Slide 1: Progressing Approval & Development of Cliff Head CCS Project
Progressing Approval & Development of Cliff Head CCS Project Northern Perth Basin, WA 22 February 2023 PILOT ENERGY LIMITED ASX:PGY

Slide 2: Compliance Statements
Compliance Statements Disclaimer Competent Persons Statement This investor presentation has been prepared by Pilot Energy Limited ABN 86 115 229 984 (Pilot or the Company). This announcement contains information on conventional petroleum resources which is based on and fairly represents Any material

Slide 3: Cliff Head CCS – Project Overview
Cliff Head CCS – Project Overview Key enabler of low cost clean hydrogen and ammonia production for the Mid West Clean Energy Project • Cliff Head CCS Project is an integral part of the Mid West Clean Energy Project • Brownfield re-development utilizing existing Cliff Head Oil Field onshore/offshore

Slide 4: Cliff Head CCS Project - the journey so far
Cliff Head CCS Project - the journey so far……….. Established but historically untested Commonwealth regulatory pathway • Legislation – OPGGSA - providing for CCS in Commonwealth Waters has been in place since 2006 • Applicable regulations have also been in place since 2011 and application guidelines

Slide 5: Location of Cliff Head Oil Field, WA-31-L, Western Australia
Location of Cliff Head Oil Field, WA-31-L, Western Australia Situated in Federal Waters, Offshore North Perth Basin Frankland 1 Dongara Waitsia Beharra Cliff Head Springs Deep 5 Global CCS Institute Australia & SE Asia Members Forum – Darwin NT - 22-23 February 2023

Slide 6: Regional Geology of the Storage System
Regional Geology of the Storage System The Cliff Head Field is located on a large structural horst Leander Reef 1 Cliff Head Field Structure Map Base Kockatea Depth WA-481-P West East Eneabba Fm. Kockatea Horst Shale Line of section Reservoirs WA-31-L WA-481-P TP/15 Kockatea IRCM Kingia Shal

Slide 7: Seismic data
Seismic data Extensive 2D and 3D data sets Seismic acquisition Seismic re-interpretation Oil phase CCS application • 2D seismic, 1982, 1999, 2002 – Cliff Head discovery • 2022 – revise and extend mapping to the full license area to • 3D seismic, 2003 – post discovery support GHG capture model • Tied

Slide 8: Well and production data
Well and production data Extensive and long-term production and injection history Cliff Head 3 Cliff Head 4 Cliff Head 1 Cliff Head 5 Cliff Head 2 Cliff Head 6 Mentelle 1 Kockatea Shale IRCM IRCM Kingia Kingia OOWC HCSS HCSS Paleo OWC? Section location Production & Injection history • Volume and pre

Slide 9: Declaration of Storage Formation
Declaration of Storage Formation Detailed Regulations - OPGGS Act Regulations Schedule 1 Suitability Determinant Element Assessment Program CO2 source, compositions, injector Injection rates, location agreed Overarching locations, rates, volumes and durations Exploration and production history, New

Slide 10: CCS Approval Journey
CCS Approval Journey Focussing in on project viability driven by rigorous geoscience and engineering against suitability Seismic Mapping Well Data Production Data Geomechanics STATIC GEOLOGICAL MODEL Update static model, re-run dynamic model, review plume extent DYNAMIC GEOLOGICAL MODEL Sensitivity

Slide 11: Static and dynamic modelling – production then storage
Static and dynamic modelling – production then storage Historical black oil reservoir model used for initial project screening Black Oil model – Production phase Revised Static and Dynamic model - CO2 injection phase • Geology + Geophysics + Engineering Static model • Revised and extended to licen

Slide 12: Dynamic modeling – create and test injection scenarios
Dynamic modeling – create and test injection scenarios New build fit-for-purpose CCS static and dynamic reservoir modelling • Injection into IRCM oil reservoir on flank, water withdrawal at crest • The plume travels from the southerly injection site, moving through the upper IRCM due to buoyancy • S

Slide 13: Dynamic modeling – plume extent and containment
Dynamic modeling – plume extent and containment Fundamentally determination of storage formation suitability focuses on potential “end” of project Objectives set by OPGGSA • Extent at end of injection • Stabilised extent 100 years post injection, within license area • Less than 10% chance of contact

Slide 14: Risk Assessment – is it safe?
Risk Assessment – is it safe? Containment Objectives Faults trending SW-NE are in compression Top seal is thick and competent • Top Seal • Effectiveness and within failure limit Strong • Fault considerations; er • What if/when the plume reaches the faults? Kockatea • Pressure at which reactivation m

Slide 15: DoSF application checklist
DoSF application checklist Robust technical assessment & very conservative storage case complies with OPGGSA Regulations Schedule 1 Suitability Determinant Element Assessment Program Status CO2 source, compositions, injector Injection rates, location agreed Assessed, modelled, demonstrated Overarchi

Slide 16: Conclusions - size of prize
Conclusions - size of prize 2C storage resource over 10 MT with significant storage upside over 50 MT (P10) Status • The initial modelling to support the ISFm application supports a conservative 10 MT • Significant storage capacity upside over 50 MT • Sensitivity testing identified the key parameter

Slide 17: Contact Details
Contact Details Pilot Energy Limited Level 1, 85 Elizabeth Street Paddington, NSW 2021 www.pilotenergy.com.au Brad Lingo Tony Strasser Nick Watson Chairman Managing Director Head of Renewables & Commercial blingo@pilotenergy.com.au tstrasser@pilotenergy.com.au nwatson@pilotenergy.com.au 17 Presentat
Source: Internet Archive copy of pilotenergy.com.au
More decks from Pilot Energy Limited
Shareholder Meeting (February 2026)25 slides · Feb 24, 2026
Conference Presentation (September 2025)25 slides · Sep 10, 2025
JMM & Alpine Capital Noosa Investor Day (July 2025)31 slides · Jul 24, 2025
Carbon Capture APAC Summit 202522 slides · Jul 18, 2025
Investor Presentation (April 2025)27 slides · Apr 14, 2025
Shareholder Meeting (February 2025)15 slides · Feb 12, 2025