  1. Slide 1: Investor Day Virtual Conference 2021

    Colbun INVESTOR DAY Virtual Conference 2021 Dec. 15 | 11:00 hrs

  2. Slide 2: Ccolbun

    Ccolbun : > = . . . . . ° 6666 6 6 VONA9V

  3. Slide 3: Welcome Remarks - Chairman of the Board

    €colbun [INVESTOR DAY WELCOME REMARKS | Hernan Rodriguez Chairman of the Board

  4. Slide 4: Ccolbun

    Ccolbun : > = . . . . . ° 6666 6 6 VONA9V

  5. Slide 5: Power Sector Overview and Strategy Summary

    POWER SECTOR Pe mal OVERVIEW AND itd Bee = a STRATEGY SUMMARY a

  6. Slide 6: Power Sector Overview

    ms POWER SECTOR OVERVIEW __/ POWER SUPPLY/ DEMAND MARGINAL COST MODEL REGULATORY > UNDER SCRUTINY bis, ag ENVIRONMENT

  7. Slide 7: Power Supply/Demand

    ¢@ POWER SECTOR OVERVIEW _/ Ccolbun INVESTOR DAY POWER SUPPLY/DEMAND @ ~ 1. INSTALLED CAPACITY 8.000 solar OQWind ~« _) %of total dy, 28% / 4 17% MW 2 ° S Solar and wind are the dominant new 2000 v % capacity additions 7% iz ah 2.000 = 1 ind: CAGR' solar and wind: 43% a SS CAGR demand: 3% 2015 2016

  8. Slide 8: A Role for New Technologies

    me POWER SECTOR OVERVIEW __/ Ccolbun — INVESTOR DAY A ROLE FOR NEW TECHNOLOGIES ~ Storage systems are Regul Na Will this technology follow = (@) likely to play a key role © Maite. @ the path of solar&wind = in a “decarbonized” technologies? economy 7 1 Lithium-ion battery pack price Cumulative deman

  9. Slide 9: Regulatory Environment

    POWER SECTOR OVERVIEW / Ce Gy REGULATORY ENVIRONMENT Decarbonization agenda An agreement to decommission all coal-fired power plants by 2040 was signed between de Ministry and the power generation companies in 2018 Some companies have decided to accelerate their decommissioning programs Congress is

  10. Slide 10: Regulatory Environment (cont.)

    ms POWER SECTOR OVERVIEW __/ Ccolbun — INVESTOR DAY REGULATORY ENVIRONMENT (CON’T) rey | The 1,350 MMUSD fund is ooer® PEC-2 in the making? running out a. A significant debt level has Viggen Part of the burden to be accumulated socialized? voos® Risk of importing LNG in rey ) 2? certain scenarios re

  11. Slide 11: Marginal Cost Model Under Scrutiny

    me POWER SECTOR OVERVIEW __/ A case for competitive “bid and offer” wholesale market? MARGINAL COST MODEL UNDER SCRUTINY Main drivers for change: e@ New technologies have increased the e Discrepancies with regulators’ rulings and e Need to provide adequate price/market complexity of operating the sy

  12. Slide 12: Strengthen our competitiveness

    Strengthen our competitiveness by: Develop a project portfolio that has the potential to add 4,000 MW capacity by - Continuous improvement in 2030 and to operate in the lower quartile Focus on unregulated clients with an productivity and efficiency of the industry’s cost curve attractive value propo

  13. Slide 13: Chief Energy Officer

    €colbun INVESTOR DAY 12

  14. Slide 14: Asset Base Optimization: Short term challenges

    ASSET BASE OPTIMIZATIO Short term challenges , THERMAL fs TRANSMISSION HYDROLOGY 1 puoe GENERATION ry FUEL PRICES =~ _ |NFRASTRUCTURE Hydrology in 2021 was There has been an Fuel prices have The transmission at its lowest historical intensive use of thermal increased significantly system has been un

  15. Slide 15: Asset Base Optimization: Short term challenges

    ASSET BASE OPTIMIZATIC Short term challenges A possible scenario: Another very Diesel requirements could increase dry 2022 with high fuel prices in 2022 (m3/day)" Under conditions maximum Par demand, the use of diesel is e The system would rely on minimum estimated that could base load capacity outa

  16. Slide 16: Ability to serve commitments under different hydro conditions

    ASSET BASE OPTIMIZATIO Ability to serve commitments under different hydro conditions @ Flexible gas supply ;) Generation & Commitments 2021 (TWh) e ADP LNG LNG - Spot Argentinean NG = Long-term contract to Subject to operational Access to the access purchases of and market conditions Argentinean gas

  17. Slide 17: Hydroelectric and Thermal Power Plants acquire great relevance

    Hydroelectric and Thermal Power Plants acquire great relevance With coal-fired power plants decommissioning there will be less availability of these type of services

  18. Slide 18: Continuous improvement in productivity and process efficiency

    ASSET BASE OPTIMIZATION —_/ Continuous improvement in productivity and process efficiency Maintenance and operational fixed costs (USD mm) 53 50 46 40 37 35 34 2017 2018 2019 2020 2021 Key iniciatives © Optimizing maintenance © Productivity improvement e “Reengineering” of contracts **A constant exc

  19. Slide 19: Transmission congestion in the central zone

    Transmission congestion in the central zone • •

  20. Slide 20: Peruvian Market: Change in gas price declaration methodology

    Peruvian Market: Change in gas price declaration methodology

  21. Slide 21: Chief Engineering and Project Officer

    Chief Engineering and Project Officer

  22. Slide 22: Growth in Renewables

    ~ GROWTH IN RENEWABLES / € colbun INVESTOR DAY nae DEVELOPMENT Objective: PHASE To develop projects with LCOE in the © TARGET CRITERMA Ons IN first quartile of the industry CONSTRUCTION © High Load Factor ENGINEERING AND © Colbunas EPC integrator © Close to system interconnection points © Experience

  23. Slide 23: Growth in Renewables: project portfolio

    ~ GROWTH IN RENEWABLES / li PROGRESS STAGE: @ Stusies”” © Breespitty © Siyenade © ws 1, 7280 MW a 4 INTI PACHA HS oD > 1,2&3 DIEGO DE ALMAGRO (50 730 mw 232 MW PV + 150MWPV: 32 MWh BESS +360 MWh : BESS a 45MW JUNQUILLOS 360 MW Located in one of the areas with the best radiation in Chile. a ‘ Zs Q q

  24. Slide 24: Horizonte Wind Farm Project

    Horizonte Wind Farm Project Location: Taltal, Antofagasta Region KEY INDICATORS Estimated capacity 778 MW - 140 Wind Turbines @ Net annual generation 2,400 GWh Antofagasta @ Estimated capacity factor 35.3% Taltal @ Land surface 8,000 ha Parinas S/S 500/220 @ Connection point (9,7 and 15,8 km) e@ Env

  25. Slide 25: Horizonte Wind Farm Project Render

    Horizonte Wind Farm Project Render

  26. Slide 26: Diego de Almagro PV Project

    Diego de Almagro PV Project Location: Diego de Almagro, Atacama Region KEY INDICATORS Estimated capacity 232 MW PV + 32 MWh BESS @ Net annual generation 648 GWh © Estimated capacityfactor 35% @ Land surface 330 ha = 5 ; = as si mr Se — A . : Connection point (2.6 km) @ Env. Impact Assessment Approve

  27. Slide 27: Diego de Almagro PV Project

    ~ GROWTH IN RENEWABLES / Ccolbun INVESTOR DAY Diego de Almagro PV Project ' m- T\ T\ = Site Works - December 2021 All equipment already on site First power injection: Dec 2021 26

  28. Slide 28: Machicura PV Project

    - GROWTH IN RENEWAB Machicura PV Project Location: Colbtin, Maule Region KEY INDICATORS @ Estimated capacity 9MW @ Net annual generation 20.5 GWh @ Estimated capacity factor 24% @ Land surface 20 ha @ Connection point Connected to Colbun’s line @ Env. Impact Assessment Approved e@ coD Nov 21

  29. Slide 29: Machicura PV Project

    ~ GROWTH IN RENEWABLES / Ccolbun INVESTOR DAY Machicura PV Project Site Works - November 2021 28

  30. Slide 30: Inti Pacha 1, 2 & 3 PV Project

    GROWTH IN RENEWABLES Inti Pacha 1, 2 & 3 PV Projec Location: Maria Elena, Antofagasta Region KEY INDICATORS i OD o 1; 250 MW Tocopilla x r = Estimated capacity 2: 250 MW. Antofagasta e 3: 250 MW e@ Net annual generation ~2,000 GWh e Estimated capacity factor 35% Inti Pacha 1 - Land surface 1,105 ha

  31. Slide 31: Jardín Solar PV Project

    GROWTH IN RENEWABLES __/ Ccolbun e@ INVESTOR DAY Jardin Solar PV Project Location: Pozo Almonte, Tarapaca Region Iquique y KEY INDICATORS e@ Estimated capacity 540 MW @ Net annual generation 1,500 GWh @ Estimated capacity factor 35% @ Land surface 1,000 ha @ Connection point New Pozo Almonte S/S 220

  32. Slide 32: Commercial Highlights - Chief Commercial Officer

    G colbun [INVESTOR DAY COMMERCIALHIGHLIGHTS | Ulivia Heuts Chief Commercial Officer 31

  33. Slide 33: Increase share of sales to unregulated clients

    Increase share of sales to Excellence in customer Delivery of focused value- unregulated clients in our experience added services sales mix = * 4 e e Risk profile of unregulated Customers service model aie 8 products/services: clients.ismore attractive leveraging digitalization “Colbun by Efizity” B

  34. Slide 34: Power supply commitments

    COMMERCIAL HIGHL Power supply commitments — y “a. ‘ho Our PPAs are supported by a matching cost-efficient power generation Cost structure properly reflected in sale prices + active risk management 10,3 9,8 2016 2017 2018 2019 2020 Consequently, our PPAs portfolio willincrease as our new renewable |

  35. Slide 35: Focus on unregulated customers

    . COMMERCIAL HIGHLIGHTS —_/ GC colbun Focus on unregulated customers Che a We have increased the share As a result, our market share in of sales to unregulated clients. ————- _—‘ the unregulated segment has in-our-sales mix increased > © Calbun 41% 2016 2016 Sales to Colbun’s share in the unregulate

  36. Slide 36: We are serving an increasing number of customers

    We are serving an increasing number of costumers 15 19 9 1907 —~C~«*:=<i«‘«‘CS*: wo © fe) ° fe) i _—F How likely would you recommend to become a COLBUN client? Colbun’s NPS Expanded delivery of value- © Colbun added services by S 0, acquiring Efizity re auelale wi sf Camanchaca de ‘€ haca . Power Co

  37. Slide 37: Chief Development and Innovation Officer

    Chief Development and Innovation Officer

  38. Slide 38: Power storage systems

    HVDC Line Solar resource/ we CAPEX for att generation eries expected Operational only by 2029+ abundance Z Price arbitration Potential 1,200 GW only System balance and opportunity between day in Antofagasta’ ancillary services and night hours ae 50% by 20302 sa 1. GlZand Ministry of Energy, 2014 37

  39. Slide 39: Storage systems can leverage our asset base

    Storage systems can leverage our asset base

  40. Slide 40: Exploring new areas: infrastructure assets for power supply

    Exploring new areas: infrastructure assets with an important role for power supply

  41. Slide 41: Our Pathway

    C colbun INVESTOR DAY Business Sustainability Reportability progresses <r - ESG commitments Strategy tegrated Annual Report A" and goals made public Integrated inall areas of 2 ‘listing” (Chile & MILA) reno A re the comes in = Stakeholder curve Growth focus on - First green bond S= — . renewable ene

  42. Slide 42: Our ESG goals and highlights

    Our ESG goals and highlights Operational (m3/MWh):

  43. Slide 43: Investor Day Virtual Conference 2021

    Colbun INVESTOR DAY Virtual Conference 2021 Dec. 15 | 11:00 hrs

Colbun — Investor Day (December 2021) on 6ix