Pls Group Limited · ASX:PLS

Pls — Pilbara Minerals — Macquarie Australia Conference 2024

25 slides from Pls's conference presentation, May 8, 2024

  1. Slide 1: Macquarie Australia Conference 2024

    For personal use only 8 May 2024 Macquarie Australia Conference 2024 Dale Henderson Managing Director and CEO ASX: PLS

  2. Slide 2: The largest, independently owned, hard-rock lithium company in the world

    For personal use only The largest, independently owned, hard-rock lithium company in the world 2

  3. Slide 3: Pilbara Minerals – a major lithium materials supplier

    Pilbara Minerals – a major lithium materials supplier For personal use only 100% owner of Tier 1 Asset in leading low risk mining jurisdiction ~34-year mine life with 214Mt at 1.2% Li2O Ore Reserve1 ~140km to Port Hedland by road Production capacity increase to 1mtpa2 under construction Diversificat

  4. Slide 4: March Quarter 2024 highlights

    March Quarter 2024 highlights For personal use only PRODUCTION SALES OPERATIONS 2% vs Dec Q FY24 3% vs Dec Q FY24 P680 Primary Rejection facility achieves 179.0 k dmt 165.1 k dmt nameplate produced shipped production capacity GROWTH OFFTAKE PARTNERING P680 and P1000 Offtakes added Joint study with e

  5. Slide 5: Delivering our strategy

    Delivering our strategy For personal use only Lorem ipsum re pe sincid et ut provit unt eicto odit rem qui ni Operate amust am, voluptas aut que ne cum faccae moluptatem Deliverfuga. our operating performance Quis ab ius, ati commitments auditatquiae ex expedio To be a leader nemquia tendus. Grow in

  6. Slide 6: Production growth to achieve full potential of our world-class asset

    For personal use only Production growth to achieve full potential of our world-class asset 6

  7. Slide 7: Rapid growth in production capacity continuing

    Rapid growth in production capacity continuing For personal use only P1000 name plate capacity2 Future expansion potential subject to successful (kdmt) 660-6901 620 exploration, studies and approvals3 Primary Rejection Facility completed ` Production ` Expanded nameplate capacity 378 Under construct

  8. Slide 8: P680 Project - crushing and ore sorting facility

    P680 Project - crushing and ore sorting facility For personal use only • Project remains on schedule and budget. • Structural, mechanical, piping, electrical and instrumentation works commenced. • Delivery and installation of steel and mechanical equipment continued. • Commissioning remains targeted

  9. Slide 9: Primary Rejection Facility achieves nameplate

    Primary Rejection Facility achieves nameplate For personal use only Video available online 9

  10. Slide 10: P1000 Project – taking shape

    P1000 Project – taking shape For personal use only • Project remains on schedule and budget. • Bulk earthworks and engineering deliverables completed. • Concrete construction and underground services work progressed. • Consignments of steel and modular units being shipped to WA with first shipment n

  11. Slide 11: Expansion programs underway and fully funded

    Expansion programs underway and fully funded For personal use only Remaining capital spend for P680 and P1000 Expansion Projects – 31 March 2024. Capex is fully funded from existing cash. Other ongoing capital expenditure commitments 20% 30% • Mine development P6802 • Sustaining capital P10003 $404m

  12. Slide 12: Highly integrated into the supply chain

    Highly integrated into the supply chain For personal use only Strategic partnerships POSCO JV Additional major chemicals customers Yahua Chengxin Yibin Tianyi General Lithium 12

  13. Slide 13: Extracting greater value across the supply chain

    For personal use only Extracting greater value across the supply chain 13

  14. Slide 14: Strategically positioned to capture value across the supply chain

    Strategically positioned to capture value across the supply chain For personal use only Upstream Mid-Stream Downstream Spodumene concentrate Lithium enriched product Lithium hydroxide ~5.2% >16% >99% purity lithia content1 lithium metal technical grade battery grade 2 3 1. Average grade of spodumene

  15. Slide 15: Downstream chemicals facility with POSCO

    Downstream chemicals facility with POSCO For personal use only 18% equity interest With call option to increase to 30% in a 43,000 tpa lithium hydroxide facility in Gwangyang, South Korea in joint venture with POSCO. Train 1 production commenced Commissioning completed and ramp up of production comm

  16. Slide 16: Joint downstream partnering study

    Joint downstream partnering study For personal use only Binding term sheet Option to form joint Joint feasibility study signed with Ganfeng venture • Leading lithium chemical • ~32 ktpa lithium • Pending study outcomes converter with +20 years conversion plant and FID experience • Location assessmen

  17. Slide 17: Long-term global demand for lithium remains strong

    For personal use only Long-term global demand for lithium remains strong 17

  18. Slide 18: Strong ongoing growth in EV sales…

    For personal use only Thousand units - 400 800 1,200 Jan 1,600 Feb Mar Apr May Jun 2020 Jul Source: RhoMotion April EV Monthly sales Assessment China Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2021 Jul Aug US + Canada Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2022 Jul Aug EU + UK Strong ongoing growt

  19. Slide 19: … projected to continue strongly…

    … projected to continue strongly… For personal use only Global EV sales 60 50 40 Millions 30 21% CAGR CY23 – CY28 57.7 20 35.1 10 13.7 10.4 6.5 3.2 - 2020 2021 2022 2023 2028E 2033E Source: RhoMotion EV Battery Outlook Q1 2024 19

  20. Slide 20: …with demand for lithium also supported by growth in other uses

    …with demand for lithium also supported by growth in other uses For personal use only 4,000 Annual lithium demand 3,500 3,000 2,500 22% CAGR (estimate) CY23 - CY28 kt LCE 2,000 1,500 1,000 500 - 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 EV ESS Portables Industrial Source:

  21. Slide 21: Thank you

    For personal use only Thank you PilbaraMinerals.com.au ASX: PLS 21

  22. Slide 22: Contacts

    Contacts For personal use only Investor Relations James Fuller Manager, Investor Relations T: +61 (0) 488 093 763 James.Fuller@pilbaraminerals.com.au Media Michael Vaughan Fivemark Partners T: +61 (0) 422 602 720 22

  23. Slide 23: Important notices

    Important notices This document has been prepared by Pilbara Minerals Limited (“Pilbara” or “Pilbara Minerals” or the “Company”) and is dated 8 May 2024. For personal use only Not an offer of securities This document is provided for informational purposes and does not constitute or contain an offer,

  24. Slide 24: Important notices

    Important notices Important Information regarding Mineral Resources, Ore Reserves and P680 and P1000 Projects For personal use only Information in this presentation regarding expansions in nameplate capacity of the Pilgan Plant in respect of the P680 and P1000 projects are underpinned by the Company

  25. Slide 25: Pilgangoora Mineral Resources and Ore Reserves

    Pilgangoora Mineral Resources and Ore Reserves For personal use only Category Tonnes Li2O Ta2O5 Fe2O3 Li2O Ta2O5 (Mt) (%) (ppm) (%) (Mt) (M lb) Mineral Resource estimate at 30 June 2023 Measured 22.1 1.34 146 0.44 0.3 7 Indicated 315.2 1.15 106 0.53 3.6 74 Inferred 76.6 1.07 124 0.54 0.8 21 Total 41