  1. Slide 1: Mungari site visit

    Inspired people creating a premier global gold company For personal use only Mungari site visit 6 August 2024

  2. Slide 2: Forward looking statement

    Forward looking statement These materials prepared by Evolution Mining Limited ('Evolution' or 'the Company') include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as 'may', 'will', 'expect', 'intend

  3. Slide 3: Welcome

    Welcome For personal use only Scott Barber General Manager Mungari

  4. Slide 4: Acknowledgement of Country

    Acknowledgement of Country For personal use only Evolution Mining acknowledges the Traditional Custodians of the lands on which we operate and pay our respects to their Elders past and present. We recognise their strengths and ongoing connection to the land, waters and communities as the Custodians

  5. Slide 5: Exceptional team in place

    Exceptional team in place For personal use only Matt O'Neill Scott Barber Shane Barker Shaune Finn Guy Grant Chief Operating Officer General Manager Manager Operations Manager Surface Manager Processing Mungari Mining & Operational Readiness Nancy Guay Dan Brearley Jesse Mann John Kennedy Matt Thomp

  6. Slide 6: Mungari

    Mungari Gold production Operating mine cash flow FY2024 ▪ Consolidated regional ownership FY2024 Mungari For personal use only 8% ▪ Track record of stable and consistent operations Mungari under Evolution ownership 17% ▪ Over 1 million ounces of gold produced ▪ Avg production 130koz pa FY22-24 ▪ ~$9

  7. Slide 7: Sustainability integrated into everything we do

    Sustainability integrated into everything we do For personal use only 7

  8. Slide 8: Mungari 4.2

    Mungari 4.2 For personal use only Dan Brearley General Manager Projects 8

  9. Slide 9: Project status

    Project status ▪ Project approved June 2023 ▪ $250 million infrastructure investment For personal use only ▪ Completion by March 2026 ▪ Project on schedule and within budget ▪ 13 months into 30-month build ▪ Positive contractor performance ▪ Risk mitigation measures ▪ Labour risk diminished ▪ Constr

  10. Slide 10: Process plant overview

    Process plant overview Processing plant: ▪ Single stage crusher, For personal use only SABC, leaching, in-pit Existing tailings deposition SAG mill crushing ▪ Throughput 600tph (4.2Mtpa) following expansion ▪ Total recovery – 93% Leaching Thickener New crushing Stockpile 10

  11. Slide 11: Mining from hubs

    Mining from 3 hubs 5.9Moz endowment1 – 3 mining hubs in first 5 years ▪ Conventional mining method for eastern goldfields For personal use only ▪ Ore volume - ~80% open pit, ~20% underground ▪ Castle Hill ▪ Base load open pit ore feed to mill ▪ Early contractor involvement on track for mining ▪ Kund

  12. Slide 12: Discovery

    Discovery For personal use only Brad Daddow Manager Geology 12

  13. Slide 13: Mungari Reserve growth strategy

    Mungari Reserve growth strategy ▪ Consolidated large-scale (748km2) landholding over key For personal use only prospective corridors ▪ Track record of discovery to support growth ▪ December 2023 Mineral Resource1 increased by 532Koz (+11%) year-on-year to 5.9Moz (net of mining depletion) ▪ Organic r

  14. Slide 14: Genesis – converting and extending mineral resources

    Genesis – converting and extending mineral resources ▪ High-grade drilling results at the Genesis For personal use only Genesis discovery outside of the Mineral Resource – continued growth proximal to planned underground mining fronts ▪ Drilling confirming the geological model, tracing the mineralis

  15. Slide 15: Discovery – testing high-grade targets

    Discovery – testing high-grade targets A A’ For personal use only A A’ Kundana Long Section Long section view map of the Kundana Gold Camp, drilling density by grade and the FY25 discovery targets ▪ Geological modelling shows key mineralised structures continue north along the Zuleika shear corridor

  16. Slide 16: Summary

    Summary For personal use only Tracking to plan and budget Exceptional team in place Key risks under control Unlocking near-term returns in Kalgoorlie 16

  17. Slide 17: Questions

    For personal use only Questions

  18. Slide 18: Appendix: Exploration update

    Appendix For personal use only Exploration update

  19. Slide 19: Mungari Competent Person statement

    Mungari Competent Person statement The information in this report that relates to the Cowal exploration results is based on work compiled by Bradley Daddow who is employed on For personal use only a full-time basis by Evolution Mining Limited and is a member of the Australian Institute of Geoscienti

  20. Slide 20: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length Hole ID Dip Azimuth From (m) DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) For personal use only GERSD24001 DD 331303 6599899 -110 -23 3 422.8 255.9 0.26 0.17 31.90 GERSD24001 DD 331303 6599899 -110

  21. Slide 21: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length From Hole ID Dip Azimuth DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) (m) For personal use only GERSD24016 DD 331303 6599899 -110 -30 353 425.7 360.0 0.50 0.33 20.10 GERSD24016 DD 331303 6599899 -11

  22. Slide 22: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length From Hole ID Dip Azimuth DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) (m) For personal use only XMGC24007 DD 331305 6599897 -110 -21 3 310.5 263.4 0.21 0.14 15.95 XMGC24007 DD 331305 6599897 -110 -2

  23. Slide 23: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length From Hole ID Dip Azimuth DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) (m) For personal use only XMGC24012 DD 331305 6599896 -110 -25 4 395.9 253.0 3.00 1.98 7.95 XMGC24012 DD 331305 6599896 -110 -25

  24. Slide 24: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length From Hole ID Dip Azimuth DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) (m) For personal use only XMGC24019 DD 331305 6599897 -110 -41 11 377.5 324.3 0.41 0.27 45.45 XMGC24020 DD 331305 6599897 -110 -

  25. Slide 25: Drill hole information summary

    Drill hole information summary Hole Easting (m) Northing (m) Elevation Hole Length From Hole ID Dip Azimuth DH Length (m) ETW (m) Au (g/t) Type MGA94 z51 MGA94 z51 (m) (m) (m) For personal use only XMRSD23061 DD 331306 6599895 -110 -18 17 414.1 387.0 1.00 0.66 6.38 XMRSD23061 DD 331306 6599895 -110

  26. Slide 26: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria in Section 1 apply to all succeeding sections) Cowal Section 1 Sampling Techniques and Data Criteria Explanation Commentary For personal use only Sampling • Nature and quality of sampling (e.g. cut channels, random chips, or specific ▪ Sampl

  27. Slide 27: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria in Section 1 apply to all succeeding sections) Cowal Section 1 Sampling Techniques and Data Criteria Explanation Commentary For personal use only Drill sample • Method of recording and assessing core and chip sample recoveries and results ▪

  28. Slide 28: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria in Section 1 apply to all succeeding sections) Cowal Section 1 Sampling Techniques and Data Criteria Explanation Commentary For personal use only Quality of assay • The nature, quality and appropriateness of the assaying and laboratory ▪ A 4

  29. Slide 29: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria in Section 1 apply to all succeeding sections) Cowal Section 1 Sampling Techniques and Data Criteria Explanation Commentary For personal use only Location of data • Accuracy and quality of surveys used to locate drillholes (collar and downho

  30. Slide 30: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria listed in the preceding section also apply to this section) Cowal Section 2 Reporting of Exploration Results Criteria Explanation Commentary For personal use only Mineral • Type, reference name/number, location and ownership including agreem

  31. Slide 31: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria listed in the preceding section also apply to this section) Cowal Section 2 Reporting of Exploration Results Criteria Explanation Commentary For personal use only Drill hole • A summary of all information material to the understanding of the

  32. Slide 32: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria listed in the preceding section also apply to this section) Cowal Section 2 Reporting of Exploration Results Criteria Explanation Commentary For personal use only Diagrams • Appropriate maps and sections (with scales) and tabulations of inte

  33. Slide 33: JORC Code 2012 Assessment and Reporting Criteria

    JORC Code 2012 Assessment and Reporting Criteria (Criteria listed in the preceding section also apply to this section) Cowal Section 2 Reporting of Exploration Results Criteria Explanation Commentary For personal use only Balanced • Where comprehensive reporting of all Exploration Results is not pra

  34. Slide 34: Appendix: Mineral Resources and Ore Reserves

    Appendix For personal use only Mineral Resources and Ore Reserves

  35. Slide 35: Group gold Mineral Resources at December 2023

    Group gold Mineral Resources at 31 December 2023 Gold Measured Indicated Inferred Total Resource Cut-off Tonnes Gold Gold Metal Tonnes Gold Gold Metal Tonnes Gold Gold Metal Tonnes Gold Gold Metal CP9 Project Type (g/t Au) (Mt) Grade (g/t) (koz) (Mt) Grade (g/t) (koz) (Mt) Grade (g/t) (koz) (Mt) Gra

  36. Slide 36: Group gold Ore Reserves at December 2023

    Group gold Ore Reserves at 31 December 2023 Gold Proved Probable Total Reserve Competent Cut-off Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Person10 Project Type Tonnes (Mt) (g/t Au) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) For personal use only Cowal1 Stock

  37. Slide 37: Group copper Mineral Resources at December 2023

    Group copper Mineral Resources at 31 December 2023 Copper Measured Indicated Inferred Total Resource Copper CP6 Tonnes Copper Tonnes Copper Copper Tonnes Copper Copper Tonnes Copper Copper Project Type Cut-off Grade For personal use only (Mt) Metal (kt) (Mt) Grade (%) Metal (kt) (Mt) Grade (%) Metal

  38. Slide 38: Group copper Ore Reserves at December 2023

    Group copper Ore Reserves at 31 December 2023 Copper Proved Probable Total Reserve CP5 Copper Copper Copper Copper Copper Copper Project Type Cut-Off Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) For personal use only Grade (%) Metal (kt) Grade (%) Metal (kt) Grade (%) Metal (kt) Ernest Henry1 Underground 0.5

  39. Slide 39: For personal use only