Slide 1: Advancing the Gold-Copper Gabbs Project
Advancing the Gold- Copper Gabbs Project June 2025 TS X - V:P G LD / O TCQ B:P G LDF
Slide 2: Cautionary Statement
Cautionary Statement Forward-Looking Information This presentation contains "forward-looking information” within the meaning of applicable securities laws that is intended to be covered by the safe harbors created by those laws. “Forward-looking information” includes statements that use forward-look
Slide 3: Why Invest?
Why Invest? (TSX-V: PGLD) Advancing the PEA-stage, gold-copper Gabbs Project in Nevada to production Excellent exploration upside at Gabbs targeting five million plus ounces gold equivalent Management aligned with shareholders: 23% management ownership 3
Slide 4: Gabbs Project Advancing to Production in Nevada
Gabbs Project Advancing to Production in Nevada Gold and Copper with N E VA D A Excellent Infrastructure Reno PEA Stage Gabbs N E VAD A Accessible by paved highway Gabbs Gabbs Powerline crossing the Project Las Vegas Project Water permit expected in Q2/25 Walker Lake Gold Equivalent Minera
Slide 5: Gabbs Project Mineralized Zones - Plan View
Gabbs Project Mineralized Zones - Plan View(1) 543 lode mining claims (BLM) and one patented claim covering approximately 45.25 km2 (16 square miles) Sullivan, Lucky Strike and Gold Ledge Zones – Gold, Copper &Lucky Silver Strike- Porphyry Mineralization Car Body Zone – Gold & Silver – Low Sul
Slide 6: Gabbs Project Mineral Resource Estimate April 2024
Gabbs Project Mineral Resource Estimate April 2024 April 2024 Mineral Resource Estimate(1)(2) Mineral Gold Silver Copper Gold Eq. Resource Tonnes Grade Grade Grade Gold Silver Copper Grade Gold Eq. Category (M) (g/t) (g/t) (%) (M oz) (M oz) (M lbs) (g/t) (M oz) Indicated 49.8 0.45 1.36 0.27 0.72 2.1
Slide 7: Gabbs Project 2024 PEA Economics
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Economics(1) Low Case Base Case High Case Spot Case(2) Gold Price (US$/oz) $1,800 $1,950 $2,100 $3,412 Silver Price (US$/oz) 22.50 25.00 27.50 33.15 Copper Price (US$/lb) $4.00 $4.50 $5.00 $4.31 Net Revenue (US$) $4.2 billion $4.
Slide 8: 2024 PEA Plan of Operations Years 1-5
Gabbs Project 2024 PEA Plan of Operations(1) Years 1 – 5 Metallurgical Recoveries: Gold: 78% Copper: 54% Open Pit Heap Leach Copper Gold Gold Doré Mining Recovery Recovery Copper 9 million tonnes per year (SART Plant) (ADR Plant) Concentrate (1) See the Gabbs Technical Report dated May 17, 2024 avai
Slide 9: 2025 Metallurgical Program
Gabbs Project Advancing to Production in Nevada 2025 Metallurgical Program Increase oxide gold and copper recoveries Produce SART copper concentrate for market evaluation SART Plant(2) Sulphidization (S), acidification (A), recycling of the copper precipitate (R), and thickening of the copper
Slide 10: 2024 PEA Plan of Operations Years 6-14.2
Gabbs Project 2024 PEA Plan of Operations(1) Years 6 – 14.2 Metallurgical Recoveries: Gold: 78% Copper: 54% Heap Leach Copper Gold 4 million Recovery Recovery tonnes per (SART Plant) (ADR Plant) year Gold Dore Open Pit and Mining Copper Concentrate Mill Copper Leach 5 million Flotation Flotation 5 m
Slide 11: 2024 PEA Production Metrics (14.2-year LOM)
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Production Metrics (14.2-year LOM)(1) Life of Mine Gold Equivalent Production Average Annual Gold Equivalent Production at Base Case Metal Prices(2)(3) at Base Case Metal Prices(2) 3,000,000 200,000.00 Gold Equivalent Ounces Gold
Slide 12: 2024 PEA Projected Mining and Production Summary
Gabbs Project 2024 PEA Projected Mining and Production Summary (Oz AuEq) Projected LOM Gold, Copper and Silver Production(1)(2) At Base Case Metal Prices 250000 200000 150000 100000 50000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Gold Production (oz) Copper Production (oz AuEq) Silver Production (oz AuE
Slide 13: Nevada - a Tier 1 Mining Jurisdiction
Gabbs Project Advancing to Production in Nevada Nevada - a Tier 1 Mining Jurisdiction Based on the Gabbs Project 2024 PEA(1), the Gabbs Project would be Nevada’s: Fourth largest gold producer(2), at average annual gold production of 104,000 ounces of gold Third largest copper producer(2) at aver
Slide 14: Gabbs Project 2024 PEA Capital Costs
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Capital Costs(1) Preproduction Capital Costs Production Capital Costs (USD) (USD) $56,400,000 $14,200,000 $92,200,000 $68,500,000 Reclamation and Working Capital and Other Mining Closure Initial Fills $141,700,000 Mining & Other
Slide 15: Gabbs Project 2024 PEA Operating Costs
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Operating Costs(1) Life of Mine Operating Costs $0.73/t $1.55/t mined $13.64/t $10.70/t Mining ($/tonne mined)(2) Heap Leach Processing ($/tonne) Mill Processing ($/tonne) G&A ($/tonne) (1) See P2 Gold news release dated May 22,
Slide 16: Gabbs Project 2025 Plans
Gabbs Project Advancing to Production in Nevada Gabbs Project 2025 Plans(1) Re-permit water (underway) Metallurgical testing to investigate improving gold and copper oxide recoveries (underway) Continue environmental baseline collection File mining plan of operations with BLM Commence infi
Slide 17: 2024 PEA Identified Opportunities
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA(1) Identified Opportunities Metallurgy – complete additional test work to increase recoveries for gold and copper mineralization (underway) Mine plan – optimize mine sequencing to increase return on capital and carryout geote
Slide 18: Advancing Gabbs: Road and power accessible, good topography
Advancing Gabbs Road and power accessible, good topography Planned location of mining facilities View from Lucky Strike Zone looking north towards town of Gabbs 18
Slide 19: Planned Schedule for Production
Advancing Gabbs Planned Schedule for Production(1) Actions 2025 2026 2027 2028 2029 Water Permit Metallurgy Environment Drilling Plan of Operations Feasibility Study Permitting Detailed Engineering Construction Production (1) Subject to availability of financing and permitting 19
Slide 20: P2 Gold's Proven Management Team
P2 Gold’s Proven Management Team Joe Ovsenek, President & CEO Pretium Resources Inc., Silver Standard Resources Inc. & Canplats Resources Inc. Ken McNaughton, Chief Exploration Officer Pretium Resources Inc., Silver Standard Resources Inc. & Canplats Resources Inc. Michelle Romero, Executive Vice Pr
Slide 21: P2 Gold Share Structure
P2 Gold Share Structure Cash and Ownership(1) Equity Structure Equity Ownership Issued and Outstanding 152,161,706 Waterton Management Stock Options Outstanding(2) 6,983,333 & Board 15.5% 23.0% Warrants Outstanding(3) 48,765,007 Convertible Debenture Shares(4) 11,895,000 Fully Diluted 219,805,046 61
Slide 22: Appendix
Gabbs Project Advancing to Production in Nevada Appendix 22
Slide 23: Flow Sheet Crushing & Heap Leach (Years 1-5)
Gabbs Project Advancing to Production in Nevada Gabbs Project Flow Sheet Crushing & Heap Leach (Years 1 - 5)(1) (1) See the Gabbs Technical Report dated May 17, 2024 available under the Company’s profile on SEDAR+ at www.sedarplus.com and on 23 the Company’s website at www.p2gold.com.
Slide 24: Flow Sheet Mill (Years 6-14.2)
Gabbs Project Advancing to Production in Nevada Gabbs Project Flow Sheet Mill (Years 6 – 14.2)(1) (1) See the Gabbs Technical Report dated May 17, 2024 available under the Company’s profile on SEDAR+ at www.sedarplus.com and 24 on the Company’s website at www.p2gold.com.
Slide 25: 2024 PEA Projected Processing and Production Summary
Gabbs Project 2024 PEA Projected Processing and Production Summary(1) Tonnes Gold Silver Copper Gold Process Grade Grade Grade Gold Silver Copper Equivalent Ox/S(2) Ox/S(2) Ox/S(2) Ox/S(2) Production Production Production Production(2) Year (k t) (g/t) (g/t) (%) (k oz) (k oz) (t) (k oz) 9,000/ 0.78/
Slide 26: 2024 PEA Production Metrics
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Production Metrics(1) LOM Gold Equivalent Production(2) (oz) 2.46 million LOM Gold Production (oz) 1.47 million LOM Silver Production (oz) 2.06 million LOM Copper Production (t) 190 thousand Average Annual Gold Equivalent Product
Slide 27: Gabbs Project 2024 PEA Capital Costs
Gabbs Project Advancing to Production in Nevada Gabbs Project 2024 PEA Capital Costs(1) Capital Costs (US$ in millions) Mining (including contingency of 10%) $68.5 Process, Heap Leach (including contingencies of up to 25%) $204.8 Other (including contingencies) $92.2 Total Pre-Production Capital $36
Slide 28: View Sullivan Zone from Lucky Strike Zone
Advancing Gabbs View Sullivan Zone from Lucky Strike Zone Planned location of mining facilities 28
Slide 29: P2 Gold Inc. Contact
TSX-V:PGLD OTCQB:PGLDF FRA:4Z9 P2 Gold Inc. 1100, 355 Burrard Street Vancouver, BC V6C 2G8 www.p2gold.com Contact: Joe Ovsenek, President & CEO jovsenek@p2gold.com info@p2gold.com