Metal Bank Ltd · ASX:MBK

Metal Bank — Investor Presentation (November 2015)

26 slides from Metal Bank's investor presentation, Nov 12, 2015

  1. Slide 1: Copper and Gold Projects Exploration Update

    COPPE R AND GOLD PROJE CTS E XPLORATION UPDATE NOV E MBE R 2015 ASX: M BK

  2. Slide 2: Disclaimer

    Disclaimer Purpose of this document This presentation has been prepared by Metal Bank Limited (“MBK") for general information purposes only using the information available to MBK at the time of publication. No reliance The information contained in this presentation is not investment, tax, accounting

  3. Slide 3: Corporate Overview

    Corporate Overview Metal Bank Limited 12 month share chart ASX: MBK 0.02 shares 354.2M 0.01 options 15M 3M share price* $0.007 1M cash at bank** $0.3M market cap $2.5M Board and Management *as at 11 November 2015 Ines Scotland Chair **as at 30 September 2015 Tony Schreck Executive Director Directors

  4. Slide 4: Our Business is Copper and Gold

    Our Business is Copper and Gold discovery and development High grade copper in a World Class 13Mt copper district, Nevada, USA Intrusion related gold ± copper in an 18Moz gold district, Eastern Australia

  5. Slide 5: Our Business is Copper and Gold: Copper - USA

    Our Business is Copper and Gold copper - USA Mason Valley Copper Project  World Class copper district  Centered on 4 historical high grade copper mines  Overlooked by modern exploration  Early drilling success by MBK in 2015

  6. Slide 6: Our Business is Copper and Gold: Gold - Australia

    Our Business is Copper and Gold gold - Australia Eastern Australia Gold Projects  18Moz Au district  Triumph and Eidsvold Projects centered on historical high grade gold mines  Two high grade gold discoveries so far  Success via new exploration models

  7. Slide 7: Technical Management Team

    Technical Management Team discovery and development track record Inés Scotland (non-executive Chair)  Over 25 years in the mining industry – Founding shareholder and MD of Citadel through its massive growth during the discovery/development of the Jabal Sayid copper project in Saudi Arabia and $1.3B

  8. Slide 8: Strategy

    Strategy reducing investment risks Target  Metal rich provinces  Pro mining/development jurisdictions Long history of mining Nevada ‘Home of the Carlin style gold deposits’ Extremely attractive mining investment jurisdiction Global Investment Attractiveness - Fraser Institute survey 2014 - Nevada

  9. Slide 9: Mason Valley Copper Project

    Mason Valley Copper Project world class copper district, Nevada Yerington District - 13Mt Cu (12Mt Cu resources + 1Mt Cu production) Major District Players – Freeport/Quaterra JV, Entrée Gold, Nevada Copper Mason Valley Copper Project Pumpkin Hollow Mine (in construction) targeting 33,000t Cu pa ove

  10. Slide 10: Mason Valley Copper Project: High Grade Copper Mines

    Mason Valley Copper Project 4 high grade copper mines Historical Production (1910 to 1931) – closure coincides with Great Depression 4 Historical Mines Total production ~4Mt @ 2.5% to 6% Cu

  11. Slide 11: Mason Valley Copper Project: High Grade Copper in Initial MBK Drilling

    Mason Valley Copper Project high grade copper in initial MBK drilling Bluestone Mine • 42m @ 1.51% Cu from surface incl. 4m @ 3.52% Cu and 7m @ 2.69% Cu Malachite Mine • 16m @ 1.72% Cu from 54m incl. 8m @ 2.75% Cu Mason Valley Mine • Initial holes completed – Results awaited Copper Hill Mine Bluesto

  12. Slide 12: Malachite Mine

    Malachite Mine near surface high grade copper  High grade copper in initial drilling  300m of strike – open at depth  Underground development accessible Bornite Chalcopyrite Underground channel sampling 5m @ 5.22% Cu

  13. Slide 13: Mason Valley Mine

    Mason Valley Mine targeting high grade extensions  No previous drilling  Underground development and stopes still accessible Underground Stoping to 150m to 200m High grade copper ore Initial drilling to test down dip extension of high grade copper mineralisation

  14. Slide 14: Mason Valley Copper Project: Skarns - Vectors to Porphyry Systems

    Mason Valley Copper Project Skarns – vectors to porphyry systems Primary target – high grade copper skarn mineralisation Secondary target – bulk tonnage porphyry copper Use skarns as vectors towards the large porphyry copper systems Anaconda Yerington Pit (1952-1977) driving the system porphyry copp

  15. Slide 15: Triumph Project

    Triumph Project discovery of a large gold system Metal rich district +18Moz Au

  16. Slide 16: Triumph Project: Strategy Paying Off

    Triumph Project strategy paying off  Identified an under-explored historical goldfield covering 1km2 – tenure secured 2010  Results now highlight a gold camp extending over 15km2 of which >90% is concealed by shallow cover (<10m) previously not recognised and precluding past exploration  Explorat

  17. Slide 17: Triumph Project: Limited Previous Drilling

    Triumph Project limited previous drilling High grade gold skirting the central magnetic low Structural Reconstruction Present Day 4m @ 10.5g/t Au from 31m including 1m @ 20.8g/t Au from 31m (NN06RC07) 1m @ 16.6g/t Au from 15m (NRC-16) Bald Hill Bald Hill 9m @ 3.6g/t Au from 114m including 1m @ 21.8g

  18. Slide 18: Eidsvold Project

    Eidsvold Project past production (100,000oz) early 1900’s Metal rich district +18Moz Au

  19. Slide 19: Eidsvold Project: Fertile Intrusive Complex

    Eidsvold Project fertile intrusive complex  100,000oz historical goldfield hosted by intrusive basement exposed through sedimentary cover  Alteration and structural targets defined in a 10km long corridor represent potential intrusive related gold systems  Discovery of intrusion related gold mine

  20. Slide 20: Eidsvold Project: First Mover Advantage

    Eidsvold Project first mover advantage / opportunity  Now opens up 250km2 of virtually unexplored, prospective fertile intrusive complex hosting historical goldfield  Large ground holding secured  Magnetite destruction an important targeting tool  Potential for early success targeting interprete

  21. Slide 21: Mt MacKenzie Project

    Mt MacKenzie Project porphyry target

  22. Slide 22: Mt MacKenzie Project: Cu-Mo Porphyry System

    Mt MacKenzie Project Cu-Mo porphyry system Target – bulk tonnage Cu-Mo ± Au system 3D view – Cu soil data  Cu-Mo porphyry system defined by 1970’s ‘porphyry copper’ exploration – overlooked by modern gold exploration 100 – 500ppm Cu  Cu-Mo typical metal association for many 500 – 1000ppm Cu large

  23. Slide 23: Mt MacKenzie Project: Prospective Metal Zonation Pattern

    Mt MacKenzie Project prospective metal zonation pattern  Gold mineralisation is often found proximal 3D view – Cu soil data to the core in these styles of mineral systems gold target core 100 – 500ppm Cu 500 – 1000ppm Cu 3D view – Mo soil data gold target core from Blevin 2010 Next Steps: Surface s

  24. Slide 24: Summary

    Summary potential for a large prize A portfolio of Copper and Gold projects with excellent short to medium term upside Our Business is  Mason Valley Project – Four overlooked high grade Gold and Copper copper mines  Triumph Project – Targeting the ‘engine room’ of a large system  Eidsvold Project

  25. Slide 25: Looking Ahead

    Looking Ahead project execution and new opportunities  Positioned for Growth (organic and acquisition)  A team solidly grounded in project execution and generation – access to a global network and project opportunities

  26. Slide 26: Metal Bank Limited

    Metal Bank Limited contact us ASX Code: MBK www.metalbank.com.au Tony Schreck Director 0419 683 196 tony@metalbank.com.au

Metal Bank — Investor Presentation (November 2015) on 6ix