Slide 1: African Mining Summit
21 September 2021 ASX CODE: MTB AFRICAN MINING SUMMIT The Company has been asked to present at the African Mining Summit on 21 and 22 September 2021. Over these two days It will be subject to various questions from participants online to discuss its Kihabe-Nxuu Polymetallic project in Botswana. With
Slide 2: Kihabe Deposit and further drilling
A further 2,200m of vertical HQ diamond core drilling is about to commence. The average depth per hole will be in the region of 45m. Once complete, this will enable an Indicated/Measured Resource to be estimated, compliant with the 2012 JORC Code. From there final mineralogical/metallurgical test wo
Slide 3: Forward Looking Statement
Forward Looking Statement This report contains forward looking statements in respect of the projects being reported on by the Company. Forward looking statements are based on beliefs, opinions, assessments and estimates based on facts and information available to management and/or professional consu
Slide 4: Competent Person statements
for Reporting of Mineral Resources and Ore Reserves (the JORC Code)’. Mr Dale consents to the inclusion in this report of the drilling results and the supporting information in the form and context as it appears. The information in this report that relates to metallurgical test work results conducte
Slide 5: JORC Code 2012 Table 1 - Sampling Techniques and Data
The following extract from the JORC Code 2012 Table 1 is provided for compliance with the Code requirements for the reporting of drilling results. Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections). Criteria JORC code explanation Commentary Sampling Na
Slide 6: Sub-sampling techniques and sample preparation
Sub-sampling If core, whether cut or sawn and whether quarter, half or all core taken. • If Mount Burgess Mining Diamond Holes and RC Hole techniques non-core, whether riffled, tube sampled, rotary split, etc and whether and sample sampled wet or dry. • For all sample types, the nature, quality and
Slide 7: Data spacing and distribution
Resource estimation. • Specification of the grid system used. • Quality and Drill hole collar locations were recorded at the completion of each hole by hand held Garmin 62S GPS with adequacy of topographic control. horizontal accuracy of approx. 5 metres • Positional data was recorded in projection
Slide 8: Section 2 Reporting of Exploration Results
Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section). Criteria JORC Code Explanation Commentary Mineral tenement and land tenure status Type, reference name/number, location and The Kihabe-Nxuu Project is located in north-western Botswana,
Slide 9: JORC Table 1 criteria continued
Criteria JORC Code Explanation Commentary dip and azimuth of the hole down hole length and interception depth hole length If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the
Slide 10: Balanced reporting and further work
Criteria JORC Code Explanation Commentary Balanced reporting Where comprehensive reporting of all Exploration results reported in Mount Burgess public announcements and this Exploration Results is not practicable, report are comprehensively reported in a balanced manner. representative reporting of