Viridis Mining And Minerals Limited · ASX:VMM

Viridis Mining And Minerals — Investor Presentation (August 2025)

19 slides from Viridis Mining And Minerals's investor presentation, August 2025

  1. Slide 1: Colossus Ionic Clay Project

    COLOSSUS IONIC CLAY PROJECT Unlocking a new frontier of Rare Earths in the Poços De Caldas Alkaline Complex Investor Pack Investor Presentation August 2025

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer This document is confidential and may not be reproduced, redistributed or passed on, The material is of general background and does not purport to be all inclusive or complete. directly or indirectly. VMM does not take responsibility for updating any information

  3. Slide 3: Corporate Summary

    Corporate Summary Board & Management Capitalisation Data Agha Shahzad Pervez Executive Chairman Current Shares Share Price1 Market Cap1 on Issue1 Rafael Moreno Managing Director & Chief Executive Officer 98.6 Million $1.21 $119 Million Jose Carlos Guedes Non-Executive Director Tim Harrison Non-Execu

  4. Slide 4: Colossus Value Proposition | Progressing Rapidly from Explorer to Producer

    Colossus Value Proposition | Progressing Rapidly from Explorer to Producer Global Resource: 493Mt @ 2,508ppm TREO and 601ppm MREO1 [Nd, Pr, Dy, Tb] World Class Deposit Measured & Indicated: Highest grade MREO IAC resource globally 329Mt @ 659ppm MREO1 → The key driver for operational profitability S

  5. Slide 5: Poços De Caldas | Strategic Land Position in Ideal Location

    Poços De Caldas | Strategic Land Position in Ideal Location Unlocking the True Geological SITE OF Potential of the Colossus Project COLOSSUS PRODUCTION FACILITIES IN THE MUNICIPALITY OF POCOS DE CALDAS Poços De Caldas – Largest Alkaline Complex in Southern Hemisphere and is homogeneously mineralised

  6. Slide 6: Colossus Resource | Globally Significant Size and MREO Content

    Colossus RESOURCE | Globally Significant Size and MREO Content ▶ Highest Grade MREO IAC REE Project at 1,000ppm Cut-Off: 493Mt @ 2,508ppm TREO and 601ppm MREO1 ▶ Highest Grade Measured & Indicated (M+I) MREO REE IAC Resource: 329Mt @ 2,680ppm TREO & 659ppm MREO1 MREO Grade Vs Tonnage of IAC Deposits

  7. Slide 7: Development Strategy | Colossus Starts with Northern Concessions

    Development Strategy | Colossus Starts with Northern Concessions De-risked Pathway to Production Northern Concessions infill drilling showing significant improvement to resource model 1. Submitted Environmental Initial Production Facility to Impact Assessment (‘EIA’) as be located at contiguous part

  8. Slide 8: True Ionic Adsorption Clay | Simple, High Recoveries and Low Impurities

    True Ionic Adsorption Clay | Simple, High Recoveries and Low Impurities The VALUE PROPOSITION of the Colossus project is centred around the true ionic nature, high grade, world-leading recoveries and low OPEX flowsheet proven by ANSTO. Colossus Metallurgy & Flowsheet Unmatched in ALL Facets Industry

  9. Slide 9: Colossus Pre-feasibility Study | Unlocks World-Class Project Economics

    Colossus Pre-feasibility Study | Unlocks World-Class Project Economics PFS July 2025 Parameters Unit Value Driven by its high-grade MREO profile, scalable resource base, and Life of Mine (LOM) years 20 simple/low-cost metallurgy, Colossus stands out as the most economically robust rare earth project

  10. Slide 10: Colossus Pre-feasibility Study | Capital and Operating Costs

    Colossus Pre-feasibility Study | Capital and Operating Costs Project CAPEX Summary: Highly Competitive CAPEX of US $286M (Excl Contingency) ▶ CAPEX grounded on real-world pricing, with over 90% of Cost Element Capital Cost (Million USD) equipment costs sourced from vendor quotations, Equipment Suppl

  11. Slide 11: Strategic Funding Commitments & Offtake Progress

    Strategic Funding Commitments & Offtake Progress Colossus Funded into Early Project Execution : Funding Support up to ~AU$58.5 Million1 Viridis Secures Strategic Partnership3 Project Financing Viridis Selected by BNDES/FINEP to ▶ Signed a landmark binding Memorandum Progress with Joint Support Plan2

  12. Slide 12: Government Support | De-risking the Colossus Environmental Approvals Process

    Government Support | De-risking the Colossus Environmental Approvals Process Agreement with State of Minas Gerais/Invest Minas “Viridis has entered into two crucial non-binding MoUs with the State Government of Minas Gerais ▶ MoU with the Government of Minas Gerais and Invest Minas is a selective in

  13. Slide 13: Downstream Technology | JV For Separation / Refining / Recycling

    Downstream Technology | JV For Separation / Refining / Recycling Viridion JV with Ionic Rare Earths (ASX:IXR) ▶ Viridis positioned to become first producer of refined Rare Earth Oxides (‘REO’) in Brazil, through a JV signed with IXR1. ▶ The JV has exclusive global (excluding Asia and Uganda) rights

  14. Slide 14: Anticipated Project Milestones | Work Program to Initial Production

    Anticipated Project Milestones | Work Program to Initial Production 2025 2026 2027 Project Activities Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Resource Drilling Metallurgical & Flowsheet Testing Met Test Optimisation – Finalise Mine Plan Award ECI / EPCM Contract Commencement of Construction Resource Dev

  15. Slide 15: Thank You

    Thank You Contact Rafael Moreno Managing Director & CEO Phone: +61 3 9071 1847 Email: info@viridismining.com.au Carly Terzanidis Company Secretary Phone: +61 3 9071 1847 Email: cosec@viridismining.com.au viridismining.com.auInvestor Presentation Level 50, 108 St Georges Terrace Perth WA 6000 ASX | V

  16. Slide 16: Glossary

    GLOSSARY • AISC: All In Sustaining Costs • AMSUL: Ammonium Sulfate • ANSTO: Australian Nuclear Science and Technology Organisation • BNDES: Brazilian National Bank for Economic and Social Development • CBE: Commercial Bid Evaluation • ECI: Early Contractor Involvement • EIA: Environmental Impact Ass

  17. Slide 17: Appendix A – Colossus Mineral Resource Estimate (22 January 2025)

    APPENDIX A – Colossus Mineral Resource Estimate (22 January 2025) Source Data – As seen on Slide 4 17 Viridis Mining and Minerals Ltd - Colossus Ionic Clay Project

  18. Slide 18: Appendix B – Peer Comparison Reference Data

    APPENDIX B – Peer Comparison Reference Data Source Data for Peer Comparisons Bubble Chart – As seen on Slide 6 This tables compares IAC projects globally, focusing on total resource tonnage vs MREO Grade, including Nd, Pr, Dy, and Tb oxides - Resource (Mt vs MREO Grade (ppm). References provide deta

  19. Slide 19: Appendix C – Project Blue Consulting Graph

    APPENDIX C – Project Blue Consulting Graph on Slide 10 Project Blue is an independent market intelligence and research consultancy specialising in critical materials and energy transition supply chains, offering comprehensive insights from "mine to market" across more than 30 materials, including ra