Gt Resources Inc · TSXV:GT

Gt Resources — Palladium One Mining — Investor Presentation (September 2022)

28 slides from Gt Resources's investor presentation, September 2022

  1. Slide 1: Critical Green Transportation Metals Corporate Presentation

    CRITICAL GREEN TRANSPORTATION METALS CORPORATE PRESENTATION CORPORATE PRESENTATION JUNE 13, 2022 SEPTEMBER, 2022 TSX-V: PDM OTCQB: NKORF FRA: 7N11 TSXV: PDM OTCQB: NKORF 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Palladium One Mining Inc’s (the “Company”) expectations and projections. The TSXV has neither approved

  3. Slide 3: Green Transportation Metals

    Green Transportation Metals PALLADIUM scrubs nitrous oxide from gasoline exhaust. Nitrous oxide is 300x more potent than CO2 as a greenhouse gas. Extending the life of the battery An electric car needs about while preventing overheating PALLADIUM 180 lbs of COPPER, more around the cathode continue t

  4. Slide 4: Investment Highlights

    Investment Highlights LK PROJECT FINLAND Palladium / Copper / Nickel  Disseminated high-tenor sulphide TYKO PROJECT  Multiple untested targets along 38 ONTARIO, CANADA km mineralized strike length  Close to copper and nickel smelters Nickel / Copper Sulphide INDICATED  High tenor Massive Sulphid

  5. Slide 5: Overview: Capitalization, Valuation and Share Price Performance

    Overview Capitalization (millions) Market Valuation Research Coverage Shares issued 258 Cash (6/30/2022) $11 M Sprott Capital Partners Brock Salier Options 13 Enterprise value $25 M Research Capital Adam Schatzker Restricted Share Units 3 Market Cap $36 M Echelon Partners Ryan Walker Warrants 29 Sha

  6. Slide 6: Mining in Finland

    Mining in Finland TOP MINING JURISDICTION ROBUST MINING HISTORY Globally – Mining Policy Framework 44 active mines Globally – Investment Attractiveness Population of 5.5 million people EXISTING INFRASTRUCTURE Decreases development capital: Paved road(s) access Railway High-voltage power on property

  7. Slide 7: LK: Open Pit Disseminated Sulphide

    LK: Open Pit Disseminated Sulphide • Hosted by the laterally extensive basal phase of Koillismaa Complex • Post intrusion deformation has extensively exposed favourable basal phase at surface • High-tenor, palladium dominated sulphide (3Pd:1Pt) Cross section of the original sheet-like Koillismaa Int

  8. Slide 8: LK Project: Finland

    LK Project: Finland NI-43-101 Mineral Resource Estimate INDICATED (38.2Mt @ 0.89 g/t TPM, 0.13% Cu, 0.11% Ni, 65 g/t Cobalt)  1.1 million oz precious metals  111 million lbs copper  92 million lbs nickel  5 million lbs cobalt  Low Strip Ratio INFERRED (49.7Mt @ 0.68 g/t TPM, 0.16% Cu, 0.14% Ni,

  9. Slide 9: LK Resource Expansion Potential

    LK Resource Expansion Potential  Multiple near-term resource growth areas  Mineralization open at depth & along strike  Current resource covers only 5 km of 38 km horizon TSXV: PDM OTCQB: NKORF 9

  10. Slide 10: LK Project: Palladium Price Sensitivity

    LK Project: Palladium Price Sensitivity  ~45% indicated resources, ~ 55% interred  +/- 53% Pd price volatility only +/-32% in resource size TSXV: PDM OTCQB: NKORF 10

  11. Slide 11: LK Project: Metallurgy @ Kaukua Area

    LK Project: Metallurgy @ Kaukua Area Concentrates Bulk (1) Copper (2) Nickel (3) Advanced Metallurgical Testing Mass pull 1.20% 0.36% 0.84%  High-tenor sulphide deposit Palladium 40.1 g/t 38.3 g/t 40.8 g/t  Conventional flotation process Platinium 11.6 g/t 13.1 g/t 11.0 g/t Gold 5.4 g/t 11.2 g/t 2

  12. Slide 12: LK Project: Current Work Program

    LK Project Current Work Program Palladium Security of Supply at Risk  Baseline environmental testing/sampling Global Mine Supply  Vegetation  ~40% from Russia  Aquatic life  Water  ~40% from South Africa  Preliminary hydrological model  90% as a by-product of nickel or platinum mines  Scopi

  13. Slide 13: KS: Massive Sulphide Target – Geophysical Anomalies

    KS: Massive Sulphide Target – Geophysical Anomalies • At 100% sulphide, LK hosts ~58 g/t palladium, ~84 g/t total-precious-metals (TPM), 10% nickel and 13% copper. • High tenor LK mineralization suggests massive sulphides could be very high value. • 3,000 m GTK hole in progress, first to test anomal

  14. Slide 14: Tyko Ni-Cu-Co Project: New Nickel District

    Tyko Ni-Cu-Co Project: New Nickel District Two Massive Sulphide nickel-copper Discoveries - 20 km apart Highlights  25,000 hectares  55 km NE of Marathon, Ontario, Canada  Excellent access via logging roads  8.1% Ni, 2.9% Cu (9.9% Ni_eq or 23% Cu_eq) over 3.8m at surface TSXV: PDM OTCQB: NKORF 1

  15. Slide 15: Tyko Ni-Cu-Co Project: New Geological Model

    Tyko Ni-Cu-Co Project: New Geological Model • Interpreted Ultramafic feeder-type dykes intruding Archean, sulphur-rich sediments, feeding Bulldozer complex. • Systems saturated in sulphur and precipitating high-tenor nickel-copper sulphides • Batholith intruding and breaking up the Bulldozer complex

  16. Slide 16: Tyko Ni-Cu-Co Project: Smoke Lake Zone

    Tyko Ni-Cu-Co Project: Smoke Lake Zone  2020 Discovery:  Structurally controlled massive Ni-Cu sulphide with minor ultramafic hosted in a Tonalite breccia  Extremely high Ni tenors (veins up to 50% Pentlandite)  Subtle magnetic signature (linear trend) 6.6% Ni, 3.7% Cu, 1.5g/t PGE / 3.8m (TK20-0

  17. Slide 17: Tyko Ni-Cu-Co Project: WP Zone

    Tyko Ni-Cu-Co Project: WP Zone West side of property highlighting interpreted Feeder-dykes and proximal high-grade Ni-Cu zones. Close-up of coarse pentlandite “eyes” in massive sulphide veining at WP.  2022 Discovery  Structurally controlled massive Ni-Cu sulphide (similar to Smoke Lake) with mino

  18. Slide 18: Tyko Ni-Cu-Co Project: RJ Zone

    Tyko Ni-Cu-Co Project: RJ Zone  Underexplored zone with both in-tact, primary-type UM Ni- Cu mineralization (disseminated to net-textured to semi- massive) and structurally controlled/remobilized textures within tonalite. Blebby to interstitial, primary-type sulphide textures in RJ Zone. High-tenor

  19. Slide 19: Tyko Ni-Cu-Co Project: Tyko Zone

    Tyko Ni-Cu-Co Project: Tyko Zone Patchy to semi-massive sulphide textures in RJ Zone. Some remobilization. High-tenor Ni sulphides (Pn) West side of Tyko property highlighting interpreted Feeder-dykes and proximal high-grade Ni-Cu zones.  Both primary-type UM Ni-Cu mineralization (disseminated to n

  20. Slide 20: Tyko Ni-Cu-Co Project: Exploration Potential

    Tyko Ni-Cu-Co Project: Exploration Potential 1. High-quality select VTEM anomalies (surface to 300m depth). • Smoke Lake Zone Discovery • West Pickle Lake (WPL) Discovery • Numerous untested EM anomalies that are permitted • Near-surface massive sulphide targets 2. Linear magnetic features interpret

  21. Slide 21: Canalask Nickel-Copper-PGE, Canada

    Canalask Nickel-Copper-PGE, Canada  Northwest of historic Wellgreen Nickel Mine  Large-scale ultramafic body  Historic NI 43-101 (Falconbridge)  Multiple high-grade Nickel-Copper-PGE showings (magmatic Norilsk feeder-type)  All season access from Alaskan Highway  Nickel-rich, epigenetic “footw

  22. Slide 22: Environmental, Social & Governance (ESG)

    Environmental, Social & Governance (ESG) STRATEGY Palladium One strives to produce Green Transportation Metals while delivering Net-Zero Greenhouse Gas (GHG) Emissions over the full life of its exploration, development, mining activities and that of the metals it strives to produce. ENVIRONMENT SOCI

  23. Slide 23: Leadership Team

    Leadership Team Derrick Weyrauch, CPA CA President, CEO and Director Lawrence Roulston Non-Executive Chairman, Independent Director • 30+ years of capital markets experience (Audit, ESG and Comp Committee) • Founder and director of Magna Mining Inc., director at Cabral Gold Inc. and former director

  24. Slide 24: Contact: Corporate Presentation

    CONTACT: DERRICK WEYRAUCH PRESIDENT & CEO DERRICK@PALLADIUMONEINC.COM Corporate FOLLOW US ON Presentation @PALLADIUM_ONE JUNE 13, 2022 PALLADIUM-ONE-MINING TSX-V: PDM OTCQB: NKORF FRA: 7N11 24 TSXV: PDM OTCQB: NKORF

  25. Slide 25: LK Project: NI43-101 Resource Sensitivity

    LK Project: NI43-101 Resource Sensitivity RESOURCE SENSITIVITY TO PALLADIUM PRICE (US$ / OZ) IN-SITU CONTAINED METAL- Mineral Resource Estimate - April 2022 Pd Price Pd Pt Au TPM (1) Cu Ni Co Tonnes (US$/oz) (M oz) (M oz) (M oz) (M oz) (M lbs) (M lbs) (M lbs) (M t) $ 900 0.58 0.21 0.07 0.85 83.3 67.

  26. Slide 26: LK: NI43-101 Mineral Resource (April 2022)

    LK: NI43-101 Mineral Resource (April 2022) NI43-101 MINERAL RESOURCE ESTIMATE - April 2022 Contained Metal - Base Case US$$1,700 Pd per oz (1) Pd Pt Au TPM Cu Ni Co (M oz) (M oz) (M oz) (M oz) (M lbs) (M lbs) (M lbs) Indicated Kaukua 0.74 0.26 0.08 1.09 110.7 91.6 5.4 Inferred Kaukua 0.52 0.20 0.07

  27. Slide 27: LK Project: NI43-101 Resource Details

    LK Project: NI43-101 Resource Details MINERAL RESOURCE ESTIMATE - April 2022 Contained Metal - US$1,700 Pd per oz Pd Pt Au Cu Ni Co PdEq Deposit & Classification (Moz) (Moz) (Moz) (Mlbs) (Mlbs) (Mlbs) (Moz) Indicated Kaukua Lower Zone 0.48 0.17 0.05 68.8 52.6 3.0 1.12 Kaukua South Lower Zone 0.26 0.

  28. Slide 28: Tyko Assay Results: Phase II Drill Program

    Tyko Assay Results: Phase II Drill Program Table 1: Tyko 2021 Phase II Drill Results from the Smoke Lake Zone PGE g/t From Width Ni_Eq Cu_E Au_Eq Ni Cu Co (Pd+Pt+ Pd Pt Hole (m) To (m) (m) % q% g/t* % % % Au) g/t g/t TK21-029 30.4 37.0 6.6 3.97 9.25 12.29 3.08 1.59 0.04 0.56 0.30 0.25 Inc. 31.1 34.1

Palladium One Mining — Investor Presentation (September 2022) on 6ix