The EM target zone is the range for testing from the drill hole for the existence of a target massive nickel sulphide

  15. Slide 15: Corporate

    Corporate Cash & Receivables for 2012 $3.9m Aztec Dome Budget $1.9m Black Cat Budget $0.3m Admin $0.3m $2.5m Ongoing Balance $1.4m » The sale of Coogee for $900,000 to Ramelius Resources Ltd was announced in January 2012 and included above » Future cash receipts will be $700,000 in October 2012 foll

  16. Slide 16: Terrain Minerals

    Terrain Minerals Exploring for a profitable future Company » No debt » Tight Register - Top 20 hold 52.01% » Motivated (new) Management Team achieving results Aztec Dome – Nickel » Kambalda style » Drilling program completed February 2012 – awaiting assay results & analysis Future Work » Down-hole E

Terrain Minerals — Investor Presentation (March 2012) on 6ix