Slide 1: Investor Presentation
ASX : CKA Investor Presentation March 2013

Slide 2: Disclaimer
DISCLAIMER This presentation has been prepared by the management of Cokal Limited (the Company) in connection with meetings with institutional investors, for the benefit of brokers and analysts and not as specific advice to any particular party or person. The information is based on publicly availab

Slide 3: Outline
OUTLINE Corporate Overview BBM P roject Description - P riority Developm ent Other Company Activity Community Development 3

Slide 4: Our Focus
OUR FOCUS Building A Global Metallurgical Coal Business Positive and Agile Decision Making Respect for all Stakeholders Ethical Decision Making Technical Skills for Innovative Solutions Results Orientated 4

Slide 5: Strong Board Coal Pedigree
STRONG BOARD COAL PEDIGREE Peter Lynch - Executive Chairman, Mining Engineer, 25 years experience in mining; MIM, Shell Coal, MacArthur Coal, Open Cut & Underground, TSX and ASX:WCI. Pat Hanna - Executive Director and Exploration Manager, Geologist, over 30 years experience all coal; Globally consul

Slide 6: Diverse and Experienced Management
DIVERSE AND EXPERIENCED MANAGEMENT Duncan Cornish – Joint Company Secretary, Chartered Accountant, Ernst & Young and PWC; Successful IPO and RTO record on ASX, TSX and AIM listed companies including TSX – WCI, WCB; AIM – SLG; ASX–DGR, PGM, MET, BOW, WCI, SA, SMR. Chris Turvey – Exploration & Resourc

Slide 7: Executive Summary
EXECUTIVE SUMMARY Cokal Limited (CKA) COKAL CAPITAL • Listed on the ASX in December 2010 STRUCTURE • Developing Metallurgical Coal Projects in Central Kalimantan ASX Code CKA • Objective: Metallurgical coal producer by H1 2014 Shares on Issue 411M Options on Issue 27.8M Bumi Barito Mineral Project D

Slide 8: Project Locations – Indonesia
PROJECT LOCATIONS – INDONESIA 8

Slide 9: BBM & TBAR and BBP Tenements, Indonesia
BBM & TBAR and BBP TENEMENTS, INDONESIA 9

Slide 10: BBM Priority Project Investment Highlights
BBM PRIORITY PROJECT INVESTMENT HIGHLIGHTS High quality coking coal with significant upside potential Near term production Low cash operating cost Flexible development plans – low capital requirement Advantageous export location – close to markets Experienced Management Team with a stron

Slide 11: BBM Project Timeline
BBM PROJECT TIMELINE Stage 2 is an aspirational plan. There is insufficient Resource to support this plan at present. Current logistics planning takes into account possible expansion at a time when Studies and data support such an expansion plan. 11

Slide 12: Initial Development Study Outcomes
INITIAL DEVELOPMENT STUDY OUTCOMES Stage 1: Real NP V of $US497M (100% P roject) • Stand-alone Development Study at ASSET DESCRIPTION BBM recently completed by SMEC Project BBM, Central Kalimantan, Indonesia • Capable of rapid expansion (Stage 2) JORC Resources 77Mt (70Mt Inferred + 7Mt Indicated) •

Slide 13: Mine Costs
MINE COSTS US$ Operating Cost Development Capital US$/t Avg (Million) (excluding 7% Royalty) Stage 1: Direct ship to start production 50 Stage 1: Direct ship to start production 72.17 - Ramp up to 2Mtpa 50 - Average first 5 years 67.84 TOTAL 100 Stage 1 Stand-alone case (LOM) 89.58 Highly competitiv

Slide 14: BBM Approvals
BBM APPROVALS Current Approvals IUP (Exploration), on ‘Clean & Clear’ List PT BBM approved Foreign Owned company (PMA status) Cokal Shareholding of PT BBM approved by BKPM (Central Government Foreign Investment Co-ordination Board) Exploration Forestry Permit (IPPKH Izin Pinjim Pakai) Upcomi

Slide 15: On the Doorstep of the Biggest Met Coal Markets
ON THE DOORSTEP OF THE BIGGEST MET COAL MARKETS Fastest and lowest cost shipping to key customers Dalandzangad Mongolia Coos Bay United S. Korea Japan Seoul China Seoul States Tokyo Shanghai India Guangzhou Mumbai Mumbai Mumbai Mumbai Vietnam China Seoul Ho Chi Min C

Slide 16: Developing a New Coking Coal Province
DEVELOPING A NEW COKING COAL PROVINCE Indonesian Coal Reserves 16

Slide 17: BBM – 77Mt Indicated and Inferred Resource
BBM – 77MT INDICATED AND INFERRED RESOURCE Resources by Seam Resources by Depth Seam Indicated Inferred Total Indicated Inferred Total Seam Depth Range Thickness Resources Resources Resources Resources Resources Resources Name (m) (m) (Mt) (Mt) (Mt) (Mt) (Mt) (Mt) J 1.40 7.0 10.0 17.0 0-50 4.0 8.0 1

Slide 18: BBM - Premium Quality Coking and PCI Coal
BBM - PREMIUM QUALITY COKING AND PCI COAL Coal Quality of B, C and D Seams Low insitu-ash Seam Product Inherent Moisture Ash Volatile Matter Fixed Carbon Total Sulphur Calorific Value CSN Relative Density Phos- phorus allows direct D PCI 0.9 5.1 10.3 83.7 0.43 8,204 1.5 1.36 0.002 shipping potenti

Slide 19: BBM – Potential to Increase Resource Size
BBM – POTENTIAL TO INCREASE RESOURCE SIZE Exploration Target1 of 200 – 350Mt down to 200m depth. This potential is in addition to the current 77Mt JORC Indicated and Inferred Resources Comprised of 13 Seams in the Eastern Block of BBM (40% of the tenement area) 19

Slide 20: Planned Mining Operations
PLANNED MINING OPERATIONS • Seams Outcrop on the surface • Significant length of outcrop • J seam ~ 1.4m thick • In-pit sizing / screening • Truck / Excavator operation • Contractor operated • Direct Ship from Pit to Jetty 20

Slide 21: Infrastructure and Transport
INFRASTRUCTURE and TRANSPORT Coal to be transported in three phases, accounting for approximately 774km from the mine site to the Java Sea 55km haul road from mine to the Barito River 500km down the Barito River to the Intermediate Stockpile Port at Kelanis Ocean-going barges to transport coal

Slide 22: Truck Haulage
TRUCK HAULAGE • 55km road route, 2 studies done • Detail work underway • Maximum grade planned @ 8% • All weather surface • 120t per truck planned • Dual trailer, side tipping proposal • Ease of loading, unloading, reliability • Excellent balance of operating and capital costs 22

Slide 23: Barge Loading
BARGE LOADING • Plan for direct load from trucks to barges • Spare barges enable efficient system • Stockpiling capability • Front End Loader hoppers for re- loading from stockpile • Low capital, low operating cost • Minimises coal degradation 23

Slide 24: Shallow Draft Barges
SHALLOW DRAFT BARGES • River designed barge system for safe, reliable and economic transport • Indonesian system currently uses towed ocean going barges • Mississippi style allows flexibility, for manoeuvring and cargo sizes Indonesian Style Towed Barge USA: 40,000 km of rivers; 2.7m draft; $5B econ

Slide 25: Shallow Draft Barges
SHALLOW DRAFT BARGES • Stage 1 – 6,000t convoys (4 x 1,500t barges) – 500km • Shallow draft: down to 2.3m water level • 3 Studies completed • Full bathymetric survey of river • Daily river height data for over 10 years used • 6 tugs and barge sets for 2Mtpa Tug and 4 Barge Convoy • Spare barge set a

Slide 26: Deep Water Barge to Shiploader
DEEP WATER BARGE TO SHIPLOADER • Deep water barges to Floating crane in Java Sea • 12,000t now common (matches 2 x 6,000t upper river shallow barge convoys) • Matches common ship hatch size • Many Barge operators at this point • Many Floating crane operators offshore • Low cost, efficient 26

Slide 27: Other Tenements, Central Kalimantan, Indonesia
OTHER TENEMENTS Central Kalimantan, INDONESIA TBAR – 75/25 with local owners, PMA company ownership structure. 19k ha adjoins BBM, which doubles the size of the exploration area available. Potential for BBM seams extend into TBAR: Tenement is on the Clean and Clear List issued by the Directorate

Slide 28: BBM Project Conclusions
BBM PROJECT CONCLUSIONS • High quality coking • Early production product • Geographically well • Low operating cost positioned • Low capital investment • Potential for expansion required • Experienced Executive • Good margin and quick team payback 28

Slide 29: Developing Infrastructure
DEVELOPING INFRASTRUCTURE • Two river ports and two coal-fired power stations to facilitate metallurgical coal production • Working together for mutual benefit with the Murung Raya Regency • CSR program on education and training, employment and local infrastructure development • Brings jobs, educati

Slide 30: Corporate Social Responsibility
CORPORATE SOCIAL RESPONSIBILITY • Assisted with materials and labour to make repairs to the local school • Provided medical support to the community; arranging an ophthalmologist to run a free clinic • Co-operative business which employs local people to assist Cokal with logistics for food, general

Slide 31: Project Location West Kalimantan, Indonesia
PROJECT LOCATION West Kalimantan, INDONESIA • Cokal 75.2% interest in PT Silangkop Nusa Raya (SNR) • Three IUPs in Singtang Regency, West Kalimantan covers an area of 13,000 hectares • Outcrop samples show high volatile, low ash, moderate sulphur and low phosphorus coking coal 31

Slide 32: Summary
SUMMARY Executive Team with strong track record High Margin Metallurgical Coal confirmed Assets with Good Potential BBM Project is well positioned to be in production H1 2014, with significant upside potential Plans to develop the portfolio Plans for becoming Significant Metallurgical Co
Source: Internet Archive copy of cokal.com.au
More decks from Cokal Limited
Investor Presentation (August 2026)21 slides · Aug 13, 2026
Shareholder Meeting (November 2025)28 slides · Nov 21, 2025
Investor Presentation (August 2025)14 slides · Aug 5, 2025
Shareholder Meeting (November 2024)18 slides · Nov 29, 2024
Investor Presentation (August 2024)12 slides · Aug 1, 2024
Shareholder Meeting (November 2023)19 slides · Nov 8, 2023