Castile Resources Ltd · ASX:CST
Castile Resources — Investor Presentation (March 2022)
23 slides from Castile Resources's investor presentation, Mar 16, 2022
Slide 1: ASX Announcement: March 2022 Investor Presentation
ASX Announcement 16 March 2022 March 2022 Investor Presentation Castile Resources Limited (ASX: CST) (CST or the Company) is pleased to provide the Company’s March 2022 investor presentation which is attached to this announcement. The Company also advises that the informational video in respect to t
Slide 2: Buried Treasure in the Territory
Buried Treasure in the Territory Investor Presentation March 2022
Slide 3: Compliance & General Disclaimer
Compliance & General Disclaimer COMPETENT PERSONS STATEMENTS The information in this report that relates to Exploration Results and Mineral Resources and Exploration Data is based on, and fairly and accurately represents, information and supporting documentation compiled by Mr. Jake Russell B.Sc. (H
Slide 4: Investment Summary
Investment Summary Flagship Rover 1 Project with potential multiple revenue streams in Gold, Copper, Cobalt and an Industrial Mineral Potential for a multi-deposit mining precinct situated in the highly prolific Tennant Creek region Products can supply battery producers and end users in Australia wi
Slide 5: Corporate Snapshot
Corporate Snapshot SHAREHOLDERS RESEARCH COVERAGE CAPITAL STRUCTURE Australia 7.0% UK 12.0% 199.7 A$6.67 33.9% North America MILLION MILLION Western 0.2% Zone Europe (ex UK) SHARES ON ISSUE CASH (AT 31-DEC-21) 15.0% Asia 10.9% Board and CAPITAL STRUCTURE Management 1YR SHARE PRICE CHART A$36.0 0.35
Slide 6: The Rover Mineral Field – A Multi-Deposit Strategy
The Rover Mineral Field – A Multi-Deposit Strategy 5 ASX:CST 8 MARCH 2022 “Large Increases in Gold, Copper and Cobalt At Rover 1”
Slide 7: Significant High-Grade System
Significant High-Grade System Gold Intercepts Copper Intercepts 21m @ 6.86% Cu 10m @ 47.97g/t Au from 469m in WGR1D011 from 471m in R1ARD41-1 27m @ 4.75% Cu 7m @ 125.93 g/t Au from 429m in WGR1D024-1 from 542m in WGR1D034 42m @ 4.10%Cu 12m @ 58.40 g/t Au from 360m in R1ARD30 from 555m in WGR1D002-5
Slide 8: Large Increases in Key Metals for the Pre-Feasibility Study
Large Increases in Key Metals for the Pre-Feasibility Study Engineers designing a 500,000tp/a Processing Plant for the PFS Classification Rover 1 Mineral Resource Estimate Gold (Oz) Copper (T) Cobalt (T) Magnetite* Indicated 242,600 63,400 2,900 TBA Inferred 20,900 14,000 900 TBA Total 263,500 77,40
Slide 9: Rover 1 – Large Increases in Indicated Resources of Key Metals
Rover 1 – Large Increases in Indicated Resources of Key Metals Gold, Copper and Cobalt1 40% 65% 61% 95%+ INCREASE INCREASE INCREASE GRADE PRODUCT Maxfine Grade Magnetite Density Modifying 242,000 63,400 2,900 Industrial Mineral OUNCES TONNES TONNES TONNES TBA 8 1The Company refers to the exploration
Slide 10: Fully Engineered Mining Plan Complete For the Pre-Feasibility Study
Fully Engineered Mining Plan Complete For the Pre-Feasibility Study 9
Slide 11: By-Products To Significantly Enhance The Economics Of The Project
By-Products To Significantly Enhance The Economics Of The Project Proposed Rover 1 Processing Flowsheet Grinding Magnetic Gravity Bulk Sulphide HIGH TOTAL Separator Float RECOVERIES OF GOLD, COPPER AND COBALT METALS Crushed ore Fine Grind 500,000t PROCESSING PLANT Fine Grind Oxidation CAPABILITY PRO
Slide 12: High Grade Industrial Mineral By-Product at Rover 1
High Grade Industrial Mineral By-Product at Rover 1 11 ASX:CST 19 November 2021 “Additional Environmentally Sustainable Product At Rover 1”
Slide 13: Rover 4 – Expanding the Footprint of the Rover 1 Strategy
Rover 4 – Expanding the Footprint of the Rover 1 Strategy Potential To Add A Resource at Rover 4 to the Rover 1 Development Schematic of Rover 1 Engineering Design with Rover 4 Location Facing West Plan View of Rover 1 Proposed Engineering Design with Rover 4 Location 12 ASX:CST 2 February 2022 “Cop
Slide 14: Rover 4 – Further Drilling and Analysis to Estimate A Resource
Rover 4 – Further Drilling and Analysis to Estimate A Resource 13 ASX:CST 2 February 2022 “Copper At Rover 4 Adds to Plans at Rover 1”
Slide 15: Potential for a Multi-Deposit Project
Potential for a Multi-Deposit Project
Slide 16: Potential for a Multi-Deposit Mining Jurisdiction
Potential for a Multi-Deposit Mining Jurisdiction 15
Slide 17: Explorer 108 – The Treasure Hunt for the Primary Copper Source
Explorer 108 – The Treasure Hunt for the Primary Copper Source Extensional Drill Hole NR108D049-1 drilled by Castile in 2021 returned sections of high grade zinc and lead with trace copper from a massive 145m mineralised interval Highlights from Hole NR108D049-1 include the following intercepts: 145
Slide 18: Explorer 142 – The Rover 4 Lookalike
Explorer 142 – The Rover 4 Lookalike 17 The Explorer 142 Resource is comprised of the following Inferred Resource of 176kt @ 5.21% Cu and 0.21g/t Au.
Slide 19: Warumpi Project – Potential for Significant Base Metals Mineralisation
Warumpi Project – Potential for Significant Base Metals Mineralisation Highly prospective grass-roots exploration project located approximately 300 km west of Alice Springs in the West Arunta region of the Northern Territory. The age of the Warumpi Province (1690–1610 Ma) is a particularly significa
Slide 20: Experience Board & Management
Experience Board & Management Peter Cook Mark Hepburn John Braham Jake Russell Michael Poepjes Mark Savage Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Mining Engineer Geology Manager Mr Cook is a geologist BSc Mr Hepburn has a degree in Mr Braham is an expe
Slide 21: Strong NT Government Support and Community Engagement
Strong NT Government Support and Community Engagement Castile is committed to maintaining strong Territory and local government support Supporting local indigenous population via employment and community enrichment programs Castile has donated Sporting Equipment to all schools within the entire Bark
Slide 22: Investment Summary
Investment Summary NEAR TERM CATALYSTS MARCH Starting with Rover 1 there is potential for a multi- 2022 deposit mining jurisdiction situated in the highly 2022 DRILLING prolific Tennant Creek region PROGRAM UPDATE EXTENSIONAL Diversity of revenue streams and metal products to DRILLING PROGRAM create
Slide 23: Castile Resources contact details
Level 7, 189 St Georges Tce Mark Hepburn Perth WA Managing Director info@castile.com.au
Castile Resources — Investor Presentation (March 2022) on 6ix