Uru Metals Limited · LSE:URU
Uru Metals — Investor Presentation (April 2025)
19 slides from Uru Metals's investor presentation, April 2025
Slide 1: URU Metals Ltd – ZEB Nickel Project
URU METALS LTD ZEB Nickel Project “Resources for the Clean Energy Revolution” APRIL 2025
Slide 2: Disclaimer
Disclaimer The document attached hereto and the presentation of which it forms part (together the “Materials”) have been prepared by URU Metals Limited (the “Company”). The Materials are confidential and personal to you and are furnished to you as background information to provide a basis for you, a
Slide 3: Disclaimer
Disclaimer The investment or investment activity to which the Materials relate are available only to such persons and will be engaged with only with such persons. If you are not such a person: (i) you should not take part in the presentation and nor should you have received the Materials; (ii) pleas
Slide 4: Project Summary
Project Summary Prime Location in World Advanced Nickel Sulphide deposit Green Class I Nickel Asset Class Mining District with four stacked de-risked zones Located on the Northern Limb of the 12 870 m diamond drilling Project offers the opportunity for low- Bushveld Complex, South Africa (38 holes)
Slide 5: Nickel Grade Increases
Similar mineralisation to Mogalakwena and Ivanplats, our Neighbours Nickel Grade Increases Africa Bushveld Complex Pretoria Johannesburg Bloemfontein Zeb Nickel Project Mokopane South Africa Cape Town South Africa 5
Slide 6: Excellent Infrastructure
Excellent Infrastructure To Botswana 180km • Accessible from national highway, approximately 3 hours Anglo Platinum’s Mogalakwena drive from Johannesburg Mining Complex • Access to water identified E ZEB • Local labour force in close proximity from Mokopane NICKEL Ivanhoe Mine Shaft 930 m depth PROJ
Slide 7: Four Stacked Mineralised Zones
Four Stacked Mineralised Zones Zone 2 Ni-Cu-PGE Mineralisation Geophysics signature Ivanhoe Mines is currently sinking two of ultramafic/mafic bodies 800m deep shafts to exploit the Platreef Zone 1 Zeb Nickel Project Disseminated Ni sulphide resource Ivanhoe Mines - Platreef Project License Boundary
Slide 8: Magnetic & Gravity Survey confirms Geological Model
Magnetic & Gravity Survey confirms Geological Model The nickel sulphide mineralisation model for the project is confirmed by recent drilling, geophysics, mineralisation style and assays. A high quality airborne magnetic and gravity survey was recently completed over the project area, which served to
Slide 9: Four Exploration Zones exist on the Project Area
Four Exploration Zones exist on the Project Area • Zone 1: Existing open pit sulphide nickel resource hosted in the Lower Zone. Only the south-western Lower Zone (Uitloop II) body has been explored and the Lower Zone (Uitloop I) body and the chonolith bodies connecting the two Lower Zone bodies st
Slide 10: Zeb – Historical Resource
Zeb 1 – Historical Resource The historical resource contains 1.6 billion tons at an average grade of 0.25 % Ni1 with a clear path to increase this grade plus add PGE credits. Historical drilling stopped short of higher-grade mineralisation near the base of the geological body hosting the nickel mine
Slide 11: Summary of Last Drill Program
Summary of Last Drill Program • The l a s t completed drill program of 8 holes of 3,220 m resulted in multiple intersections of higher-grade Ni-PGE mineralisation1. • The drill program was successful in proving up over 5 km of strike extent of this Ni-PGE mineralisation. • Various holes from the dri
Slide 12: Summary of Last Drill Program
Summary of Last Drill Program Zone 1 Drill Results: • Drill results yielded a weighted average grade of 0.23% over an average width of 213 metres1 and in line with the historical resource Zone 2 Drill Results: • Grades intersected from 8 drill holes between depths of 30 meters and 433 meters yielded
Slide 13: Zone 1 - Drill Results
Zone 1 - Drill Results Summary of drill holes intersecting Zone 1 open pit Ni resource Sample Depth Below Drillhole ID Depth From Depth To Ni^ Cu Interval Surface meters meters meters meters % % Z017 37.43 412.75 375.32 23.61 0.24 0.01 including 38.00 110.00 72.00 23.97 0.25 0.01 including 124.00 13
Slide 14: Zone 2 - Drill Results
Zone 2 - Drill Results Drill holes intersecting Ni-Cu-PGE bearing lithologies Sample Depth Below 3PGE + Drillhole ID Depth From Depth To Ni^ Cu Pt Pd Rh Au Interval Surface Au* meters meters meters meters % % g/t g/t g/t g/t g/t Z017 412.75 415.00 2.25 260.31 1.67 0.51 0.21 0.41 0.03 0.06 0.71 Z019
Slide 15: Zone 3 – Massive Ni sulphide Mineralization
Zone 3 – Massive Ni sulphide Mineralization The geology of the Project area ticks all the boxes for massive sulphide Ni-Cu-PGE mineralization: • Semi-massive to massive sulphide Ni-Cu-PGE mineralisation has been intersected on the Zeb Project area and neighbouring project areas. • The Uitloop bodies
Slide 16: Zone 4 – Gold Discovery
Zone 4 – Gold Discovery Gold mineralisation related to the close proximity of the Pietersburg Greenstone Belt: • Ore-grade intersections of gold have been found in the northern and southern areas of the Project, 2 km apart • The gold is most likely hydrothermal in origin and remobilised from the adj
Slide 17: Geological Insight from the Last Drilling Program
Geological Insight from the Last Drilling Program Zeb Exploration program has revealed key learnings for the next phase of Resource Drilling. 1. Confirmation of Critical Zone rocks on our Project area. These are the same rocks that are being mined at Ivanhoe’s Platreef Project and Anglo Platinum’s M
Slide 18: Upcoming Catalysts
Upcoming Catalysts • Mining Right to be awarded • Completed an initial GBP £ 300,000 financing to fund • Geophysical interpretation to assist with targeting higher grade targets within Zone 1 and Zone 2, and possibly identify massive sulphide targets (Zone 3); • Drilling results interpretation; • Es
Slide 19: Contact Us
Contact Us Anthony John Zorbas – Chief Executive Officer E-Mail: john@urumetals.com Richard Montjoie – Technical Director E-Mail: rmontjoie@everseed.co.za 19