Andean Silver Limited · ASX:ASL

Andean Silver — Canaccord Genuity Noosa Mining Conference 2026

46 slides from Andean Silver's conference presentation, Nov 11, 2026

  1. Slide 1: Cerro Bayo Silver-Gold Project: From resource growth to restart

    Slide 1: Cerro Bayo Silver-Gold Project: From resource growth to restart

    rsonal use only ASX: ASL OTCQX: ADSLF ADESY (ADR) Cerro Bayo Silver-Gold Project From resource growth to restart 11-13 November 2026

  2. Slide 2: Disclaimers

    Slide 2: Disclaimers

    DISCLAIMERS This presentation has been prepared by Andean Silver Ltd (ACN 645 578 454) (Company) based on information from its own and third party sources JORC CODE and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, dispatch o

  3. Slide 3: Investment Highlights

    Slide 3: Investment Highlights

    Investment Highlights Cerro Bayo: from resource growth to production restart rsonal use only 136 Moz AgEq 60 Moz AgEq ~A$70.5M cash CY2027 Total Mineral Resource Indicated Resource As at 30 Sep 2026 3 Scoping Study in early CY27 20.0Mt @ 211g/t AgEq1 Up 230% in June 20261 Feasibility Study by end CY

  4. Slide 4: Corporate structure

    Slide 4: Corporate structure

    Corporate structure Well-funded with strong support from foundation shareholders CAPITAL STRUCTURE 2 SHARE PRICE PERFORMANCE SINCE ACQUISITION rsonal use only Shares on issue 230.0 M 3.50 10,000,000 Unlisted RSUs & Performance Rights 16.3 M 9,000,000 Share Price (AUD $ per share) 3.00 8,000,000 Shar

  5. Slide 5: Board and Management

    Slide 5: Board and Management

    Board and Management A board aligned to the development phase at Cerro Bayo rsonal use only Strong Governance Development Delivery Proven Value Creation Independent directors with ASX finance and governance Deep experience in delivering resources development Board and Corporate consultants who deliv

  6. Slide 6: Management and In-Country Team

    Slide 6: Management and In-Country Team

    Management and In-Country Team Experienced corporate, technical and in-country leadership to advance Cerro Bayo Corporate, Strategy & Governance Asset Development & Studies Exploration & Environment rsonal use only Tim Laneyrie Alvaro Fuentes Alex Forster GM, Strategy and Growth General Manager, Cer

  7. Slide 7: Regional Overview

    Slide 7: Regional Overview

    Regional Overview World class province, re-invigorating the district through aggressive drilling N A proven epithermal silver-gold province rsonal use only Comodoro Rivadavia CHILE ARGENTINA Cerro Bayo sits alongside multiple producing mines 1 CERRO BAYO Andean Silver (100%) Andean Silver project 2

  8. Slide 8: Cerro Bayo Project Overview

    Slide 8: Cerro Bayo Project Overview

    Cerro Bayo Project Overview Brownfield restart with significant exploration upside rsonal use only N Lago General Carrera 136Moz AgEq Mineral Resource¹ 20.0Mt @ 211g/t AgEq, incl. 92Moz AgEq underground at 361g/t AgEq 2 CERRO BAYO HUB CHILE Cerro Bayo, Marcela, Lourdes, Guanaco & Raul mines ARGENTIN

  9. Slide 9: Significant exploration potential remains untested

    Slide 9: Significant exploration potential remains untested

    Cerro Bayo has over 20 years of operations Significant exploration potential remains untested • Previously operated during much lower metal price cycles ~1/10th of current prices rsonal use only • Exploration historically undercapitalized leaving significant upside potential • Located in globally re

  10. Slide 10: Cerro Bayo delivered consistent pure silver output

    Slide 10: Cerro Bayo delivered consistent pure silver output

    Cerro Bayo delivered consistent pure silver output With an additional substantial gold credit Junacipio (Fres/PAS) 17.2 Saucito (Fresnillo) 13.8 Cannington (South32) 10.3 rsonal use only Fresnillo (Fresnillo) 10.3 Pirquitas (SSR Mining) 9.8 PURE SILVER PRODUCTION Greens Creek (Hecla) 8.7 Los Gatos (

  11. Slide 11: Development Strategy

    Slide 11: Development Strategy

    Development Strategy Two workstreams running in parallel rsonal use only 6 rigs 1,650 tpd Open pit + UG Mining >200 drill pads Greenfields, extension and Existing processing plant Integrated development Greenfields permitting underway infill drilling Throughput and expansion options scenario under s

  12. Slide 12: Laguna Verde District

    Slide 12: Laguna Verde District

    LAGUNA VERDE DISTRICT 16.7Mt @ 181 g/t AgEq for 97.1Moz AgEq Indicated and Inferred Resource rsonal use only Andean drilling yields material growth in JORC Resource Existing infrastructure in place supporting restart Early works underway to recondition infrastructure Studies will define optimal infr

  13. Slide 13: Restart-Ready Infrastructure

    Slide 13: Restart-Ready Infrastructure

    Restart-Ready Infrastructure 1 2 mtpa crushing circuit rsonal use only 2 500,000 tpa SAG/Ball mill and flotation plant 7 3 14 MW diesel power station 5 3 4 6 4 Site offices and lunchrooms 3 5 Assay laboratory 2 6 Heavy vehicle workshop Permitted TSF, waste dumps, Environmental 1 7 approvals with act

  14. Slide 14: Over 30km of underground infrastructure already in place

    Slide 14: Over 30km of underground infrastructure already in place

    LAGUNA VERDE DISTRICT Over 30km of underground infrastructure already in place rsonal use only Coyita portal, modern 4 x 4.5m decline with installed infrastructure Laguna Verde mine infrastructure, resources constrained by underground MSO and open pit Whittle shell designs Coyita underground develop

  15. Slide 15: Cerro Bayo District

    Slide 15: Cerro Bayo District

    CERRO BAYO DISTRICT 3.3Mt @ 365 g/t AgEq for 38.7Moz AgEq Indicated and Inferred Resource 1 rsonal use only Drilling to commence in early CY27, first in over 20 years High grade deposits within 7km of process plant New veins mapped at surface, extending strike length of known systems to ~10km Geophy

  16. Slide 16: Cerro Bayo District: high grade mine historical production

    Slide 16: Cerro Bayo District: high grade mine historical production

    CERRO BAYO DISTRICT High grade mine with historical production over 36.5Moz @ 679 g/t AgEq 2 N rsonal use only Cerro Bayo portal access Cerro Bayo area infrastructure, Andean first drilling to commence in early CY27 Raul open pit mine ASX CODE: 1. Coeur/Mandalay production reconciliations 2. Refer A

  17. Slide 17: Greenfield Exploration Potential

    Slide 17: Greenfield Exploration Potential

    Greenfield Exploration Potential Over 200 drill pads being approved to test ~10km Droughtmaster – Juanita corridor Significant greenfield exploration pipeline generated rsonal use only Drilling targets generated from surface sampling, structural review and geophysical surveys Extensions of past prod

  18. Slide 18: Logistics infrastructure in place

    Slide 18: Logistics infrastructure in place

    Logistics infrastructure in place Project has direct access to key infrastructure supporting deepwater export of concentrate N Established road, port, ferry and air access rsonal use only 2 Puerto Chacabuco Deep-water port Regional services all within ~200km of the Laguna Verde plant 3 Coyhaique Reg

  19. Slide 19: Permitting Pathway & Social Licence

    Slide 19: Permitting Pathway & Social Licence

    Permitting Pathway & Social Licence A brownfield restart with existing approvals and long-standing local support rsonal use only A · WHERE CERRO BAYO STANDS B · STAKEHOLDER GROUPS 100% owned mining concessions across the Laguna Verde and Cerro Bayo Tenure districts Chile Chico community Municipality

  20. Slide 20: Study and Readiness Program

    Slide 20: Study and Readiness Program

    Study and Readiness Program Building the pathway to a future investment decision rsonal use only Feasibility Study Investment Gap Analysis Scoping Study Underway Early CY27 Plus maiden Ore decision Reserve, end CY27 Future FID Workstreams the Gap Analysis will scope and sequence Study scope Integrat

  21. Slide 21: Pathway to a Restart Decision

    Slide 21: Pathway to a Restart Decision

    Pathway to a Restart Decision rsonal use only Resource Growth Studies and Readiness Exploration Six rigs: infill, extension, greenfields Scoping Study early CY27 >200 drill pads being permitted Resource update early CY27 Feasibility Study and Ore Reserve end CY27 Greenfields drilling 2H CY27 Q4 2026

  22. Slide 22: Why Andean Silver

    Slide 22: Why Andean Silver

    Why Andean Silver A well-funded restart project with significant exploration upside rsonal use only Restart-ready 1 Processing plant, 14MW power station, assay lab, workshops and permitted TSF on warm idle Next milestones Proven Gap Analysis Underway, leading to commencement of studies 2 Over 20 yea

  23. Slide 23: rsonal use only

    Slide 23: rsonal use only

    rsonal use only ASX: ASL OTCQX: ADSLF ADESY (ADR) (+61) 8 6256 3950 Level 2/8 Richardson Street, West Perth, WA 6005 info@ANDEANSILVER.com ANDEANSILVER.COM

  24. Slide 24: Appendix

    Slide 24: Appendix

    APPENDIX rsonal use only Appendix A – Geology and exploration overviews Appendix B – Silver Statistics Appendix C – Mineral Resources Appendix D – Sources ASX CODE: 24 ASL

  25. Slide 25: Appendix A: Geology and Exploration overviews

    Slide 25: Appendix A: Geology and Exploration overviews

    APPENDIX A Geology and Exploration overviews rsonal use only ASX CODE: 25 ASL

  26. Slide 26: Laguna Verde District

    Slide 26: Laguna Verde District

    Laguna Verde District rsonal use only * Refer to ASX release dated 30 June 2026 and Appendix C. The use of economic assumptions in the MSO and Whittle pit optimisation is necessary to define a reporting shell that demonstrates reasonable prospects for eventual economic extraction ASX CODE: 26 and do

  27. Slide 27: Coyita Trend – Long life underground

    Slide 27: Coyita Trend – Long life underground

    Coyita Trend – Long life underground Single, Sub Vertical, high-grade Silver-Gold Vein over 1.3km of strike rsonal use only Mined by traditional Long Hole Stoping from 2014-2017, 4m x 4.5m Decline Future drilling programs targeting conversion of inferred resources ASX CODE: 27 * Refer to ASX release

  28. Slide 28: Delia/Trinidad – High Grade and Open

    Slide 28: Delia/Trinidad – High Grade and Open

    Delia/Trinidad – High Grade and Open rsonal use only Processing & TSF Mines ASX CODE: 28 Infrastructure ASL *Refer ASX releases dated 1 December 2023, 4 March 2024, 11 December 2025, 30 June 2026, 7 July 2026 and 9 November 2026.

  29. Slide 29: Dagny – Parallel lodes expanding footprint

    Slide 29: Dagny – Parallel lodes expanding footprint

    Dagny – Parallel lodes expanding footprint rsonal use only Dagny Portal Processing & TSF Mines ASX CODE: 29 Infrastructure *Refer ASX release dated 9 November 2026. ASL

  30. Slide 30: Temer – Continued discoveries near mill

    Slide 30: Temer – Continued discoveries near mill

    Temer – Continued discoveries near mill rsonal use only ASX CODE: 30 *Refer ASX releases dated 9 October 2025, 11 December 2025, 9 February 2026, 31 March 2026, 30 June 2026 and 9 November 2026. ASL

  31. Slide 31: Pegaso – High value Growth

    Slide 31: Pegaso – High value Growth

    Pegaso 7 – High value Growth New Discovery, Historic district › Surface mineralisation extends over 1km in strike with rsonal use only multiple shoots and not fully tested › Short 2km haulage to the processing plant › Resource of 9.5Moz @ 291g/t AgEq (3.5g/t AuEq) 1 (Inf 6.6Moz @ 303g/t AgEq, Ind 2.

  32. Slide 32: Cerro Bayo District

    Slide 32: Cerro Bayo District

    Cerro Bayo District Targeting new discoveries in highly prospective extension … District Scale Potential rsonal use only Historic mining from outcropping veins Average mining depth to 150m Exploration historically focused on only drilling below outcropping high grade veins Limited Epithermal knowled

  33. Slide 33: Marcela Sth Vein

    Slide 33: Marcela Sth Vein

    Marcela Sth Vein Advanced project with untested mineralized extensions › Part of a larger 1.5km vein system rsonal use only › Development in place › Untested mineralised shoots › Known mining conditions Significant drill results1 include: 2.0m @ 1,322g/t AgEq (900g/t Ag & 5.1g/t Au) (2.0m @ 15.9g/t

  34. Slide 34: Outcropping Mineralization

    Slide 34: Outcropping Mineralization

    Outcropping Mineralization Resources outcropping at surface provides accessible mining operations Multiple high-grade lodes exposed on surface rsonal use only Historic open cut operations and undergrounds Optionality for future mine restart Significant drill results1 include: 3.1m @ 923g/t AgEq (252

  35. Slide 35: Juanita Prospect

    Slide 35: Juanita Prospect

    Juanita Prospect Emerging large-scale Target Juanita Prospect rsonal use only No work done on prospect for 20 years Over 2km of defined strike High-grade breccia style target with both width and grade Work continuing to define prospect ASX CODE: 35 *Refer to ASX * Refer release to ASX dateddated rel

  36. Slide 36: Guanaco Exploration Success

    Slide 36: Guanaco Exploration Success

    Guanaco Exploration Success Drilling to commence in Q3-2026 Guanaco Exploration Growth rsonal use only Defining multiple new veins in a mature district Veins have both width and grade with potential for depth extensions Drilling planned to extend and de- risk existing mineral resources Sawn channels

  37. Slide 37: Droughtmaster

    Slide 37: Droughtmaster

    Droughtmaster District scale exploration opportunity Droughtmaster Corridor rsonal use only Consistent discoveries over 2yr window Recent geophysics shows considerable depth extents (+300m) Drilling targeted for 2H CY27; >200 drill pads being permitted Veta Madre Outcrop within Droughtmaster Corrido

  38. Slide 38: Droughtmaster – Sinter Hill geophysical survey

    Slide 38: Droughtmaster – Sinter Hill geophysical survey

    Droughtmaster – Sinter Hill geophysical survey Emerging untested district scale exploration opportunity rsonal use only A1 A B1 Continued new discoveries (Monserrat) C1 B Geophysics completed over Droughtmaster corridor Further growth continuing on surface and undercover C Future drilling program to

  39. Slide 39: Geophysical Program – Droughtmaster

    Slide 39: Geophysical Program – Droughtmaster

    Geophysical Program – Droughtmaster Large target corridors, deep and consistent Guanaco 2 Mine Guanaco 1 Mine rsonal use only New Vein Claudia/Guanaco Vein Pampa la Perra target Excellent correlation of resistivity highs against known trends (Marcela/Raul and Cerro Bayo) Large corridor of similar sc

  40. Slide 40: Geophysical Program – Droughtmaster

    Slide 40: Geophysical Program – Droughtmaster

    Geophysical Program – Droughtmaster Large target corridors, deep and consistent rsonal use only Marcela Mine Cerro Bayo Mine Guanaco 1 Mine Guanaco 2 Mine Raul Mine Pampa la Perra target Claudia target ASX CODE: 40 See ASX releases dated 13 February 2025, 12 March 2025 and 28 May 2025. ASL

  41. Slide 41: Sinter Hill

    Slide 41: Sinter Hill

    SINTER HILL District scale exploration opportunity rsonal use only Sinter Hill Complex CSAMT indicates +400m depth potential to district scale veins and structures Leonora vein: historic drilling tested down to 1050mRL • 1.49 g/t Au, 18 g/t Ag Cascada top of mineralisation 800mRL Sinter Hill histori

  42. Slide 42: Sinter Hill

    Slide 42: Sinter Hill

    SINTER HILL District scale exploration opportunity • Represents preserved upper epithermal system paleosurface rsonal use only • Elevated As, Sb geochemistry E W SINTERHILL 1300mRL ERUPTIVE BRECCIA AGUILUCHO TREND ASX CODE: 42 ASL

  43. Slide 43: Appendix B: Silver Statistics

    Slide 43: Appendix B: Silver Statistics

    APPENDIX B Silver Statistics rsonal use only Global Silver production versus demand Major bullion vaults stocks 2020-2024 2020 2021 2022 2023 2024 2yr_avg Mine Supply Recycling Capacity Market Demand Auditable Vault London Vaults 1080.5 1161.5 840.9 856.2 827.5 -29% Year Deficit (Moz) CME 396.5 355.

  44. Slide 44: Silver – Powering The Future

    Slide 44: Silver – Powering The Future

    Silver – Powering The Future World silver stockpiles falling as demand growth continues rsonal use only 1400 2000 Moz Silver (Vault Stocks) Photovoltaics Electrical Applications Moz SIlver (Demand) 1200 (~20g of Silver per KW) 1500 (19% of Silver use in Electrical Circuits) 1000 800 1000 600 400 500

  45. Slide 45: Appendix C: Cerro Bayo Project Mineral Resource Estimate

    Slide 45: Appendix C: Cerro Bayo Project Mineral Resource Estimate

    APPENDIX C Cerro Bayo Project Mineral Resource Estimate As at 15 June 2026 Underground Resource Category Tonnes (Mt) Ag (g/t) Ag (Moz) Au (g/t) Au (Moz) AgEq(g/t) AgEq(Moz) rsonal use only Indicated 3.5 199 22 2.6 0.3 417 47 Inferred 4.4 139 20 2.2 0.3 318 45 Total 7.9 165 42 2.4 0.6 361 92 Open Pit

  46. Slide 46: Appendix D: Sources for 2025-2026 Silver Production

    Slide 46: Appendix D: Sources for 2025-2026 Silver Production

    APPENDIX D Sources for 2025-2026 Silver Production rsonal use only Company Link Fresnillo https://www.fresnilloplc.com/media/jrfelmad/280126-fres-4q25-production-report.pdf Pan American Silver https://panamericansilver.com/wp-content/uploads/2026/03/Annual-Report-2025-Pan-American-Silver.pdf South32

Source: ASX announcement, Nov 11, 2026

More decks from Andean Silver Limited

All 18 Andean Silver decks