Alderon Iron Ore Corp · OTC:AXXDF

Alderon Iron Ore — Investor Presentation (March 2017)

23 slides from Alderon Iron Ore's investor presentation, March 2017

  1. Slide 1: Re-booting the Kami Project

    Re-booting the Kami Project Investor Presentation ‖ March 2017 ‖ IRON: TSX 1

  2. Slide 2: Disclaimer

    Disclaimer Special Note Regarding Forward-Looking Information This presentation contains "forward-looking information" within the meaning of the U.S. Private Securities Litigation Reform Act and Canadian securities laws concerning anticipated developments and events that may occur in the future. For

  3. Slide 3: Recent Developments

    Recent Developments Updated PEA Improving Iron complete Ore market Chinese demand is Activity in the expected to be Labrador Re-scoping with Prices recently hit strong through Trough is improved market $90/tonne for the 2020 resuming fundamentals and first time in 2 years lower capex requirements 3

  4. Slide 4: Future of Iron Ore

    Future of Iron Ore • Increased supply was significant factor on the weakening of the iron ore price • Majors need to strike balance between oversupply and threatened margins • Urbanization in developing nations is driving demand for steel, led by strong growth in China - Globally, roughly 2 billion

  5. Slide 5: Key Events Leading to PEA

    Key Events Leading to PEA • December 2012, Alderon issued its NI 43-101 Report summarizing the results of its Feasibility Study on the Kami Project. • May 2013, Alderon announced the award of the EPCM contract for advancing the project. • August 2013, Alderon announces placement of order for new AG

  6. Slide 6: PEA Highlights

    PEA Highlights $1.4B • • • Capital and operating costs significantly reduced $897.5M estimated Initial Capital Cost (USD) Utilization of idling neighbouring assets NPV @ 8% discount rate (USD) 6

  7. Slide 7: Capital savings at the mine site

    Capital savings at the mine site Tailings Management Facility • No dam construction for the first 10 years • Large reduction in pipe and pump requirement $374.5M Railway, Roads, and Bridges • No dam construction for the first 10 years • Large reduction in pipe and pump requirement Capital Cost Savin

  8. Slide 8: Reduction in Capex due to re-scoping of project

    Reduction in Capex due to re-scoping of project Comparison Points 2017 Re-Scoped PEA* 2012 Feasibility Study* Annual Production (65.2% Fe con) 7.8Mtpa 8.0Mtpa Initial CAPEX $897.5M $1,272.9M Cash operating cost (FOB) $31.05/t $42.17/t Payback period 3.9 years 3.1 years Measured and Indicated Resourc

  9. Slide 9: Summary of Capex & Opex

    Summary of Capex & Opex Estimated Average LOM Operating Costs Estimated Capital Costs (M$ US) (US $/t Dry Concentrate) Mine (Including Pre-Stripping) $ 91.8 Mining $ 11.16 Mineral Processing $ 286.3 Mineral Processing $ 5.55 Site Infrastructure and Utilities $ 195.9 General Site $ 0.50 TOTAL DIRECT

  10. Slide 10: Kami's OPEX is projected to be lower than Bloom Lake

    Kami’s OPEX is projected to be lower than Bloom Lake* OPEX/Tonne $50.00 $44.62 $45.00 $40.00 $35.00 $31.08 $30.00 $25.00 $20.00 $15.00 $10.00 $5.00 $0.00 Bloom Lake Kami Kami has 30.4% lower OPEX *Based on comparison of Champion Iron’s Feasibility Study announced February 16, 2017 and Alderon’s PEA

  11. Slide 11: Port Access Secured & Power Agreements Completed

    Port Access Secured & Power Agreements Completed Access to infrastructure • Construction of C$220M multi-user port complete • Secured access to the facility in return for a C$20M investment • Multi-user platform in deep water up to 23 meters, suitable for large cape-size vessels (250,000dwt) • Loadi

  12. Slide 12: Tailings Management Facility ("TMF")

    Tailings Management Facility (“TMF”) Opportunity exists for 100% of Kami Cost of environmental and tailings Tailings to be put in Scully pit management expected to be US$1.04/t 22.9 Mtpa of ROM material expected to produce a Use of Scully Mine will produce cost - 7.8 Mtpa of concentrate savings - 15

  13. Slide 13: Kami Project Optimization

    Kami Project Optimization Scully Now Kami Flowsheet Assumptions Rose Pit Pit TMF • Rose Pit and Kami crusher designs remain Kami Scully Crusher Crusher • Kami concentrator built adjacent to Scully concentrator Kami Kami Scully Scully • Overland conveyor extended to Tailings Concentrator Concentrator

  14. Slide 14: Canada's premier iron ore district

    Canada’s premier iron ore district • Labrador Trough known for high grade and low impurities • Local skilled workforce of ~15,000 people • Government support is unparalleled • Foreign steelmakers and traders have been active investors in the region in recent years • Low access cost to paved highway

  15. Slide 15: Kami is shovel-ready

    Kami is shovel-ready Project is significantly advanced • Feasibility Study completed – December 2012 • Detailed engineering at 52% at the time of suspension in June 2014 • • Post-EA permitting process on-track 30% 3D process model review completed Steps • Major long-lead equipment committed being •

  16. Slide 16: Numerous Milestones Achieved

    Numerous Milestones Achieved Project largely de-risked Project • Procurement planning; orders for long lead items (complete) Development • Construction permits (on track) • Port of Sept-Iles Agreement (complete) Infrastructure • Power Purchase Agreement (complete) Agreements • Rail Agreements (acces

  17. Slide 17: What sets us apart...

    What sets up apart… Location Infrastructure Partners Management Labrador Trough Ideally Located Strategic Partnerships Capable Team • Safe & stable • 14.5 km to • HBIS Group • Hands-on jurisdiction common-carrier development & railway with 80Mtpa • Liberty Metals & operating experience • Long histor

  18. Slide 18: Strong partners with 100% of production committed

    Strong partners with 100% of production committed • HBIS Group (formerly Hebei Iron & Steel) is China’s second largest steelmaker and has invested a total of C$182.2M to date & will purchase 60% of annual production • C$119.9M in project equity for 25% interest in the Kami Project • C$62.3M in corpo

  19. Slide 19: Management Team

    Management Team  Over 20 years’ experience in public markets with strong focus on junior mining, including capital-raising and corporate development Mark J. Morabito, B.A. J.D.  Founding partner in Alderon - led team that struck an off-take agreement with HBIS Group, China’s second largest Chairma

  20. Slide 20: Board of Directors

    Board of Directors  Over 20 years’ experience in public markets with strong focus on junior mining, including capital-raising and corporate development Mark J. Morabito  Founding partner in Alderon - led team that struck an off-take agreement with HBIS Group, China’s second largest B.A. J.D. steel

  21. Slide 21: Capital Structure

    Capital Structure Share Structure as of February 28, 2017 $0.80 Shares Outstanding (IRON: TSX) 132,134,061 52 week high Options 4,760,000 Warrants 5,241,436 Fully Diluted 152,111,253 $0.08 Cash & Cash Equivalents CDN $8.85M 52 week low (as Of December 31, 2016) Current share price* $0.55 27% Retail

  22. Slide 22: Investment Highlights

    Investment Highlights Improved market Iron ore market is improving fundamentals with Chinese demand and lower capex requirements expected to remain strong with through 2020 re-scoped project Ideal location with access to Ability to capitalize on existing low cost utilities, transport and infrastruct

  23. Slide 23: Contact Information

    Contact Information Jennifer Paterson, Manager of Corporate Development Phone: 604-681-8030 ext. 248 Email: info@alderonironore.com Mailing Address 1240 – 1140 West Pender Street Vancouver, BC V6E 4G1 www.alderonironore.com IRON: TSX 23