Rowan Companies plc

Rowan Companies — Lehman Brothers Energy / Power Conference 2006

26 slides from Rowan Companies's conference presentation, Sep 6, 2006

  1. Slide 1: Lehman Brothers Energy / Power Conference

    Slide 1: Lehman Brothers Energy / Power Conference

    Lehman Brothers Energy / Power Conference Rowan Companies, Inc. D.F. McNease Chairman & CEO September 2006

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and ar

  3. Slide 3: Rowan Companies, Inc. Revenues

    Slide 3: Rowan Companies, Inc. Revenues

    Drilling 73% Manufacturing 27% Drilling 70% Manufacturing 30% 2005 2006 Estimate Rowan Companies, Inc. Revenues

  4. Slide 4

    Slide 4

  5. Slide 5: LeTourneau, Inc. Revenues and Backlog

    Slide 5: LeTourneau, Inc. Revenues and Backlog

    YTD YTD 6/30/06 6/30/05 ( $ in millions) External revenues $185.5 $124.0 Margin* (% of revenues) $39.0 (21%) $15.6 (13%) Operating income** (% of revenues) 24.3 (13%) 0.9 (1%) External backlog $566.5 $251.9 Internal volume to Rowan 117.7 45.6 * Equals external revenues less direct cost of sales ** E

  6. Slide 6: Manufacturing Facilities

    Slide 6: Manufacturing Facilities

    LeTourneau, Inc. - Longview OEM - Houston LeTourneau, Inc. - Vicksburg LEWCO - Houston Manufacturing Facilities

  7. Slide 7: AC DirectDrive Top Drive 3,000 HP Mud Pump Rotary Table Traveling Block

    Slide 7: AC DirectDrive Top Drive 3,000 HP Mud Pump Rotary Table Traveling Block

    AC DirectDrive Top Drive 3,000 HP Mud Pump Rotary Table Traveling Block

  8. Slide 8: AC Traction Motors, Motor Drives and Controls

    Slide 8: AC Traction Motors, Motor Drives and Controls

    AC Traction Motors Motor Drives and Controls

  9. Slide 9: Rowan's Offshore Fleet – 20 Total Jack-ups

    Slide 9: Rowan's Offshore Fleet – 20 Total Jack-ups

    Super Gorilla Class 4 Rigs 20% The Hank Boswell, Rowan’s 3 rd TARZAN Class jack-up, will be christened into service on September 23, 2006. Three additional rigs are under construction / on order Rowan’s Offshore Fleet – 20 Total Jack-ups Gorilla Class Rigs 15% 300-350’ 116-C 7 Rigs 35% 350’ Slot Rig

  10. Slide 10: Rowan's Safety Statistics: Offshore and Land Drilling

    Slide 10: Rowan's Safety Statistics: Offshore and Land Drilling

    TRIR Rate LTI Rate Rowan accident rate based on 200,000 man-hours Rowan’s Safety Statistics: Offshore and Land Drilling

  11. Slide 11: Rowan's Worldwide Offshore Fleet

    Slide 11: Rowan's Worldwide Offshore Fleet

    North Sea 2 Rigs 10% Current average day rate worldwide: $150,000 Current average day rate U.S. Gulf of Mexico: $155,000 North Sea Trinidad 3 Rigs 14% 1 Rig 5% August 2006 1 st Quarter 2007 Rowan’s Worldwide Offshore Fleet Eastern Canada Rig 5% Middle East Rigs 20% U.S. Gulf Mexico Rigs 43% of Rigs

  12. Slide 12: Rowan's Worldwide Offshore Fleet (Net Book Value per area)

    Slide 12: Rowan's Worldwide Offshore Fleet (Net Book Value per area)

    Middle East 5% North Sea 31% North Sea 42% Trinidad August 2006 1 st Quarter 2007 Eastern Canada 15% U.S. Gulf of Mexico 32% Middle East 24% U.S. Gulf of Mexico 49% 2% Rowan’s Worldwide Offshore Fleet (Net Book Value per area)

  13. Slide 13: Rowan's Offshore Drilling NBV by Class

    Slide 13: Rowan's Offshore Drilling NBV by Class

    300’-350’ Cantilever 7% 250’, 30 Slot 4% 21 Total Jack-up Rigs (includes Hank Boswell ) Rowan’s Offshore Drilling NBV by Class Gorilla / Super Gorilla 63% TARZAN Class 26% 0’-350’

  14. Slide 14: ROI Analysis: Saudi Aramco Contract

    Slide 14: ROI Analysis: Saudi Aramco Contract

    4 year income – after taxes (35%) $203 million 4 year cash flow – after taxes $241 million Rowan Companies, Inc. - ROI Analysis Estimated ROI – after taxes 20% Saudi Aramco Contract: 2 TARZAN Rigs - 4 year period

  15. Slide 15: Rowan's CAPEX vs. Cash Flow

    Slide 15: Rowan's CAPEX vs. Cash Flow

    Capital Expenditures: Drilling ($445) Manufacturing ($46) *Cash Flow is Rowan's actual increase in cash, excluding additions to PP&E Rowan’s CAPEX vs. Cash Flow For the 18 months ended 6/30/2006 (In millions) Cash Flow $480 Total CAPEX ($491) CAPEX exceeds Cash Flow by ($11)

  16. Slide 16: Rowan's Land Fleet

    Slide 16: Rowan's Land Fleet

    Rig 54 20 Land rigs currently operating in Texas, Louisiana & Oklahoma 17 out of the 20 rigs are on term contracts Current average day rate: $23,400 Newbuilds are under construction of the 9 rigs are contracted for terms of 2-3 years with day rates ranging from $21,000 - $27,500 Rowan’s Land Fleet

  17. Slide 17: Current Worldwide Jack-up Supply / Demand

    Slide 17: Current Worldwide Jack-up Supply / Demand

    E. Canada: 100% C & S America: 82% US GOM: 80% Mexico: 100% West Africa: 100% North Sea: 100% Middle East: 98% SE Asia: 97% Contracted Not Contracted 80 2 0 26 3 32 25 0 79 2 33 1 20 14 0 Worldwide Utilization: 92% Includes data supplied by ODS-Petrodata, Inc; Copyright 2006 0 Indian Ocean: 100% 28

  18. Slide 18: Worldwide Jack-up Supply Deficits

    Slide 18: Worldwide Jack-up Supply Deficits

    Southeast Asia 4 - 5 rigs India 2 - 3 rigs West Africa 2 - 3 rigs Mexico 3 rigs U.S. GOM We believe the U.S. GOM jack-up deficit will return after hurricane season Middle East 4 - 5 rigs North Sea 2 - 3 rigs Trinidad 1 rig Worldwide: Jack-up Supply Deficits Total Rig Deficit 18 - 23 Jack-ups

  19. Slide 19: Worldwide Jack-up Tenders

    Slide 19: Worldwide Jack-up Tenders

    Middle East Maersk 1 rig Currently Tendering 3 rigs September Saudi Aramco 1 - 2 116C Currently Tendering 2 Deep Gas rigs Awarded (Rowan) 4 rigs November 2006 RasGas 1 rig Currently Tendering 2 rigs October 2006 National Drilling 2 rigs Currently Tendering 3 rigs 2008 Oxy 1-2 rigs Currently Tenderin

  20. Slide 20: Worldwide Jack-up Newbuilds and Attrition 1950-2009

    Slide 20: Worldwide Jack-up Newbuilds and Attrition 1950-2009

    Additions to the Fleet Attrition Average Age of Retired Rigs: 20 yrs. 87% of the fleet is 20 years & older Average Number of Retired Rigs per year: 6 Rigs Scheduled Construction / On Order Includes data supplied by ODS-Petrodata, Inc; Copyright 2006 Worldwide Jack-up Newbuilds and Attrition 1950-200

  21. Slide 21: U.S. Gulf of Mexico Jack-up Market

    Slide 21: U.S. Gulf of Mexico Jack-up Market

    350’ IC 14 Rigs 10% 300’ IC 24 Rigs 17% 250’ IC 22 Rigs 15% <250’ IC 7 Rigs 5% 200’-250’ MS 19 Rigs 13% 200’-250’ MC 23 Rigs 16% <200’ MC 14 Rigs 10% IS 8 Rigs 6% >350’ IC 12 Rigs 8% 2001 2006 143 Jack-ups 100 Jack-ups 350’ IC 10 Rigs 10% 300’ IC 11 Rigs 11% 250’ IC 13 Rigs 13% <250’ IC 5 Rigs 5% 20

  22. Slide 22: Gulf of Mexico Jack-ups Rig Count Timeline

    Slide 22: Gulf of Mexico Jack-ups Rig Count Timeline

    September 2006 100 1Q 2007 85 (assuming no other rigs migrate) 1 st Quarter 2007 Active Jack-up Fleet – 77 Rigs Pre-Storm Jack-up Demand (Summer 2005) – 92 Rigs Includes data supplied by ODS-Petrodata, Inc; Copyright 2006 Contracted Migration - Cold Stacked Rigs - 8 Gulf of Mexico Jack-ups Rig Count

  23. Slide 23: Gulf of Mexico Jack-ups Migration Factors

    Slide 23: Gulf of Mexico Jack-ups Migration Factors

    We believe migration will continue due to: • Global rig demand • International supply deficits • Longer-term contracts abroad • Higher day rates internationally Unless U.S. E&P companies begin to offer the same incentives domestically, the U.S. Gulf of Mexico could see an additional departure of 11-

  24. Slide 24: Gulf of Mexico Jack-ups Projected Rig Make-up December 2007

    Slide 24: Gulf of Mexico Jack-ups Projected Rig Make-up December 2007

    • Mexico – 2-3 rigs (250’IC/300’IC) • West Africa – 2 rigs (350’IC) • North Sea – 2 rigs (350’+IC) • Middle East – 3-5 rigs (300’IC/350’IC) • India – Considering a pre-storm demand of 92 rigs, there could be a 26 rig deficit in the US GOM • • December 2007 U.S Gulf of Mexico Projected Rig Make-up 74

  25. Slide 25: Gulf of Mexico Jack-up Market

    Slide 25: Gulf of Mexico Jack-up Market

    Includes data supplied by ODS-Petrodata, Inc; Copyright 2006 The projected post-migration supply could descend below historical trough cycle demand Gulf of Mexico Jack-up Market Historical Demand Current Active Supply Projected Post-Migration Supply Pre-Storm Demand Rig Deficit Current Active Supply

  26. Slide 26: Rowan Companies, Inc.

    Slide 26: Rowan Companies, Inc.

    Rowan Companies, Inc.

Source: SEC EDGAR · 8-K filed Sep 6, 2006

More decks from Rowan Companies plc