Kingman Minerals Ltd. · TSXV:KGS

Kingman Minerals — Investor Presentation (December 2025)

21 slides from Kingman Minerals's investor presentation, December 2025

  1. Slide 1: Corporate Presentation

    > MeN SS Corporate Presentation TSX-V: KGS | FSE: 47A | QTCQB: KGSSF www.kingmanminerals.com December 2025

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains forward looking statements that are based on management’s expectations and assumptions. They include statements preceded by the words “believe’, ‘estimate’, ‘expect’, ‘intend’, ‘will’, and similar expressions, and estimates of future production, costs and dates

  3. Slide 3: Financings Closed & Balance Sheet Reset

     FINANCINGS CLOSED & BALANCE SHEET RESET • Two upsized financings completed: $613K + $1.5M (EU/CA investors). • Total $2.1M raised; Rosebud Mine claims acquisition completed and fully funded for exploration Phase 1 in 2026  NI 43-101 TECHNICAL REPORT PUBLISHED • Consolidates 140 years of mining an

  4. Slide 4: Company Overview

    Kingman Minerals Ltd. (TSX-V: KGS) is a Canadian junior exploration company focused on the high-grade Mohave Gold and Silver Project (“the project” or “Mohave”) which is believed to contain one of the highest-grade undeveloped gold systems in the western United States. Located in the Tier 1 jurisdic

  5. Slide 5: Mohave Project Location and Regional Setting

    • The Mohave Project lies at the southeast end of Nevada’s Walker Lane Gold Trend, where it merges with Arizona’s Laramide Arc copper porphyry belt. Mohave County is considered an underexplored district with potential for significant gold and copper mineralization. • The Rosebud Mine and Music Mount

  6. Slide 6: Project Location

    • Red: 52 lode claims (staked) Project • Blue: 20 Rosebud claims (paid) Location • TOTAL: 1467 acres (594has) (patented mining claims) Rosebud Mine

  7. Slide 7: Mining of the Rosebud Mine

    MINING OF THE ROSEBUD MINE ON THE SW PORTION OF THE MUSIC MOUNTAIN CAMP • High-grade gold and silver discovered in 1879 or 1880 • ~8,400 tonnes of ore mined historically from the Rosebud Mine • Focused on two vein structures, mined along ~180 m of strike length • While production records are limited

  8. Slide 8: Channel Sampling Confirms Bonanza-Grade Veins

    CHANNEL SAMPLING CONFIRMS BONANZA-GRADE VEINS Phase 1 Reconnaissance & Sampling •Accessed historic workings at 100ft level •Collected high-grade channel and chip samples 252 g/t Au + 341 g/t Ag over 0.46 m (RB100-04, N Stope) 688 g/t Au + 468 g/t Ag over 0.18 m (RB200-11, N Stope) Phase 2 Reconnaiss

  9. Slide 9: Phase I and Phase II Drilling

    Phase I Drilling (2021) Rosebud Mine 778 m of core drilling across 5 holes designed to test extensions and remnant mineralization adjacent to historic workings in the footwall, and to validate the reported grades historical drilling by Stellar Resources and Kent Exploration. Intercepts included: • M

  10. Slide 10: Drill Hole Legend and Intercepts

    Legend MH-05: 5.96 g/t Au and 26.3 g/t Ag over 1.22m Existing drill hole from 119.18m by Kingman DDH07-2: Existing drill hole 5.29 g/t Au and 5.3 g/t Ag over 1.07m by others from 58.98m Mapped surface tracings of gold DDH07-2 veins MH-03: 9.06 g/t Au and 68.9 g/t Ag over 2.13m from 81.38m 100 ft. le

  11. Slide 11: Exploration Gameplan

    Exploration Gameplan 1.) Along-Strike: At Rosebud, two main veins occur along the margins of a porphyritic rhyolite dike. Target extensions of the Rosebud mineralization from the currently mined 180 m strike length of up to 1.1 km. 2.) Parallel Vein Testing: Rosebud Mine Eight vein zones have been i

  12. Slide 12: As of December 8, 2025

    As of December 8, 2025 GOLD: | $ 4,220 SILVER | $ 58.40 TSX-V: KGS | $ 0.105 FSE: 47A | € 0.0495 QTCQB: KGSSF | $ 0.075 ISSUED & OUTSTANDING: | 42,787,521 SHARE PRICE (CAD): | $ 0.09 MARKET CAP: | $ 4.49 M INSIDERS AND AFFILIATES : | ≈ 20 % 52 Week High/Low: | 0.14/0.07

  13. Slide 13: Board of Directors

    CYRUS DRIVER (Non-Executive Chairman) Mr. Driver is a chartered accountant and was a founding partner of the firm Driver Anderson in 1982 and is a retired partner in the firm of Davidson and Company LLP. His wide knowledge of the securities industry and its rules have enabled him to give valuable ad

  14. Slide 14: Management Team

    SIMON D. STUDER (Interim President & CEO) Mr. Studer has over 15 years of industry and sustainable business experience with a special focus on the Americas within the resource industry. Simon has worked with numerous publicly traded and private junior resource companies in various leadership roles,

  15. Slide 15: Appendix

    —= MPN.ERALS =—— APPENDIX www.kingmanminerals.com

  16. Slide 16: Historical Exploration and Ownership

    1879-80 Gold was discovered in the area. 1909: Ten mines were being worked within a two-mile radius of the Rosebud Claims 1930’ Mill and underground development of the Rosebud Mine included a 400-foot shaft and 2,500 feet of workings Bayrock drilled, sampled underground and at surface to estimate an

  17. Slide 17: Regional Geological Setting

    • Southwestern edge of the Colorado Plateau. • NE: Grand Wash Cliffs with Paleozoic strata overlain by Tertiary volcanics. • SW: Hualapai Valley with deep Quaternary alluvial fill (>4,000 ft). • NW–SE Grand Wash Fault parallels mineralized structures on the property. • Regional tectonic setting plac

  18. Slide 18: Host Rocks and Vein System

    • Host rocks: Early Proterozoic orthogneiss (1.6–1.8 Ga). • Eight vein zones identified; Rosebud Mine structure = two Au–Ag veins flanking a porphyritic rhyolite dike. • Sub-vertical diabase dikes control vein mineralization; strong magnetic signature. • Epithermal vein system emplaced into Cerbat C

  19. Slide 19: Drone Mag Survey & Mapping

    Drone Mag Survey & Mapping 1. Conduct a drone magnetometer survey for structural control and dike identification. 2. Follow with detailed geologic mapping, rock sampling, and prospect sampling. >2km Drill Program (5 Core Holes) 1. Test southeast extensions of the Southwick (Rosebud) veins with four

  20. Slide 20: Deposit Types – Rosebud Mine

    DEPOSIT TYPES – ROSEBUD MINE Primary System: Low-sulfidation epithermal Au-Ag veins (Southwick East & West Veins) along rhyolite porphyry fissures, trending NW, steeply dipping SW. Characteristics: Narrow vein spacing (3–10 m+), fault gouge material with oxidized sulfides, minor quartz, no visible g

  21. Slide 21: Kingman Minerals Ltd

    KINGMAN MINERALS LTD Suite 2150 - 555 West Hastings Str. Vancouver, BC V6B 4N6 Tel: 604-685-7720 ingmanminerals.com KINGMAN ——= Vi aNeeeheee SS =—— INVESTOR INQUIRIES Simon D. Studer simondstuder@hotmail.com Int. Tel: +41 44 585 24 84 WhatsApp: +1 236 833 35 94

Kingman Minerals — Investor Presentation (December 2025) on 6ix