Western Gold Resources Ltd. · ASX:WGR
Western Gold Resources — Shareholder Meeting (November 2026)
17 slides from Western Gold Resources's shareholder meeting presentation, Nov 27, 2026

Slide 1: Gold Duke Project AGM Presentation
personal use only Gold Duke Project Shallow oxide gold project in Western Australia's Goldfields with expanded 55,500oz production target AGM Presentation November 2026 ASX: WGR | westerngoldresources.com.au

Slide 2: Important Notice and Disclaimer
Important Notice and Disclaimer personal use only Important Information and Disclaimer Forward Looking Statements Previously Reported Results Western Gold Resources Limited (“WGR”, “Western Gold Resources” or “the This Presentation may contain forward‐looking statements which can be WGR confirms tha

Slide 3: Investment Thesis
Investment Thesis personal use only Orebody Expanded Scoping Route to Ready to mine Study Economics production • 277,000oz Mineral • Mining approvals granted • A$72.9M undiscounted Resource • Binding Ore Purchase for four principal operating surplus at • 1.11 Mt production target deposits A$6,100/oz

Slide 4: November 2026 Highlights
November 2026 Corporate Update personal use only Ore Purchase Agreement1 A$7.5M Placement2 Board Changes2 • Binding agreement with Forrestania • 93,750,000 shares at A$0.08 in two • David Geraghty, Non-Executive Resources Limited (ASX: FRS) to tranches; Tranche 2 subject to Chairman: metallurgical e

Slide 5: Company Overview
Company Overview personal use only (as at 25 November 2026) Board and Management 8.0c 390.4M $31.2M Placement Pro-forma Pro-forma price3 shares3 Market Cap3 David Geraghty Daniel Cowley- Cullum Winn $6.81M 1 34.25M 2 10.2M 2 Non-Executive Chairman Cooper Non-Executive Managing Director Cash at 25 No

Slide 6: Gold Duke Project
Gold Duke Project personal use only Shallow oxide gold on a 25km greenstone belt • 100% owned, 35km south-west of Wiluna in the north-eastern Goldfields of Western Australia • 25km of strike along the Joyners Find greenstone belt; mineralisation within the Joyners shear zone, in shear-hosted lodes a

Slide 7: Expanded Scoping Study
Expanded Scoping Study personal use only • Expanded scoping study drives 30% uplift in gold production 1 • Resource built on 33,980 m of RC grade control and infill drilling • 18 individual pit designs, adding Gold King South, Comedy King and Joyners Find 1.11 Mt 59,700 oz @ 1.7g/t Au • Re-optimised

Slide 8: Updated Mineral Resource Estimate
Updated Mineral Resource Estimate personal use only Measured Indicated Inferred Total Deposit Tonnes Grade koz Tonnes Grade koz Tonnes Grade koz Tonnes Grade koz (000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s) Gold Duke Project global Measured, + LOM Extension Eag

Slide 9: Resource Growth
Resource Growth personal use only ~12,000m LOM Extension Drilling from Early 2027 • ~12,000m RC LOM Extension drilling at Emu, Eagle, Joyners Find and Gold King South, funded by the Placement, to start early in 2027. • Mineralisation at Emu, Eagle and Gold King open along strike and at depth. • Stag

Slide 10: Mine Plan
Mine Plan personal use only • 18 pit designs across Eagle, Emu, Golden Monarch (ten pit areas), Gold King, Gold King South, Comedy King and Joyners Find • Pit depths 17 m to 65 m; Golden Monarch averages 25m • 21 months of mining, 23 months of processing; total movement 6.85 million bcm (0.45 millio

Slide 11: Processing Route
Processing Route personal use only • Binding Ore Purchase Agreement with Forrestania Resources for the purchase and processing of Gold Duke ore at the Edna May Processing Plant, near Westonia 1 • Key terms: ─ 30-month term; cap of 1.1 Mt of ore, in campaigns of 45,000t to 100,000t ─ Price set by for

Slide 12: Stage 1 – Mining Fully Approved
Stage 1 – Mining Fully Approved personal use only • Stage 1 of the Gold Duke Project has already received full mining approvals for all 18 open pits - Eagle, Emu, Comedy King, Gold King, Joyners Find and Golden Monarch - paving the way for operational commencement 1 • Stage 1 production will focus o

Slide 13: Stage 1 – Production Target by Pit
Stage 1 – Production Target by Pit1 Golden personal use only Monarch Pits Emu Pit Contained Gold Recovered Gold Target Tonnes (kt) Grade (g/t Au) (koz) (koz) Comedy King Pits 16.1 1.7 0.8 0.7 Eagle Pits Eagle Pits 293.9 1.7 16.7 15.5 Emu Pit 91.8 1.4 4.2 3.9 Gold King Pits 414.0 1.6 23.0 21.4 Joyner

Slide 14: Stage 2 – Northern Extensions
Stage 2 – Northern Extensions personal use only Stage 2 Northern Brownfields Prospects • Historical Gold Duke database review identified additional near-mine opportunities to increase contained ounces and upgrade resources to Measured and Indicated classification • Most prospects lie within the DEMI

Slide 15: Path to Cash Flow
Path to Cash Flow personal use only • Processing route − Binding Ore Purchase Agreement with Forrestania for processing at Edna May; Wiluna toll milling agreement remains in place • Funding − A$7.5M two-tranche Placement at A$0.08 with a A$5.5M Forrestania cornerstone (Tranche 2 subject to sharehold

Slide 16: Investment Summary
Investment personal use only Summary 55,500 oz recovered Binding Ore Purchase 277,000 oz Agreement with production target Forrestania Mineral Resource A$7.5M Placement with Site establishment A$72.9M undiscounted Forrestania cornerstone planned before end of operating surplus (Wiluna 2026 case) ~12,

Slide 17: For more information contact
personal use only For more information contact Cullum Winn | Managing Director E: cullumw@westerngoldresources.com.au ASX: WGR | westerngoldresources.com.au
Source: ASX announcement, Nov 27, 2026
More decks from Western Gold Resources Ltd.
Investor Presentation (October 2026)16 slides · Oct 14, 2026
121 Mining Investment Conference (March 2026)18 slides · Mar 10, 2026
Investor Presentation (March 2026)17 slides · March 2026
Shareholder Meeting (March 2026)12 slides · Mar 1, 2026
Investor Presentation (October 2025)17 slides · Oct 13, 2025
Corporate Update (June 2025)17 slides · Jun 19, 2025