Viridis Mining And Minerals Limited · ASX:VMM

Viridis Mining And Minerals — Investor Presentation (September 2023)

19 slides from Viridis Mining And Minerals's investor presentation, September 2023

  1. Slide 1: Colossus Ionic Clay Project

    COLOSSUS IONIC CLAY PROJECT Unlocking a new frontier of Rare Earths in the Poços De Caldas Alkaline Complex Investor Presentation September 2023

  2. Slide 2: Important Information and Disclaimer

    IMPORTANT INFORMATION AND DISCLAIMER This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document has been prepared by Viridis Mining & Minerals Ltd (the Company, VMM, Viridis Mining and Minerals). This document is neither a prospectus no

  3. Slide 3: Corporate Summary

    CORPORATE SUMMARY CAPITALISATION CAPITALISATION DATA DATA(1) CONTACT Current shares on Issue1 45,739,556 Agha Shahzad Pervez Shannon Robinson & Carly Share Price 2 $0.99 Executive Chairman Terzanidis Joint Company Secretaries Market Capitalisation (MC) $45.28 Million BALANCE SHEET agha@viridismining

  4. Slide 4: Board and Management

    BOARD AND MANAGEMENT Australian Board Mr Agha Shahzad Pervez Mr Faheem Ahmed Mr Timothy Harrison Mr Christopher Gerteisen Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director Mr Agha Shahzad Pervez is an experienced Mr Ahmed holds a Bachelor of Engineering and Mr H

  5. Slide 5: Poços De Caldas Alkaline Complex

    Poços De Caldas Alkaline Complex Unlocking the true geological potential of the Colossus Project

  6. Slide 6: Colossus – Ideal Location

    COLOSSUS – IDEAL LOCATION Poços De Caldas Largest Alkaline Complex in Southern Hemisphere ▪ Located on the southern border of Minas Gerais, Brazil – A Tier 1 Mining Jurisdiction ▪ Local community is supportive of mining operations with numerous bauxite, phosphate and clay mines and chemical World Th

  7. Slide 7: Colossus – Strategic Land Position

    COLOSSUS – STRATEGIC LAND POSITION Strategic Importance of Land Position ▪ Proven IAC REE geology in the Poços De Caldas (“PDC”) Alkaline Complex. ▪ Viridis secured a rare opportunity for a large consolidation of areas to develop a substantial Rare Earth Operation in PDC. ▪ Remainder of significant

  8. Slide 8: Colossus Project

    COLOSSUS PROJECT Current exploration activities

  9. Slide 9: Colossus – Project Background

    COLOSSUS – PROJECT BACKGROUND Acquisition Background ▪ Binding agreement signed to acquire 100% of REE rights in Colossus, covering an area of ~91km2 in Poços De Caldas Complex, Brazil. ▪ Contiguous to the world class Caldeira Ionic REE deposit (409Mt @2,626ppm TREO¹). ▪ USD $1M upfront which has be

  10. Slide 10: Colossus – Project Summary

    COLOSSUS – PROJECT SUMMARY Geological Highlights ▪ A total of 34 historic holes were completed by The Colossus Project has never been tested beyond 3 metres hand-held auger to a depth of 3 metres. All into the “REE Accumulation” Zone holes were drilled from surface and ended in mineralisation⁴: - 3m

  11. Slide 11: Colossus – A True Ionic Clay REE Project

    COLOSSUS – A TRUE IONIC CLAY REE PROJECT Ionic Clay1 “REE in Clay” Hard Rock The Ionic Advantage ▪ Despite lower grades & recoveries of Ionic Clay Rare Earths, the extraction of Ionic Clays is multi-folds LEACHING Ammonia Sulfate HCl, Nitric Acid, Sulfuric HCl, Nitric Acid, Sulfuric cheaper from an

  12. Slide 12: Colossus – Drilling Commenced

    COLOSSUS – DRILLING COMMENCED Colossus Drilling ▪ Phase I of maiden drilling program will focus on Mining Licenses which are adjacent to the Dona Maria 1 & 2 IAC resource. ▪ Three auger rigs mobilised which will be able to test depth extensions of historic 3m auger holes. ▪ Phase II will focus on So

  13. Slide 13: Rare Earths Market

    RARE EARTHS MARKET Developing a new supply chain of Critical Metals

  14. Slide 14: Rare Earths – Race to Develop Western Supply Chain

    RARE EARTHS – RACE TO DEVELOP WESTERN SUPPLY CHAIN Poços De Caldas Alkaline Complex presents an opportunity Source: N.LePan, Visual Capitalist, 2021 to be the next South China Rare Earth Hub “Significant investment by governments in the US, the EU and Australia is now going into rare earths…However,

  15. Slide 15: Rare Earths – Technology Metal for a Green Future

    RARE EARTHS – TECHNOLOGY METAL FOR A GREEN FUTURE EACH HYBRID VEHICLE USES 4.5KG OF REE ON AVERAGE FORECAST NdFeB MAGNET CONSUMPTION UV Glass: Cerium Glass Polishing Powder: Cerium Fuel Additive: LCD Display: Europium, Cerium, Yttrium, Cerium Lanthanum Exponential demand growth into 2030 Sensors: Yt

  16. Slide 16: Investment Highlights

    INVESTMENT HIGHLIGHTS Right asset, right location with a fast-moving team

  17. Slide 17: Colossus Project Anticipated Work Program – Newsflow

    COLOSSUS PROJECT ANTICIPATED WORK PROGRAM – NEWSFLOW 2023 2024 Q4 Q1 Q2 Q3 Scope of Works Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Phase I & II Drilling Program Wide scale Metallurgical Testing Expansion of Executive Team Maiden Resource Estimate International Roadshows Integration of Downst

  18. Slide 18: Investment Highlights

    INVESTMENT HIGHLIGHTS • Poços De Caldas is unparalleled in terms of • Preliminary met-work from multiple grab samples geology, for both size & grade of Ionic Rare Earths. of Saprolite returned Ionic Mineralisation. • Alkaline Complex homogenously enriched in Rare • Samples underwent NO drying or cru

  19. Slide 19: Thank You

    THANK YOU Further Enquiries: Agha Shahzad Pervez Executive Chairman +61 3 9071 1847 agha@viridismining.com.au Shannon Robinson Carly Terzanidis Joint Company Secretaries +61 3 9071 1847 cosec@viridismining.com.au

Viridis Mining and Minerals — Investor Presentation (September 2023) on 6ix