  1. Slide 1: 2026 AGM MD Presentation

    For personal use only 2026 AGM MD Presentation | 24 February ASX:PGY 1

  2. Slide 2: Compliance Statements

    Compliance Statements 2 Disclaimer This investor presentation has been prepared by Pilot Energy Limited ABN 86 115 229 984 (Pilot or the Company). For personal use only Any material used in this presentation is only an overview and summary of certain data selected by the management of Pilot. The pre

  3. Slide 3: Investment Highlights

    Investment Highlights 3 For personal use only World-Class project, First mover advantage in WA clear strategy and derisked Carbon Storage (CCS) and development pathway Direct Air Capture (DAC) with global and domestic tailwinds Experienced Management Existing infrastructure to deliver objectives und

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot 4 PGY Shareholder Analysis For personal use only Corporate & Institutional 79% 9% 9% 3% Greg Columbus Brad Lingo Alex Sundich Natalie Wallace Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Retail Board & 8 Rivers 30+ years experience deliver

  5. Slide 5: Strategic WA Asset Portfolio

    Strategic WA 5 Asset Portfolio Consolidated Perth Basin footprint covering diversified energy For personal use only infrastructure-rich region ▸ Energy Infrastructure Cliff Head – Offshore/onshore pipelines, storage, terminal, power generation & transmission facilities Arrowsmith - multi-staged modu

  6. Slide 6: Recent Developments & Upcoming Milestones

    Recent Developments & Upcoming Milestones 6 Progressing multiple work streams to drive shareholder value For personal use only Carbon Storage Data Centre Renewables  Three Springs Solar+BESS Project joint development with SN Energy  Australia’s first Direct Air Capture  Dongara data centre with K

  7. Slide 7: Existing infrastructure provides the foundation

    Existing infrastructure provides the foundation 7 Cliff Head / Dongara plant site provides all the essentials for a high value/high growth clean business For personal use only  Power  Water  Gas  Communications  Carbon storage ASX:PGY

  8. Slide 8: Power Generation

    Power Generation 8 Existing power generation enables near term revenue generation For personal use only ▸ Existing under-utilized gas-fired power generation ▸ Existing natural gas pipeline infrastructure capable of firm supply for up to 45MW base load ▸ Significant power generation expansion potenti

  9. Slide 9: Carbon Capture & Storage: Global and Domestic Tailwinds

    Carbon Capture & Storage 9 Global and Domestic Level Tailwinds For personal use only Global momentum in deployment of Carbon Capture and Storage (CCS) is accelerating behind carbon neutrality targets 1,300Mt CO2 A$39 - A$173 Supportive per annum per tonne Local Policy Projected global demand for Car

  10. Slide 10: Cliff Head Carbon Storage Project: World-Scale Project

    Cliff Head Carbon Storage Project 10 World-Scale Project ▸ Recognised as a leading Australian Carbon Storage Project For personal use only ▸ 72Mt of CO2 storage in Stage 1; scalable for further expansion ▸ Annual injection capacity will place Cliff Head in global top 10 ▸ Scale and timing to deliver

  11. Slide 11: Leading Australia's Offshore CCS

    Cliff Head Carbon Storage Project 11 Leading Australia’s Offshore CCS For personal use only ▸ WA’s only offshore carbon ▸ Declaration of storage project with Stage Storage Formation 1 Commonwealth granted in 2024 approval Advanced Permitting ▸ Injection Licence ▸ Without existing Application underwa

  12. Slide 12: WA Government CCUS Action Plan quote

    12 For personal use only Western Australia is well placed to become a world leader in carbon capture, utilisation and storage (CCUS), leveraging our existing infrastructure, highly skilled workforce, and suitable geological formations.” Carbon capture utilisation and storage: Action Plan* WA Governm

  13. Slide 13: Dongara Data Centre JV

    Dongara Data Centre JV 13 Partnership with Kala Data to jointly develop a data centre at Cliff Head plant facility For personal use only Multi-stage data centre • Targeting near term positive cash flow to support the transition of Cliff Head to carbon storage • Leverages Pilot’s existing surplus gas

  14. Slide 14: Dongara Data Centre JV

    Dongara Data Centre JV 14 Existing power generation and modular installation drives WA Data Centres – Ranked by Power rapid multi-staged data centre delivery For personal use only “The initial 1 MW modular data centre, with capacity to expand to 4 MW in 2026 and potentially up to 30 MW across our Ar

  15. Slide 15: Google Data Centre + Carbon Capture & Storage

    Google Data Centre + Carbon Capture & Storage 15 “Google’s new, first-of-a-kind agreement … unlocking a critical technology pathway to enable a clean, affordable, reliable energy future”* For personal use only “ Google will buy most of the power it generates, helping get this new, baseload power sou

  16. Slide 16: Three Springs Solar+BESS Project

    Three Springs Solar+BESS Project 16 Advanced stage with joint development and divestment optionality For personal use only ▸ 376MW Three Springs Solar Project is DA-approved 132kV transmission ▸ Binding Heads of Agreement (HoA) with SN Energy for joint development of the Hybrid Solar+BESS project at

  17. Slide 17: Ammonia: Global and Domestic Tailwinds

    Ammonia 17 Global and Domestic Level Tailwinds For personal use only Global demand for low-carbon ammonia is accelerating as energy systems decarbonise; driven by the clean fuel transition, international shipping, and fertiliser sector transformation. 700Mt NH3 US$600 - $1000 Supportive per annum pe

  18. Slide 18: Ammonia: A practical, carbon-free energy carrier

    Ammonia 18 A practical, carbon-free For personal use only energy carrier ▸ Efficient Bulk Energy Transport Ammonia as a hydrogen carrier enables 1.8x more hydrogen per volume to be shipped than liquid H₂, making it ideal for long-distance transport. ‣ Global Infrastructure Ready Leveraging existing

  19. Slide 19: Low-Cost, Low Carbon Blue Ammonia

    Low-Cost, Low Carbon Blue Ammonia 19 Proven ammonia production technology combined with CCS Potential source of long-term, delivers clean cost-competitive, low carbon ammonia production economical low carbon ammonia supply For personal use only A unique opportunity ▸ Proven technology ▸ Established

  20. Slide 20: Gas: Large drill-ready gas prospect

    Gas 20 Large drill-ready gas prospect Resource scale For personal use only • Multi-prospect, multi-play permit within proven hydrocarbon fairways • Ready-to-drill Leander Prospect with 1.1 TCF Prospective Gas Resource • Further 0.9 TCF gas opportunities in same fairway (Harrier, Hawk, Warbler) • Add

  21. Slide 21: Fast-track, Low CAPEX development potential

    Fast-track, Low CAPEX development potential 21 Commercially attractive development matching market demand ▸ First gas possible in 2028 to coincide with increased demand For personal use only ▸ LNG export potential for 85% (permit is in Commonwealth waters) ▸ PRRT credits in WA-481-P for 3 wells and

  22. Slide 22: Fast Track Development Strategy

    Conceptual development 22 Fast Track Development Strategy For personal use only • Drill Leander Prospect on 2D mid-CY 2027 • Sanction Phase 1 development by 2028/29 to meet forecast gas market supply shortage • Execute low risk 4-well development targeting initial 150 TJ/day production • Conduct 3D

  23. Slide 23: Financing Initiatives

    Financing Initiatives 23 $5.9 million multi-year PRRT refund revolving For personal use only debt facility available through FY2027 Petroleum Resources Rent Tax (PRRT) refund Funds 40% of ongoing ADRE expenditure as incurred debt financing with Substantially reduces upfront funding burden Finport Fi

  24. Slide 24: Why Invest? A Unique Value Proposition

    Why Invest? 24 A Unique Value Proposition For personal use only World-Class project, First mover advantage in WA Experienced Management 01 clear strategy and derisked 02 Carbon Storage (CCS) with global 03 to deliver objectives development pathway and domestic sector tailwinds Existing infrastructur

  25. Slide 25: Contact

    For personal use only Contact Pilot Energy Limited Suite 2, Ground Floor 100 Havelock Street West Perth WA 6005 www.pilotenergy.com.au Brad Lingo Managing Director +61 (0) 408 601 080 blingo@pilotenergy.com.au 25