Endurance Gold Corporation · TSXV:EDG
Endurance Gold — Investor Presentation (November 2021)
41 slides from Endurance Gold's investor presentation, November 2021
Slide 1: North American Focused Project Generator
North American Focused Project Generator November 2021 TSX.V: EDG
Slide 2: Corporate Disclosure
2 Corporate Disclosure The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to
Slide 3: Corporate Snapshot
3 Corporate Snapshot Shares Outstanding 126.6m Market Capitalization (C$0.22 – Sept 23, 2021) C$27m Options (C$0.05 – C$0.34) 6.7m Insiders Warrants (average C$0.37) 7.7m own over 55% Fully Diluted 141.0m Working Capital (June 30, 2021) C$4.0m* * includes marketable securities Robert T. Boyd Richard
Slide 4: Highlights and Plans
4 Endurance Gold Corporation HIGHLIGHTS AND PLANS 100% controlled - Drill-ready Gold Projects - top-ranked jurisdictions. Reliance Gold Project, B.C. – Epizonal Orogenic – 2021 Drilling • Next to a former +4 m ounce producer • Three phases of drilling - highlights - 14.08 gpt Gold over 15.24m • 1.5
Slide 5: Reliance Gold Project
5 Reliance Gold Project Bralorne Camp, Gold Bridge, B.C. 4 hour Summer Drive +4 million ounces of production
Slide 6: Reliance Gold Project, BC Highlights
6 Reliance Gold Project, BC Highlights “Discovery Stage” Gold Project in a productive gold camp. Option for 100% in late 2019 – 2020 & 2021 Programs: 1. 2019/2020 - Locating Historic Data – 1985 to 2008, poor quality data. 2. Magnetics, LiDAR, 3D IP Survey, Soil & Biogeochemical Coverage. 3. Surface
Slide 7: Reliance Gold Project Highlights
7 Reliance Gold Project Highlights Bralorne Camp, Gold Bridge B.C. • Year Round Road accessible. • 4 km by road east of Gold Bridge, BC. – next to +4 m ounce producer • ‘Epizonal’ Orogenic structural hosted Gold-As-Sb, silicification & sulphidization • Eagle Zone 2020/21 RC Drill Intersections – At
Slide 8: Reliance Gold Project Royal Shear
8 Reliance Gold Project Bralorne Camp, Gold Bridge B.C. Iron Carbonate Treasure Alteration Shear Camp Upper Eagle Creek Eagle Shear Vista Imperial Bona Diplomat Grey Rock Carpenter Lake Royal Shear
Slide 9: Priority Targets Discovered – about 1.5 km Trend
9 Reliance Gold Project Priority Targets Discovered – about 1.5 km Trend 3.14 gpt Au over 6.7 m 16.49 gpt Au over 4.6 m 2008 DDH 13.3 gpt Au over 4.2 m 5.89 gpt Au over 31.5 m 4.88 gpt Au over 23.5 m 8.95 gpt Au 6.92 gpt Au over 3.05 m over 13.4 m New As in pXRF
Slide 10: Eagle Zone at Eagle Road – Shallow Dipping Shear Zone
10 Reliance Gold Project Eagle Zone at Eagle 3 Road – Shallow Dipping Shear Zone Structural Top of Horizontal Channel Sample with average 4.88 gpt Gold over 23.5 metres
Slide 11: Reliance Gold Project – 2020 Surface Gold Targets
11 Reliance Gold Project – 2020 Surface Gold Targets
Slide 12: Reliance Gold Project, BC – 2020/2021 RC Drilling
12 Reliance Gold Project, BC – 2020/2021 RC Drilling 1. Completed 51 RC Drill Holes in late 2020 and spring 2021. 2. Complete Gold Assay results from spring program received in June 2021. 3. Significant gold intersections in 41 of the 51 RC holes with some Excellent results (gold over greater than 3
Slide 13: Reliance Project – Eagle – RC Drilling Gold Results
13 Reliance Project – Eagle – RC Drilling Gold Results 8.95 gpt Au over 3.05 m OPEN
Slide 14: Reliance Eagle Zone – 2021 RC Drilling Section 5635816 N
14 Reliance Eagle Zone – 2021 RC Drilling Section 5635816 N
Slide 15: Reliance Eagle Zone – 2021 RC Drilling Section 5635737 N
15 Reliance Eagle Zone – 2021 RC Drilling Section 5635737 N
Slide 16: Reliance Gold Project, BC – 2021 Diamond Drilling
16 Reliance Gold Project, BC – 2021 Diamond Drilling 1. Completed 22 Diamond Drill Holes in fall 2021. 2. All Gold Assays pending – first results expected in November. 3. 16 Diamond Drill holes at the Eagle Area Targets – majority mineralized • Wide zones of mineralized breccias. • Eagle Zone - doub
Slide 17: Reliance Gold Project – 2021 Longitudinal Section
17 Reliance Gold Project – 2021 Longitudinal Section
Slide 18: Reliance Gold Project – 2021 Eagle Diamond Drill Plan
18 Reliance Gold Project – 2021 Eagle Diamond Drill Plan
Slide 19: NEW Eagle Road – Stibnite & pXRF Arsenic exposures
19 Reliance Gold Project NEW Eagle 5 Road – Stibnite & pXRF Arsenic exposures E4, E5 & E7 Mt. Meager Volcanic Ash 2,400 yrs ago 4000 ppm pXRF Arsenic in bedrock New Road Built over 2 metres (representative grab) in October 2021 area with +100 ppb Au-in-soils
Slide 20: 2021 Drill Core Highlights – Eagle Zone - Assays Pending
20 Reliance Gold Project, BC 2021 Drill Core Highlights – Eagle Zone - Assays Pending Eagle Zone NQ Core Diameter
Slide 21: 2021 Drill Core Highlights – Eagle South Zone - Assays Pending
21 Reliance Gold Project, BC 2021 Drill Core Highlights – Eagle South Zone - Assays Pending NQ Core Diameter
Slide 22: Reliance Gold Project – 2020 Surface Gold Targets
22 Reliance Gold Project – 2020 Surface Gold Targets
Slide 23: Reliance Gold Project – 2021 Longitudinal Section
23 Reliance Gold Project – 2021 Longitudinal Section
Slide 24: Reliance Gold Project – 2021 DDH Imperial Zone
24 Reliance Gold Project – 2021 DDH Imperial Zone
Slide 25: 2021 Drill Core Highlights – Imperial Zone - Assays Pending
25 Reliance Gold Project, BC 2021 Drill Core Highlights – Imperial Zone - Assays Pending DDH 21-009 IMPERIAL ZONE @164.3 m NQ Core Diameter @169m @170.7m
Slide 26: Imperial Zone Drill Cross-Section
26 Reliance Gold Project Imperial Zone Drill Cross-Section @ 060o
Slide 27: Reliance Gold Project – 2021/2020 Surface Gold Targets
27 Reliance Gold Project – 2021/2020 Surface Gold Targets
Slide 28: Reliance Gold Project, BC Option Deal Terms
28 Reliance Gold Project, BC Option Deal Terms Option to own 100% The following optional payments and exploration obligations are required prior to December 31, 2025: 1. C$300,000 cash. ($260,000 remaining) 2. 4 Million Endurance Shares. (3.5 Million remaining) 3. C$3 Million in exploration expendit
Slide 29: Reliance Gold Project, BC Highlights
29 Reliance Gold Project, BC Highlights “Discovery Stage” Gold Project in a productive gold camp. Option for 100% in late 2019 – 2020 & 2021 Programs: 1. 2019/2020 - Locating Historic Data – 1985 to 2008, poor quality data. 2. Magnetics, LiDAR, 3D IP Survey, Soil & Biogeochemical Coverage. 3. Surfac
Slide 30: Alaska Gold Projects
ENDURANCE GOLD ALASKA GOLD PROJECTS 30
Slide 31: Tintina Gold Province - Alaska & Yukon
31 Tintina Gold Province - Alaska & Yukon Alaska ranks in the Top 5 in Fraser Institute’s Investment Attractive Index Elephant Mountain Map source: USGS Fact Sheet 2007-3061
Slide 32: Alaska Properties – Road Accessible
32 Alaska Properties – Road Accessible Within the Yukon-Tanana Reduced Intrusive-Related Gold District
Slide 33: Elephant Mountain Gold Project
33 Elephant Mountain Gold Project Yukon River Rampart Elephant Property North, Pump, Central & South Targets Trout - Wolverine Property Hutlinana Hot Springs Eureka
Slide 34: Elephant Mountain Gold Project
34 Elephant Mountain Gold Project
Slide 35: Elephant Mountain Project, Alaska
35 ELEPHANT MOUNTAIN PROJECT, Alaska • Own 100% of Elephant Claims - Option to Earn 100% on Trout Claims • Road and State trail accessible in Central Alaska. – Permitted for Drilling • State Mining Claims • Target Similarity to Fort Knox, Golden Summit, Eagle Deposit (Yukon) • Six intrusive hosted g
Slide 36: Airborne Geophysics – 7200 Hz. Resistivity
36 Elephant Mountain Gold Project Airborne Geophysics – 7200 Hz. Resistivity Granodiorite Intrusive 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 37: Intrusive Hosted - Induced Polarization Anomalies
37 Elephant Mountain Gold Project, Alaska Intrusive Hosted - Induced Polarization Anomalies SW Looking West Northwest NE Diamond Drill Hole Modelled Chargeability (mV/V) 0.4 gpt Gold / 147 m Elephant Mtn. includes 0.63 gpt Gold / 48.2 m Fault Zone Deeper Oxidation? & Covered Area North Zone Pump Zon
Slide 38: Chargeability (50m dipole) – N2
38 Elephant Mountain Gold Project Chargeability (50m dipole) – N2 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Elephant Mtn. Fault Zone Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 39: Elephant Mountain Gold Project – Area Geology
39 Elephant Mountain Gold Project – Area Geology Option to 100% South Wolverine Fork Up to 11.65 gpt Gold Zone Up to 11.98 gpt Gold Trout Peak Zone Up to 23 gpt Gold North, Pump & Central Zone IP Chargeability High Anomalies South Zone Drilling: 4.1 gpt Gold over 4.6 m 100% Owned Gold-in-Soil Anomal
Slide 40: Ownership - Option Terms
40 Elephant Mountain Gold Project Eureka – Manley Hot Springs District, Alaska OWNERSHIP - OPTION TERMS 100% Vested on Elephant - Option for 100% on Trout/Wolverine Remaining obligations for the Trout deal include: • Total US$140,000 cash by December 2024 • 200,000 Endurance shares by December 2022
Slide 41: www.endurancegold.com
www.endurancegold.com Robert T. Boyd, P.Geo. is a qualified person as defined in National Instrument 43-101 and supervised the compilation of the information forming the basis for this summary. Suite 520 – 800 West Pender Street Vancouver, BC V6C 2V6 Canada Toll Free Phone: 877-624-2237
Endurance Gold — Investor Presentation (November 2021) on 6ix