Xpedra Resources Limited · ASX:XPD
Xpedra Resources — Valor Resources — Investor Presentation (February 2022)
21 slides from Xpedra Resources's investor presentation, February 2022

Slide 1: Critical Commodities for a Carbon Free World in Tier 1 Jurisdictions
A S X : VA L DRILLING IN JANUARY 2022 AT HOOK LAKE Critical Commodities OUTSTANDING COPPER RESULTS DRIVE COMPANY for a Carbon Free World TO PREPARE TO DRILL IN 2022 in Tier 1 Jurisdictions Presented by: GEORGE BAUK Executive Chairman February 2022 1

Slide 2: Disclaimer and Forward Looking Statements
DISCLAIMER AND FORWARD LOOKING STATEMENTS This presentation contains forward looking statements. Forward looking statements are often, but not always, identified by the use of words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan", "estimate", "expect“ and "intend“ and statement

Slide 3: Why Valor?
WHY VALOR? 2 key commodities paramount to achieving Global Net Zero Carbon Emissions Uranium in Athabasca Basin in Canada Copper / Silver in Peru Fully funded for uranium exploration programs in Canada A$5.4M raised at premium for Canadian exploration Canada – Uranium Projects in the wor

Slide 4: Board of Directors
BOARD OF DIRECTORS George Bauk Gary Billingsley Executive Chairman Non-Executive Director Mr Bauk is an experienced company director with over 15 years’ experience as a listed company director in Mr. Billingsley has over 37 years’ experience as a listed company director in Canada in the resources in

Slide 5: Management Team
MANAGEMENT TEAM Robin Wilson Exploration Manager Robin has held senior exploration positions in several exploration and mining companies, including Polaris Metals, Tanganyika Gold, Troy Resources and CRA Exploration. He also spent 5 years working in oil and gas exploration for Woodside Energy. Durin

Slide 6: Why Athabasca Basin?
WHY ATHABASCA BASIN? Average Grade across Multiple precedents for Historically Athabasca has basin of ~2% U3O8 substantial discoveries produced 20% of world’s 10-20X global average and takeovers primary uranium supply, 60 years mining history Saskatchewan consistently Basement hosted Prior explorati

Slide 7: Why Uranium?
WHY URANIUM? Currently 440 nuclear reactors in operation; 50+ under construction; 100+ planned; 300+ proposed US, Russian, Chinese governments all independently developing small modular reactor (SMR) technology-not included in demand forecast Strategic Uranium Reserve Budget is $1.5 Billion ov

Slide 8: How Clean Is the Energy Going Into Your EV?
HOW CLEAN IS THE ENERGY GOING INTO YOUR EV? Only 1/3 of electric vehicles use a carbon-free charging source Charging an EV at night may produce more carbon emissions than a gasoline engine Nuclear energy is the only proven technology that can deliver base load electricity on a large scale 24 h

Slide 9: Hook Lake Project
HOOK LAKE PROJECT Option to earn 80%, 2% NSR decision Hook Lake Project Overview 16 contiguous claims covering 25,846 ha Located 60km east of Key Lake Uranium Mine: Total historical production of McArthur River/Key Lake is >500Mlb U3O8 Mineralisation is shallow and structurally controlled

Slide 10: Hook Lake Project: Surface high-grade uranium at S-Zone
HOOK LAKE PROJECT Surface high-grade uranium mineralisation at S-Zone prospect Sampling results from the S-Zone prospect returns: 59.2% U3O8, 499g/t Ag, 5.05% TREO, 14.4% Pb (Float) TREO includes 11,797ppm Nd2O3 + Pr6O11 and 1,825ppm Dy2O3 57.4% U3O8, 507g/t Ag, 3.68% TREO, 14.5% Pb (Rock Ch

Slide 11: Hook Lake Project: Drilling commenced in January 2022
HOOK LAKE PROJECT Drilling commenced in January 2022 A 2,500m diamond drilling program commenced at Hook Lake in January 2022 Drilling to test the extent of mineralisation at the S-Zone Program will include testing of V-Grid, a geochemical and structural target. Further work planned for Hook

Slide 12: Cluff Lake Project (100%)
CLUFF LAKE PROJECT (100%) 19 contiguous claims covering 62,233ha Located within the Carswell geological complex, 7km east of the Cluff Lake Mine which produced 62Mlb U3O8 at an average grade of 0.92% U3O8 Multiple uranium targets identified following compilation of public geophysical and geologica

Slide 13: Major Landholdings in the Athabasca Basin
MAJOR LANDHOLDINGS IN THE ATHABASCA BASIN Five new projects acquired (105km 2 ), four of which were acquired through direct staking Historical data compilation and interpretation underway On-ground fieldwork planned for 2022 Hidden Bay (31.9km 2 ) Prospective for unconformity and basement-hosted u

Slide 14: Why Peru?
WHY PERU? Peru is a politically stable and mining friendly jurisdiction where 10% of GDP is attributed to the mining industry. The mining industry was a key driving force behind Peru´s 21 years of economic growth and is expected to play an even more important role in the country´s post COVID 19 econ

Slide 15: Picha Project: Widespread high-grade copper and silver
PICHA PROJECT Widespread high-grade copper and silver occurrences Multiple significant channel and rock chip sample assay results from 2021 exploration program: 35.6m @ 1.3% Cu and 22.85g/t Ag - channel sample (Cobremani) 17.6m @ 1.95% Cu and 29.5g/t Ag – channel sample (Maricate) 40.5m @ 0.

Slide 16: Picha Project: Copper-silver targets and exploration
PICHA PROJECT Epithermal copper-silver stratabound, replacement type and porphyry targets Exploration Recent exploration (2021) at Picha has included the following activities: Detailed geological mapping program - 2000 hectares Geochemistry sampling program 259 channel and 145 rock chip sample

Slide 17: Picha Project: Ground geophysics reveal IP anomaly
PICHA PROJECT Ground geophysics reveal significant IP anomaly Preliminary geophysical data indicates a significant Induced Polarisation (IP) anomaly at least 1.2km by 2km in extent IP anomaly at depth of 4-500m represents an extensive drill target. Widespread surface copper mineralisation coin

Slide 18: Picha Project: Expanded Land Holding
PICHA PROJECT Expanded Land Holding Total land holding (granted and applied) increased to ~200km2 New targets identified for follow-up work includes: Chullunquiani – includes historical workings, Occsani and Ichocollo Previously identified Huancune target to southwest – visual sulphides In

Slide 19: 2022 Work Plan
2022 WORK PLAN Peru – Copper/Silver Canada - Uranium Finalise the IP/Resistivity interpretation at Picha Project Drilling commenced at Hook Lake in January 2022 Complete planning of drill program at Picha Project Airborne Surveys at Hook Lake and Cluff Lake – April/May 2022 Complete enviro

Slide 20: In Summary
IN SUMMARY Canadian Uranium is fully funded following A$5.4M capital raising Valor provides exposure to 2 critical commodities in the drive to Global Net Zero Carbon Emissions Athabasca Basin hosts the highest grade uranium mines in the world Peru is the second largest copper and silver producer

Slide 21: Company Overview and Contact
COMPANY OVERVIEW ASX:VAL C A S H AT B A N K P ERFORMANCE R IGHTS as at 31 December 2021 $5.6 568.33 $46.8 m i l l i o n m i l l i o n 3.34 b i l l i o n m i l l i o n 96 m i l l i o n M A R K E T C A P I TA L I S AT I O N S HARES ON I SSUE U NLISTED O PTIONS at ($0.014 per share) At various prices C
Source: Internet Archive copy of valorresources.com.au
More decks from Xpedra Resources Limited
Resources Rising Stars Gold Coast Investor Conference 202618 slides · Sep 8, 2026
Investor Presentation (July 2026)16 slides · Jul 23, 2026
RIU Sydney 202623 slides · May 6, 2026
Blue Ocean Equities – Eastern Seaboard Precious & Base Metals Conference 202617 slides · Feb 3, 2026
Investor Presentation (May 2025)23 slides · May 22, 2025
RRS Gather Round 202437 slides · Apr 4, 2024