Slide 1: Q3 2018 Conference Call
Q3 2018 CONFERENCE CALL November 9, 2018
Slide 2: Cautionary Notes
Cautionary Notes SSRM:NASDAQ/TSX PAGE 2
Slide 3: Q3 2018: Delivered Our Strongest Quarter Year-to-Date
Q3 2018: Delivered Our Strongest Quarter Year-to-Date Increased gold equivalent production to 95,000 ounces at lower cash costs Doubled operating cash flow and increased attributable earnings Achieved operating records at Marigold and Seabee Improved 2018 guidance Key milestones achieved a
Slide 4: Marigold Mine: Q3 2018 Results
Marigold Mine: Q3 2018 Results Produced 58,459 oz of gold, an 18% increase compared to Q2 Record material movement of 21.3M tonnes at lower mining costs of $1.51/t Positive impact from four new haul trucks Reported cash costs of $711/oz gold Reported AISC of $965/oz gold Improving 2018 c
Slide 5: Seabee Gold Operation: Q3 2018 Results
Seabee Gold Operation: Q3 2018 Results Record production of 27,831 oz of gold Mill throughput increased to 959 tonnes per day Record single day throughput of +1,440 tonnes Reported record cash costs of $447/oz gold Reported record AISC of $596/oz gold Improving 2018 production and cash c
Slide 6: Puna Operations: Q3 2018 Results
Puna Operations: Q3 2018 Results Produced 0.7M oz of silver, more than doubled zinc production to 3.2M lbs Successfully test processed Chinchillas ore, produced saleable concentrates Plant shutdown completed safely, under budget, and ahead of schedule Reported cash costs of $17.41/oz silver
Slide 7: Chinchillas Project Development On Track
Chinchillas Project Development On Track Pre-stripping advancing as planned Key milestones: completed stockpile dome, road by-passes, power line upgrade Commercial production expected Q4 2018 Project remains on budget Pre-stripping activities advancing as planned Road by-passes operational S
Slide 8: Marigold Exploration Update
Marigold Exploration Update Focused on Mineral Resource Upgrade at Red Dot and Mackay A September 2018 Pit EOY 2017 Mackay Original Surface EOY 2017 A’ EOY 2017 Gold Surface Reserve Pit Resource Pit Shell grade model MRA6743 Gold Grade (g/t) 62.5 m at 1.45 g/t < 0.06 Incl. 10.7 m at 6.82 g/t 0.06 –
Slide 9: Seabee Exploration Update
Seabee Exploration Update Near-mine drilling at Santoy yielding significant results Santoy Gap (9A, 9B, 9C) Santoy 8A 0m Elev 3.2m at 32.2g/t (JOY-18-810) 2.6m at 27.5g/t (JOY-18-807) 4.1m at 17.0g/t (JOY-18-801) 4.8m at 12.0g/t (JOY-18-799) 2.7m at 18.4g/t (JOY-18-772) 10.7m at 3.7g/t Santoy (JOY-1
Slide 10: Santoy Gap Hanging Wall
Santoy Gap Hanging Wall Recent drilling confirms discovery near existing infrastructure Note: Please see our news release dated November 6, 2018 for further details. SSRM:NASDAQ/TSX PAGE 10
Slide 11: Selected Financial Results for Q3 2018
Selected Financial Results for Q3 2018 Units Q3 2018 Q2 2018 Q3 2017 Gold Sales oz 88,787 67,156 60,616 Silver Sales Moz 0.6 1.1 2.1 Total Gold Equivalent Sales oz 96,760 81,595 88,029 Gold Equivalent Production oz 94,808 85,082 77,105 Revenue $M $115.0 $104.0 $106.0 Income from Mine Operations $M $
Slide 12: Financial Strength Continues to be an Advantage
Financial Strength Continues to be an Advantage Units Q3 2018 Q2 2018 Cash $M $475 $494 Total Assets $M $1,504 $1,505 Current Liabilities $M $82 $88 Working Capital $M $649 $672 SSRM:NASDAQ/TSX PAGE 12
Slide 13: Delivering Growth and Value for Shareholders
Delivering Growth and Value for Shareholders Delivered strong operating performance Solid financial performance with increased operating cash flow and attributable earnings Improved 2018 guidance On track to meet or exceed full year guidance for seventh consecutive year Exploration program