  1. Slide 1: Aruma's Gold Targets

    For personal use only ARUMA RESOURCES ARUMA’S GOLD TARGETS Peter Schwann Aruma Resources Limited – Presentation Managing Director AGM November 28 2012 www.arumaresources.com.au ASX: AAJ

  2. Slide 2: Disclaimer / Competent Person's Statement

    Disclaimer /Competent Person’s Statement For personal use only The information in this presentation: ƒ was prepared with due care and attention and is current at the date of the presentation; ƒ is not an offer or recommendation to purchase or subscribe for securities in Aruma Resources Limited or to

  3. Slide 3: Company Rationale

    Company Rationale For personal use only • DRILLING HIGH GRADE GOLD TARGETS • DRILLING KNOWN GOLD AREAS IN W.A. • USING NEW TECHNOLOGY TO – Test previously explored areas with known gold mineralisation – Test covered extensions of known gold mineralisation – Evaluate alteration and mineralisation rem

  4. Slide 4: Project Locations

    Project Locations For personal use only ¾ Glandore Project ¾ 40km east of Kalgoorlie‐Boulder ¾ Fluid Flow model targets to drill ¾ Glandore Hub (60km radius) ¾ Glandore, Bulong and Gindalbie projects totalling over 250km2 ¾ High Grade targets from Hymap and sampling at Gindalbie ¾ Jundee South Proje

  5. Slide 5: Glandore Gold Project

    Glandore Gold Project For personal use only ƒ Strong gold system ƒ 4 Fluid Flow Targets ƒ On major structures ƒ PoWs Approved ƒ Mining leases granted ƒ Drilling booked ƒ Good infrastructure ƒ Land area >57km2 www.arumaresources.com.au ASX: AAJ

  6. Slide 6: Why we are here – Thickness & Grade

    Why we are here – Thickness & Grade For personal use only Location Intersection From Axial Planar Fault** 10m at 10.27 g/t Au 58m 4m at 18.8 g/t Au 103m Supergene Zone** 8m at 10.4 g/t Au 18m (**Both these zones 9m at 8.37 g/t Au 17m at the northern edge 9m at 3.43 g/t Au 15m of Initial Leases) 2m a

  7. Slide 7: Glandore drilling targets from Fluid Flow

    Glandore drilling targets from Fluid Flow For personal use only ƒ Fluid Flow Study Completed ƒ Major Structures in Blue ƒ Yellow Ellipses are gold targets ƒ PoW approved for western targets ƒ Heritage Survey completed ƒ Drilling Booked for year end www.arumaresources.com.au ASX: AAJ

  8. Slide 8: Targets

    TARGETS For personal use only • This is from a Fly through • Points to note are • drilling density and • size of targets www.arumaresources.com.au ASX: AAJ

  9. Slide 9: Fly Through Glandore

    FLY THROUGH GLANDORE For personal use only Points to note are • drilling density • undrilled targets • size of targets Glandore_test_flythrough.wmv www.arumaresources.com.au ASX: AAJ

  10. Slide 10: Glandore drilling targets on Geology

    Glandore drilling targets on Geology For personal use only ƒ On the major Majestic‐Salt Creek structure ƒ Good correlation with Geology ƒ Warm colours = higher flows ƒ Black ellipses (800m long) define primary targets ƒ Historic intersections in yellow solids ƒ Access negotiation completed ƒ Drillin

  11. Slide 11: Jundee South Project

    Jundee South Project For personal use only • Located 60km from Wiluna • 2.5km from Jundee Haul Rd • 25km from Jundee Mine • 4 major Lineaments • Hymap anomaly on discovery • 905m drilled in October www.arumaresources.com.au ASX: AAJ

  12. Slide 12: Jundee South Western Area

    Jundee South Western Area For personal use only ƒ JSR34 has 4m at 15.37g/t Au ƒ Over 2500m RAB delineates RC Target of 400m by 100m www.arumaresources.com.au ASX: AAJ

  13. Slide 13: Jundee South Hymap

    Jundee South Hymap For personal use only ƒ Lease in Yellow ƒ Drilling in yellow ellipse ƒ Hymap ƒ Goethite Red ƒ Mica Green ƒ Chlorite Product Blue ƒ Structure Clearly shown ƒ More Targets along structure www.arumaresources.com.au ASX: AAJ

  14. Slide 14: Structure and alteration from minerals

    Structure and alteration from minerals For personal use only ƒ Same minerals as previous slide ƒ Red = Go, Green = Chlorite and Blue = Phengite www.arumaresources.com.au ASX: AAJ

  15. Slide 15: Structure, alteration and geochemistry

    Structure, alteration and geochemistry For personal use only ƒ Chemistry and drilling is successful www.arumaresources.com.au ASX: AAJ

  16. Slide 16: Look Elsewhere on the Lease

    Look Elsewhere on the Lease For personal use only ƒ Chemistry and drilling is successful ƒ Previous work unsuccessful ƒ New targets suggested ƒ Drilling gaps are on structures www.arumaresources.com.au ASX: AAJ

  17. Slide 17: Glandore Hub Leases

    Glandore Hub Leases For personal use only Leases in a 60km radius of Glandore www.arumaresources.com.au ASX: AAJ

  18. Slide 18: Gindalbie Project

    Gindalbie Project For personal use only ƒ Project Holding 150km2 ƒ 45km north of Glandore ƒ Chip samples up to 25 g/t on Lady Lauren line ƒ Lady Lauren on Hymap Anomaly ƒ PoW approved ƒ Heritage Clearance done ƒ Drilling in New Year www.arumaresources.com.au ASX: AAJ

  19. Slide 19: Gindalbie Project Hyvista Anomaly

    Gindalbie Project Hyvista Anomaly For personal use only ƒ Chip samples up to 25 g/t on Lady Lauren line ƒ Lady Lauren on Hymap Anomaly ƒ Hymap anomaly is alteration ƒ Major SW‐NE Structure with NNW anomaly www.arumaresources.com.au ASX: AAJ

  20. Slide 20: Laverton East Project (Paul Well)

    Laverton East Project (Paul Well) For personal use only ƒ EL Granted ƒ Leases under shallow cover ƒ Hymap maps goethite over Gold anomaly ƒ 2m at 4.28 g/t in LEAC 31 ƒ Exploration focus in North Lease ƒ Hyvista Targets for sampling www.arumaresources.com.au ASX: AAJ

  21. Slide 21: Laverton East Project Hyvista

    Laverton East Project Hyvista For personal use only ƒ North Laverton South Laverton ƒ Hymap Targets for sampling www.arumaresources.com.au ASX: AAJ

  22. Slide 22: Aruma's Next Steps

    Aruma’s Next Steps For personal use only ¾ GLANDORE • Fluid Flow Study defines targets on two major structures off the Majestic Structure • First Phase drilling on the western target areas Heritage cleared and ready to drill ¾ GINDALBIE • PoW approved and initial heritage survey completed • Lady Lau

  23. Slide 23: Aruma – The Investment Story

    ARUMA – THE INVESTMENT STORY For personal use only ƒ 4 Advanced Projects in the proven Eastern Goldfields ƒ All Projects strategically located ƒ Adjacent to established gold producers ƒ 3 programs of RC planned ƒ Applied for State Funded drilling ƒ Next programs funded www.arumaresources.com.au ASX:

  24. Slide 24: Company Snapshot

    Company Snapshot For personal use only Paul Boyatzis – Non Executive Chairman Experienced in capital and equity markets Peter Schwann – Managing Director Experienced geologist in exploration and mining Ki Keong Chong – Non Executive Director Established Lawyer in Asian Finance and Investment Banking

  25. Slide 25: Thank you

    For personal use only ARUMA RESOURCES Thank you. www.arumaresources.com.au ASX: AAJ