Ssr Mining Inc. · NASDAQ:SSRM

Ssr Mining — Technical Presentation (September 2026)

33 slides from Ssr Mining's technical presentation, Sep 30, 2026

  1. Slide 1: Cripple Creek & Victor Site Tour

    CRIPPLE CREEK & VICTOR SITE TOUR SEPTEMBER 30, 2026

  2. Slide 2: Cautionary Notes

    Cautionary Notes Cautionary Note Regarding Forward-Looking Information and Statements Except for statements of historical fact relating to us, certain statements contained in this presentation constitute forward-looking statements, forward-looking information, future oriented financial information,

  3. Slide 3: Executive Summary Highlights

    Executive Summary Highlights • CC&V is a cornerstone asset with potential to The Present: (1, 2, 3) become a multi-decade operation • CC&V is operating in line with guidance & 2025 TRS estimates since acquisition • Its acquisition reinforced SSR Mining’s proven • 2.7Moz Mineral Reserves underpin ini

  4. Slide 4: Americas-Focused Portfolio Delivering Free Cash Flow, Capital Returns and Growth

    Americas-Focused Portfolio Porky Seabee Delivering Free Cash Flow, Capital Returns and Growth (1) Amisk Diversified 4 Producing 3 Largest U.S. RD Marigold NSR Royalty Portfolio Dobbin Mines Gold Producer Hod Maden (Lidya Mines) – 4% NSR Portfolio Buffalo Valley New Millenium CC&V Pitarrilla (Endeavo

  5. Slide 5: Proven Track Record of Value Creation

    Proven Track Record of Value Creation (2) Increasing Per Share Value (1) Capital Returns Track Record Consolidated Consensus Consolidated Consensus 2021 – 2026 NAV Per Share Cash Flow Per Share Dividends Share buybacks • Since 2021, repurchased $883M $409M +32 million shares +275% +660% $39.40 $4.96

  6. Slide 6: Third Largest Gold Producer in the USA

    Third Largest Gold Producer in the USA Nearly 6Moz of Gold Mineral Reserves in the US ▪ CC&V hosts 2.7 Moz of gold Mineral Reserves, plus an additional 4.8 Moz of M&I Mineral Resources (exclusive of Reserves) and 2.0 Moz of Inferred Mineral Resources ▪ Combined with the Marigold gold mine in Nevada,

  7. Slide 7: CC&V: 2025 TRS Based on 2.7Moz Au Reserves

    CC&V: 2025 TRS Based on 2.7Moz Au Reserves Initial 12-Year Mine Life with Nearly $2B NPV5% at Spot Gold Prices & Significant Upside Potential Production Summary 12-year operating mine life; 26-years of total production (1) Financial & Operating Highlights As shown in 2025 TRS 5-Yr Avg Production: 13

  8. Slide 8: CC&V: Delivering to Plan

    CC&V: Delivering to Plan Operational Commentary (1) Cripple Creek Grassy Valley Globe Hill ▪ From February 28, 2025 to December 31, 2025, CC&V produced 124.6 koz gold, Offices exceeding FY guidance of 90 to 110 koz Schist Island ▪ Inclusive of first two months of 2025, FY2025 production totaled 152.

  9. Slide 9: Unlocking Longer-Term Value Through Future Permitting

    Unlocking Longer-Term Value Through Future Permitting​​ Nearly 5Moz of M&I Resources and 2Moz of Inf. Resources Support Potential for Significant LOM Extension • Current Mineral Reserves & CC&V Reserves and Resources LOM plan based on Mineral Reserves ($1,700/oz) Amendment 14 application Mineral Res

  10. Slide 10: Safety Initiatives

    Safety Initiatives • Corporate deployment of the I Care, We Care philosophy began mid- Our Purpose 2026, outlining a core philosophy in how we lead, how we look out for one another, and how we manage risk • I Care, We Care focuses on: To create value and leave a legacy through • Visible, value-drive

  11. Slide 11: CC&V: Part of Colorado's History

    CC&V: Part of Colorado’s History​ DID YOU KNOW? The gold leaf on the Colorado Capitol dome was donated from CC&V both for its original construction in 1908 and restoration in 2013. SSR MINING | 11

  12. Slide 12: CC&V District Mining History

    CC&V District Mining History ​ The “World’s Greatest Gold Camp” Continues 1890+ 1950 1985 1999 2015 2022 2025 Gold Discovered at By 1950, nearly 20 million Heap-leaching operations AngloGold purchases Newmont acquires 100% Milling operations idled in SSR Mining’s acquisition Poverty Gulch in the oun

  13. Slide 13: CC&V District Mining History

    CC&V District Mining History ​ Prolific Gold Camp with More Than 25Moz Produced since Late-1800s Cripple Creek Gold Mining District Production (Troy Ounces) Hoosier 15k 1,000koz 35Moz Sunshine Annual Production 25k Cumulative Production Gold King 900koz 30Moz 320k 800koz 700koz 25Moz Abe Lincoln Ara

  14. Slide 14: Modern Mining: Economic Impact Study

    Modern Mining: Economic Impact Study The Cripple Creek & Victor Gold Mine is a Significant Contributor to Colorado’s Economy Economic Contribution 2025 Economic Contribution of CC&V Mine by Region ($M) • In 2025, the CC&V gold mine contributed $635M to the Teller County and generated $830 million in

  15. Slide 15: CC&V District Geology Overview

    CC&V District Geology Overview • CC&V is an alkalic low-sulfidation epithermal gold deposit, hosted in a volcanic • Two styles of mineralization are present: diatreme emplaced within Proterozoic-aged basement granites and gneisses 1. low-grade disseminated and microfracture- • Emplacement of the alk

  16. Slide 16: Current Operations: Mining

    Current Operations: Mining Mining Overview 2025 CC&V TRS Operating Metrics Summary Unit Life of Mine ▪ CC&V is operated using conventional open pit mining methods and utilizes two valley Total Material Mined Mt 373 leach facilities (VLFs) for gold recovery Average Daily Mining Rate ktpd 85 ▪ Deposit

  17. Slide 17: 2025 TRS Life of Mine Plan

    2025 TRS Life of Mine Plan Contained Ounces Mined by Area 7% 4% 5% Globe Hill Complex 38% 10% Granite Island North Cresson 36% Globe Hill Complex Granite Island South Cresson Complex North Cresson East Cresson Elkton / Joe Dandy East Cresson Elkton / Joe Dandy • Majority of Mineral Reserves in 2025

  18. Slide 18: Current Operations: Processing

    Current Operations: Processing VLF Processing Overview Overview: VLF2 • First ore stacked October 2015​ ▪ Ore stacking is currently active on VLF2, which • 175M tonnes placed to date was commissioned in 2015 as stacking at VLF1 • Phase 3 expansion completed in 2024 ceased • VLF2 Phase 4 expansion su

  19. Slide 19: Nearly 3 Million Meters of Historical Drilling Across Property

    Nearly 3 Million Meters of Historical Drilling Across Property Extensive Historical Drilling Activity at CC&V Reduces Technical Risk of Future Expansions • As of December 31, 2024, prior operators had completed a total of 17,627 exploration drill holes at CC&V for approximately 2.8 million meters of

  20. Slide 20: Mining and Processing Cost Overview

    Mining and Processing Cost Overview Continuing to Prioritize Business Improvement Initiatives to Manage Costs ▪ Costs continue to trend well against TRS plans and budgets, inclusive of higher than forecast diesel prices YTD in 2026 ▪ Fuel & electricity historically represent 10-15% of CC&V operating

  21. Slide 21: Current Operations: Workforce

    Current Operations: Workforce Employee Retention ▪ Total employee turnover has remained steady at 17-18% since acquisition ▪ I Care, We Care safety culture rollout built on our "Courage to Care" philosophy ▪ This rollout includes risk education workshops and in-field coaching for the workforce ▪ Ann

  22. Slide 22: CC&V Closure & Contingent Payments

    CC&V Closure & Contingent Payments Transaction Structure Meaningfully De-Risked Acquisition and Provided Closure Liability Protection Closure & Reclamation Transaction Consideration Total: $275M Acquisition Close Paid Estimated Asset Retirement Obligation in 2025 TRS: $517M $100M Upfront Cash Consid

  23. Slide 23: Appendix & Endnotes

    Appendix & Endnotes SSR MINING | 23

  24. Slide 24: CC&V Supplemental Mineral Reserve and Mineral Resource Information

    CC&V Supplemental Mineral Reserve and Mineral Resource Information The Mineral Reserves and Mineral Resources (“MRMR”) information should be read in conjunction with Item 2. Properties in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025 filed on February 17, 2026, the Te

  25. Slide 25: Endnotes

    Endnotes Disclosures & References Mineral Reserves and Mineral Resources Capital Returns Track Record The Mineral Reserves and Mineral Resources (“MRMR”) information should be read in conjunction with Item 2. Properties in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025

  26. Slide 26: Non-GAAP Reconciliations

    Non-GAAP Reconciliations We have included certain non-GAAP performance measures throughout this document to assist in understanding our financial results. These performance measures are employed by us to measure our operating and economic performance internally and to assist in decision-making, as w

  27. Slide 27: Non-GAAP Reconciliation (Continued)

    Non-GAAP Reconciliation (Continued) Cash Costs and AISC Cash Costs and All-In Sustaining Costs (“AISC”) per payable ounce of gold and respective unit cost measures are non-U.S. GAAP metrics developed by the World Gold Council to provide transparency into the costs associated with producing gold and

  28. Slide 28: Non-GAAP Reconciliation (Continued)

    Non-GAAP Reconciliation (Continued) 2026 Operating Guidance Guidance as of August 4, 2026 is neither being updated nor reaffirmed hereby. The following table provide a reconciliation of our projected cost of sales to projected cash costs and projected AISC used in the calculation of full-year projec

  29. Slide 29: Non-GAAP Reconciliations (Continued)

    Non-GAAP Reconciliations (Continued) Free Cash Flow and Mine Site Free Cash Flow The Company uses free cash flow and mine site free cash flow to supplement information in its condensed consolidated financial statements. The most directly comparable financial measure prepared in accordance with GAAP

  30. Slide 30: CC&V Site Tour Notes

    CC&V Site Tour Notes SSR MINING | 30

  31. Slide 31: CC&V Site Tour Notes

    CC&V Site Tour Notes SSR MINING | 31

  32. Slide 32: CC&V Site Tour Notes

    CC&V Site Tour Notes SSR MINING | 32

  33. Slide 33: SSR Mining Inc.

    SSR Mining Inc. 6900 E. Layton Avenue, Suite 1300 Denver, Colorado 80237, USA U.S. and Canada toll-free: 1-888-338-0046 Telephone: +1-303-292-1299

SSR Mining — Technical Presentation (September 2026) on 6ix