Slide 1: Korella North leading Chatham forward
Korella North leading Chatham forward Presentation 22nd August 2023,AusIMM NZ Conference Chris Castle, CEO and Managing Director Colin Randall, Executive Director Chatham Rock Phosphate Limited
Slide 2: Corporate
Corporate • Listed as CRP on NZX New Zealand, NZP on TSX-V Toronto, Canada and also on Frankfurt Bourse • Over 3000 shareholders • Market Capitalisation CAN$11.7 million(at 16/8/23) • CEO and Managing Director, Chris Castle – New Zealand • President Directeur General- SAS Avenir Makatea – Etienne Fa
Slide 3: Company Outline
Company Outline • Low cadmium phosphate • Chatham Rise undersea project – New Zealand • Makatea mining/rehabilitation/eco-tourism project – French Polynesia • Korella phosphate projects – Queensland • Pacific Rare Earths Limited – New Zealand/ Queensland
Slide 4: LOS ANGELES'
LOS ANGELES' HONOLULU ° 2 © ty E - MAKATEA SANTIAGO ; i we wa
Slide 5: New Zealand – Chatham Rise phosphorites
New Zealand – Chatham Rise phosphorites
Slide 6: Typical dredging vessel
Typical dredging vessel 235m Conventional Trailing Suction Hopper Dredger – one of 91 such vessels in the world fleet (IADC Fleet List – January 2019)
Slide 7: Makatea
Se NM akatea
Slide 8: Route actuelle
Route actuelle Limite du PER
Slide 9: Slide 9
Slide 10: Makatea excavation and hole filling
HITACHI Filling of the holes in order to enlarge the bench and to proceed with the aspiration of the phosphate in the others hole bottoms # 25. 25 14 12 10 8 Filling of holes previously emptied of their phosphate and loading of trucks if necessary. The advantage of installing a excavator at height m
Slide 11: Korella Phosphate
Korella Phosphate Cloncurry NW Queensland
Slide 12: Korella Phosphate Projects
Korella Phosphate Projects Korella Fertilizers • Cloncurry Distribution Hub – Round Oak Road • Korella North –EPM 28589 – Domestic/Export from Q3 2024 • Korella Central – ML90209 – Court proceedings to enforce contract • Korella South – EPM 28187 – Export from 2026 Korella Terminals • Korella North
Slide 13: Slide 13
Slide 14: Georgina Basin
Georgina Basin shown in2 area
Slide 15: Duchess Embayment
Duchess Embayment 2 bz bet Georgina Basin u Mount Isa
Slide 16: Western shoreline
Br ee Western = (me . D2 ee shoreline Thomtonia Limestone
Slide 17: Geology
GEOLOGY BORE Government Geology FIGURE 3
Slide 18: Queensland Government geology map
Source: Qld Government - https://georesgiobe.information.qid gov.au/
Slide 19: Monastery Creek Phosphate Member
Monastery Creek Phosphate Member Stratigraphic Column
Slide 20: Full 22m section
Full 22m section
Slide 21: Korella North EPM 28589
Korella North Previous exploration 2009-2011 EPM 28589 including drilling and trenching
Slide 22: Corella Bore drilling and trenching
oer aoe ‘Smee: @ 22999205 smears @ 2233 205 een som com ass72 som soe Coretta Bore (KRB) metres @ 12.66% POS basal no amin 9 sg — Tree ATO = tr 0 ON POE Tame manor KRUCIBLE METALS LTD ron ome EPI 15572 CORELLA BORE REFERENCE TRENCH UNS [ANOMALOUS P205 ZONES, IN TRENCHES Se iain, mgt Source: AM data
Slide 23: Pilgrim Fault
Pilgrim Fault ePM15072 Krucible Metals/ Deep Yellow IV Corella Bore \ EPM 15572 \ (KRB) Corella Bore EPM15572 - D10 Mapped Geolgoy with Drill Holes —— : = Gunes oa KRUCIBLE METALS LTD teem EPM 15572 D10 Prospect Phosphate Results Sele: 110000 | Priction: AM Zone 4 (AD 85) Water Courses Soll sample s
Slide 24: Korella North JORC resource area
Se) ee eee ee Se FPTrert panes EPM 28589 : Korella North Propectan MGA 2699 Zane 54 (GOA 2230) O mm mreer -——n reer hex some 1 Whom Southern Cross Foxiizer Procggsing Pent a * £10 bony \ \ ORILL COLLARS , (EPO ms OU TCHOF 3 AREA OF JORC INDICATED AND INFERRED RESOURCE
Slide 25: Source: AM data room, 2023
Source: AM data room, 2023.
Slide 26: a vm i] Bo uw s # c s Zz E B N a
a vm 2 i] Bo uw s # c s 3 2 Zz E B N a Rg Cc 3 : E a ov 5 o ua
Slide 27: Production Plan
PRODUCTION PLAN 100,000 tpa in initial years building to 250,000 tpa Initial production of Direct Application Soft Rock Phosphate 9 % P Crushed and screened SIzed 5mm x 2mm, 2mm x 0mm Match dry land cotton planting in March/April 2024. Export potential
Slide 28: Domestic – Delivery by road train
Domestic – Delivery by road train
Slide 29: Domestic - delivery by road train
Domestic - delivery by road train
Slide 30: Port of Townsville
Port of Townsville
Slide 31: Export – Transport to Port in half height containers
Export – Transport to Port in half height containers
Slide 32: Export Rotainer for half height containers
Export Rotainer for half height containers
Slide 33: Port of Darwin
Port of Darwin
Slide 34: Port of Karumba
Port of Karumba
Slide 35: Korella North – Train loading facility
Korella North –Train loading facility • 1000 tonne above rail bin • Loading 5000 tonne train • Loading time 2 hrs
Slide 36: Port of Townsville Expansion underway
Port of Townsville Expansion underway Bulk phosphate ship loading facility • Potential for use of existing facilities in 2024 • Potential first bulk seaborne phosphate through new facility in 2026-2027
Slide 37: Port of Townsville Bulk phosphate ship loading facility
Port of Townsville Bulk phosphate ship loading facility