Cavalier Resources Limited · ASX:CVR

Cavalier Resources — Australian Gold Conference, Sydney 2025

12 slides from Cavalier Resources's conference presentation, October 2025

  1. Slide 1: Update on the Stage One Crawford Gold Starter Pit

    Update on the Stage One Crawford Gold Starter Pit Australian Gold Conference, Sydney October 2025

  2. Slide 2: Disclaimer

    Disclaimer The purpose of this presentation is to provide general information about Cavalier Resources Limited Certain statements in the presentation are or may be perceived as “forward-looking statements” (ACN 635 842 143) (the ‘Company’). Unless otherwise stated herein, the information in this and

  3. Slide 3: Capital Structure & Board

    Capital Structure & Board ASX:CVR Share Price and Volume 67.1m 13.2m Shares on Options and Issue Performance Rights DANIEL TUFFIN RANKO MATIC ANTHONY KEERS $0.355* $23.8m Executive Technical Director & CEO Executive Chairperson Chartered Accountant Non-Executive Director Share Price Market Cap Minin

  4. Slide 4: Cavalier Corporate Gold Strategy

    Cavalier Corporate Gold Strategy Maximizing excess cash flows and shareholder returns targeting free cash flow multiples of current market capitalization. Stage One Starter Pit Future Mining Stages Long-Term Conservative, low-risk mine plan focused on Develop future open pit mining stages at Continu

  5. Slide 5: Stage One Starter Pit Summary

    Stage One Starter Pit Summary Tier one mining jurisdiction – 20km East of Leonora, Western Australia 99.8% JORC Indicated material in the Stage 1 starter pit - High confidence, low-risk mining operation with the mine plan constrained to shallow, free dig, oxide-only Reserve ounces Highly competitive

  6. Slide 6: Stage One Simplified Plans

    Stage One Simplified Plans Crawford Stage One, Simplified Site Plan 6

  7. Slide 7: Starter Pit - Bringing Forward Cash Flow

    Starter Pit - Bringing Forward Cash Flow Initial Focus on Cheap Starter Mining & Low-Cost Heap Leach Processing ➢ Very low strip ratio – 2.8:1. ➢ Oxide ore limits drill & blast and crushing requirements keeping mining costs low. ➢ Excellent heap leach amenability with higher recoveries and lower con

  8. Slide 8: Substantial Future Upside

    Substantial Future Upside Potential Scale Remains Largely Untested ➢ Crawford work has largely focused on near surface oxidised infill drilling around the starter pit. ➢ There is significant potential for additional mineralisation with the Resource open along strike and at depth; near mine developme

  9. Slide 9: Underground Mining Potential

    Underground Mining Potential With a Focus on Surface Oxide Gold and Minimal Holes Having Been Drilled into the Underlying Structure, the Crawford Project Remains Poorly Explored at Depth * Refer ASX Announcement ‘Crawford Returns High Grades and New Mineralisation at Depth’, 3 October 2022. 9

  10. Slide 10: Appendix: Crawford Ore Reserve and Mineral Resource

    Appendix Crawford Ore Reserve The Ore Reserve relates specifically to the conversion of Indicated Resources to Probable Ore Reserves only contained within the Crawford Stage 1 pit design and includes consideration of the modifying factors. Some errors may occur due to rounding. Mineral Resources are

  11. Slide 11: Appendix: Competent Persons Statement

    Appendix The Company confirms that it is not aware of any new information or data that materially Competent Persons Statement affects the information included in the original market announcement and, in the case of The information relating to geology and exploration results is based on information c

  12. Slide 12: Thank You

    Thank You For more information contact cavalierresources.com.au Daniel Tuffin Executive Technical Director, Interim CEO daniel@cavalierresources.com.au

Cavalier Resources — Australian Gold Conference, Sydney 2025 on 6ix