Andean Silver Limited · ASX:ASL
Andean Silver — Canaccord Genuity Noosa Mining Conference 2026
46 slides from Andean Silver's conference presentation, Nov 11, 2026

Slide 1: Cerro Bayo Silver-Gold Project: From resource growth to restart
rsonal use only ASX: ASL OTCQX: ADSLF ADESY (ADR) Cerro Bayo Silver-Gold Project From resource growth to restart 11-13 November 2026

Slide 2: Disclaimers
DISCLAIMERS This presentation has been prepared by Andean Silver Ltd (ACN 645 578 454) (Company) based on information from its own and third party sources JORC CODE and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, dispatch o

Slide 3: Investment Highlights
Investment Highlights Cerro Bayo: from resource growth to production restart rsonal use only 136 Moz AgEq 60 Moz AgEq ~A$70.5M cash CY2027 Total Mineral Resource Indicated Resource As at 30 Sep 2026 3 Scoping Study in early CY27 20.0Mt @ 211g/t AgEq1 Up 230% in June 20261 Feasibility Study by end CY

Slide 4: Corporate structure
Corporate structure Well-funded with strong support from foundation shareholders CAPITAL STRUCTURE 2 SHARE PRICE PERFORMANCE SINCE ACQUISITION rsonal use only Shares on issue 230.0 M 3.50 10,000,000 Unlisted RSUs & Performance Rights 16.3 M 9,000,000 Share Price (AUD $ per share) 3.00 8,000,000 Shar

Slide 5: Board and Management
Board and Management A board aligned to the development phase at Cerro Bayo rsonal use only Strong Governance Development Delivery Proven Value Creation Independent directors with ASX finance and governance Deep experience in delivering resources development Board and Corporate consultants who deliv

Slide 6: Management and In-Country Team
Management and In-Country Team Experienced corporate, technical and in-country leadership to advance Cerro Bayo Corporate, Strategy & Governance Asset Development & Studies Exploration & Environment rsonal use only Tim Laneyrie Alvaro Fuentes Alex Forster GM, Strategy and Growth General Manager, Cer

Slide 7: Regional Overview
Regional Overview World class province, re-invigorating the district through aggressive drilling N A proven epithermal silver-gold province rsonal use only Comodoro Rivadavia CHILE ARGENTINA Cerro Bayo sits alongside multiple producing mines 1 CERRO BAYO Andean Silver (100%) Andean Silver project 2

Slide 8: Cerro Bayo Project Overview
Cerro Bayo Project Overview Brownfield restart with significant exploration upside rsonal use only N Lago General Carrera 136Moz AgEq Mineral Resource¹ 20.0Mt @ 211g/t AgEq, incl. 92Moz AgEq underground at 361g/t AgEq 2 CERRO BAYO HUB CHILE Cerro Bayo, Marcela, Lourdes, Guanaco & Raul mines ARGENTIN

Slide 9: Significant exploration potential remains untested
Cerro Bayo has over 20 years of operations Significant exploration potential remains untested • Previously operated during much lower metal price cycles ~1/10th of current prices rsonal use only • Exploration historically undercapitalized leaving significant upside potential • Located in globally re

Slide 10: Cerro Bayo delivered consistent pure silver output
Cerro Bayo delivered consistent pure silver output With an additional substantial gold credit Junacipio (Fres/PAS) 17.2 Saucito (Fresnillo) 13.8 Cannington (South32) 10.3 rsonal use only Fresnillo (Fresnillo) 10.3 Pirquitas (SSR Mining) 9.8 PURE SILVER PRODUCTION Greens Creek (Hecla) 8.7 Los Gatos (

Slide 11: Development Strategy
Development Strategy Two workstreams running in parallel rsonal use only 6 rigs 1,650 tpd Open pit + UG Mining >200 drill pads Greenfields, extension and Existing processing plant Integrated development Greenfields permitting underway infill drilling Throughput and expansion options scenario under s

Slide 12: Laguna Verde District
LAGUNA VERDE DISTRICT 16.7Mt @ 181 g/t AgEq for 97.1Moz AgEq Indicated and Inferred Resource rsonal use only Andean drilling yields material growth in JORC Resource Existing infrastructure in place supporting restart Early works underway to recondition infrastructure Studies will define optimal infr

Slide 13: Restart-Ready Infrastructure
Restart-Ready Infrastructure 1 2 mtpa crushing circuit rsonal use only 2 500,000 tpa SAG/Ball mill and flotation plant 7 3 14 MW diesel power station 5 3 4 6 4 Site offices and lunchrooms 3 5 Assay laboratory 2 6 Heavy vehicle workshop Permitted TSF, waste dumps, Environmental 1 7 approvals with act

Slide 14: Over 30km of underground infrastructure already in place
LAGUNA VERDE DISTRICT Over 30km of underground infrastructure already in place rsonal use only Coyita portal, modern 4 x 4.5m decline with installed infrastructure Laguna Verde mine infrastructure, resources constrained by underground MSO and open pit Whittle shell designs Coyita underground develop

Slide 15: Cerro Bayo District
CERRO BAYO DISTRICT 3.3Mt @ 365 g/t AgEq for 38.7Moz AgEq Indicated and Inferred Resource 1 rsonal use only Drilling to commence in early CY27, first in over 20 years High grade deposits within 7km of process plant New veins mapped at surface, extending strike length of known systems to ~10km Geophy

Slide 16: Cerro Bayo District: high grade mine historical production
CERRO BAYO DISTRICT High grade mine with historical production over 36.5Moz @ 679 g/t AgEq 2 N rsonal use only Cerro Bayo portal access Cerro Bayo area infrastructure, Andean first drilling to commence in early CY27 Raul open pit mine ASX CODE: 1. Coeur/Mandalay production reconciliations 2. Refer A

Slide 17: Greenfield Exploration Potential
Greenfield Exploration Potential Over 200 drill pads being approved to test ~10km Droughtmaster – Juanita corridor Significant greenfield exploration pipeline generated rsonal use only Drilling targets generated from surface sampling, structural review and geophysical surveys Extensions of past prod

Slide 18: Logistics infrastructure in place
Logistics infrastructure in place Project has direct access to key infrastructure supporting deepwater export of concentrate N Established road, port, ferry and air access rsonal use only 2 Puerto Chacabuco Deep-water port Regional services all within ~200km of the Laguna Verde plant 3 Coyhaique Reg

Slide 19: Permitting Pathway & Social Licence
Permitting Pathway & Social Licence A brownfield restart with existing approvals and long-standing local support rsonal use only A · WHERE CERRO BAYO STANDS B · STAKEHOLDER GROUPS 100% owned mining concessions across the Laguna Verde and Cerro Bayo Tenure districts Chile Chico community Municipality

Slide 20: Study and Readiness Program
Study and Readiness Program Building the pathway to a future investment decision rsonal use only Feasibility Study Investment Gap Analysis Scoping Study Underway Early CY27 Plus maiden Ore decision Reserve, end CY27 Future FID Workstreams the Gap Analysis will scope and sequence Study scope Integrat

Slide 21: Pathway to a Restart Decision
Pathway to a Restart Decision rsonal use only Resource Growth Studies and Readiness Exploration Six rigs: infill, extension, greenfields Scoping Study early CY27 >200 drill pads being permitted Resource update early CY27 Feasibility Study and Ore Reserve end CY27 Greenfields drilling 2H CY27 Q4 2026

Slide 22: Why Andean Silver
Why Andean Silver A well-funded restart project with significant exploration upside rsonal use only Restart-ready 1 Processing plant, 14MW power station, assay lab, workshops and permitted TSF on warm idle Next milestones Proven Gap Analysis Underway, leading to commencement of studies 2 Over 20 yea

Slide 23: rsonal use only
rsonal use only ASX: ASL OTCQX: ADSLF ADESY (ADR) (+61) 8 6256 3950 Level 2/8 Richardson Street, West Perth, WA 6005 info@ANDEANSILVER.com ANDEANSILVER.COM

Slide 24: Appendix
APPENDIX rsonal use only Appendix A – Geology and exploration overviews Appendix B – Silver Statistics Appendix C – Mineral Resources Appendix D – Sources ASX CODE: 24 ASL

Slide 25: Appendix A: Geology and Exploration overviews
APPENDIX A Geology and Exploration overviews rsonal use only ASX CODE: 25 ASL

Slide 26: Laguna Verde District
Laguna Verde District rsonal use only * Refer to ASX release dated 30 June 2026 and Appendix C. The use of economic assumptions in the MSO and Whittle pit optimisation is necessary to define a reporting shell that demonstrates reasonable prospects for eventual economic extraction ASX CODE: 26 and do

Slide 27: Coyita Trend – Long life underground
Coyita Trend – Long life underground Single, Sub Vertical, high-grade Silver-Gold Vein over 1.3km of strike rsonal use only Mined by traditional Long Hole Stoping from 2014-2017, 4m x 4.5m Decline Future drilling programs targeting conversion of inferred resources ASX CODE: 27 * Refer to ASX release

Slide 28: Delia/Trinidad – High Grade and Open
Delia/Trinidad – High Grade and Open rsonal use only Processing & TSF Mines ASX CODE: 28 Infrastructure ASL *Refer ASX releases dated 1 December 2023, 4 March 2024, 11 December 2025, 30 June 2026, 7 July 2026 and 9 November 2026.

Slide 29: Dagny – Parallel lodes expanding footprint
Dagny – Parallel lodes expanding footprint rsonal use only Dagny Portal Processing & TSF Mines ASX CODE: 29 Infrastructure *Refer ASX release dated 9 November 2026. ASL

Slide 30: Temer – Continued discoveries near mill
Temer – Continued discoveries near mill rsonal use only ASX CODE: 30 *Refer ASX releases dated 9 October 2025, 11 December 2025, 9 February 2026, 31 March 2026, 30 June 2026 and 9 November 2026. ASL

Slide 31: Pegaso – High value Growth
Pegaso 7 – High value Growth New Discovery, Historic district › Surface mineralisation extends over 1km in strike with rsonal use only multiple shoots and not fully tested › Short 2km haulage to the processing plant › Resource of 9.5Moz @ 291g/t AgEq (3.5g/t AuEq) 1 (Inf 6.6Moz @ 303g/t AgEq, Ind 2.

Slide 32: Cerro Bayo District
Cerro Bayo District Targeting new discoveries in highly prospective extension … District Scale Potential rsonal use only Historic mining from outcropping veins Average mining depth to 150m Exploration historically focused on only drilling below outcropping high grade veins Limited Epithermal knowled

Slide 33: Marcela Sth Vein
Marcela Sth Vein Advanced project with untested mineralized extensions › Part of a larger 1.5km vein system rsonal use only › Development in place › Untested mineralised shoots › Known mining conditions Significant drill results1 include: 2.0m @ 1,322g/t AgEq (900g/t Ag & 5.1g/t Au) (2.0m @ 15.9g/t

Slide 34: Outcropping Mineralization
Outcropping Mineralization Resources outcropping at surface provides accessible mining operations Multiple high-grade lodes exposed on surface rsonal use only Historic open cut operations and undergrounds Optionality for future mine restart Significant drill results1 include: 3.1m @ 923g/t AgEq (252

Slide 35: Juanita Prospect
Juanita Prospect Emerging large-scale Target Juanita Prospect rsonal use only No work done on prospect for 20 years Over 2km of defined strike High-grade breccia style target with both width and grade Work continuing to define prospect ASX CODE: 35 *Refer to ASX * Refer release to ASX dateddated rel

Slide 36: Guanaco Exploration Success
Guanaco Exploration Success Drilling to commence in Q3-2026 Guanaco Exploration Growth rsonal use only Defining multiple new veins in a mature district Veins have both width and grade with potential for depth extensions Drilling planned to extend and de- risk existing mineral resources Sawn channels

Slide 37: Droughtmaster
Droughtmaster District scale exploration opportunity Droughtmaster Corridor rsonal use only Consistent discoveries over 2yr window Recent geophysics shows considerable depth extents (+300m) Drilling targeted for 2H CY27; >200 drill pads being permitted Veta Madre Outcrop within Droughtmaster Corrido

Slide 38: Droughtmaster – Sinter Hill geophysical survey
Droughtmaster – Sinter Hill geophysical survey Emerging untested district scale exploration opportunity rsonal use only A1 A B1 Continued new discoveries (Monserrat) C1 B Geophysics completed over Droughtmaster corridor Further growth continuing on surface and undercover C Future drilling program to

Slide 39: Geophysical Program – Droughtmaster
Geophysical Program – Droughtmaster Large target corridors, deep and consistent Guanaco 2 Mine Guanaco 1 Mine rsonal use only New Vein Claudia/Guanaco Vein Pampa la Perra target Excellent correlation of resistivity highs against known trends (Marcela/Raul and Cerro Bayo) Large corridor of similar sc

Slide 40: Geophysical Program – Droughtmaster
Geophysical Program – Droughtmaster Large target corridors, deep and consistent rsonal use only Marcela Mine Cerro Bayo Mine Guanaco 1 Mine Guanaco 2 Mine Raul Mine Pampa la Perra target Claudia target ASX CODE: 40 See ASX releases dated 13 February 2025, 12 March 2025 and 28 May 2025. ASL

Slide 41: Sinter Hill
SINTER HILL District scale exploration opportunity rsonal use only Sinter Hill Complex CSAMT indicates +400m depth potential to district scale veins and structures Leonora vein: historic drilling tested down to 1050mRL • 1.49 g/t Au, 18 g/t Ag Cascada top of mineralisation 800mRL Sinter Hill histori

Slide 42: Sinter Hill
SINTER HILL District scale exploration opportunity • Represents preserved upper epithermal system paleosurface rsonal use only • Elevated As, Sb geochemistry E W SINTERHILL 1300mRL ERUPTIVE BRECCIA AGUILUCHO TREND ASX CODE: 42 ASL

Slide 43: Appendix B: Silver Statistics
APPENDIX B Silver Statistics rsonal use only Global Silver production versus demand Major bullion vaults stocks 2020-2024 2020 2021 2022 2023 2024 2yr_avg Mine Supply Recycling Capacity Market Demand Auditable Vault London Vaults 1080.5 1161.5 840.9 856.2 827.5 -29% Year Deficit (Moz) CME 396.5 355.

Slide 44: Silver – Powering The Future
Silver – Powering The Future World silver stockpiles falling as demand growth continues rsonal use only 1400 2000 Moz Silver (Vault Stocks) Photovoltaics Electrical Applications Moz SIlver (Demand) 1200 (~20g of Silver per KW) 1500 (19% of Silver use in Electrical Circuits) 1000 800 1000 600 400 500

Slide 45: Appendix C: Cerro Bayo Project Mineral Resource Estimate
APPENDIX C Cerro Bayo Project Mineral Resource Estimate As at 15 June 2026 Underground Resource Category Tonnes (Mt) Ag (g/t) Ag (Moz) Au (g/t) Au (Moz) AgEq(g/t) AgEq(Moz) rsonal use only Indicated 3.5 199 22 2.6 0.3 417 47 Inferred 4.4 139 20 2.2 0.3 318 45 Total 7.9 165 42 2.4 0.6 361 92 Open Pit

Slide 46: Appendix D: Sources for 2025-2026 Silver Production
APPENDIX D Sources for 2025-2026 Silver Production rsonal use only Company Link Fresnillo https://www.fresnilloplc.com/media/jrfelmad/280126-fres-4q25-production-report.pdf Pan American Silver https://panamericansilver.com/wp-content/uploads/2026/03/Annual-Report-2025-Pan-American-Silver.pdf South32
Source: ASX announcement, Nov 11, 2026
More decks from Andean Silver Limited
Investor Presentation (September 2026)45 slides · Sep 2, 2026
Noosa Mining Investor Conference (July 2026)38 slides · Jul 22, 2026
RRS Gather Round Conference (April 2026)36 slides · Apr 9, 2026
Euroz Hartleys Institutional Conference (March 2026)35 slides · Mar 16, 2026
RRS Summer Series Conference (February 2026)35 slides · Feb 9, 2026
Investor Presentation (June 2025)31 slides · Jun 26, 2025