Western Gold Resources Ltd. · ASX:WGR

Western Gold Resources — Shareholder Meeting (March 2026)

12 slides from Western Gold Resources's shareholder meeting presentation, Mar 1, 2026

  1. Slide 1: AGM Presentation

    AGM Presentation CEO Cullum Winn

  2. Slide 2: Important Information and Disclaimer

    Important Information Forward Looking Statements Compliance statement This Presentation may contain forward‐looking statements Information relating to the mineral resource estimates and and Disclaimer which can be identified by forward‐looking terminology, production targets contained in this Presen

  3. Slide 3: Company Overview

    Company Overview Board and Management Share Price Gary Lyons Warren Teck Siong Cullum Winn Non-Executive Thorne* Wong Chief Executive Chairman Officer Managing Non-Executive Director Director Capital Structure Share price (at 28 Nov 2024) $0.029 Shares on issue 170,355,053 Market capitalisation (ful

  4. Slide 4: Gold Duke Project

    Gold Duke Project WGR flagship project, 100%-owned “Shovel-ready” – all mining approvals in place for four pits that comprise stage one Multiple mills within 150km radius Closest is Wiluna, which has operated continuously since Wiluna Mining went into administration mid-2022 Discussions underway on

  5. Slide 5: Gold Duke Project Resource

    Gold Duke Project Resource Updated Resource Gold Duke Measured Indicated Inferred Total Project global Measured, Deposit Tonnes Grade koz Tonnes Grade koz Tonnes Grade koz Tonnes Grade koz (000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s) Indicated, and Inferred (JO

  6. Slide 6: Gold Duke Scoping Study

    Gold Duke Scoping Study Completed by Snowden Optiro in Emu Pit September 2024 Based on 51% of the total Gold Duke Eagle Pits Mineral Resource (2.9Mt @ 2.07 g/t Au for 235,000 oz)1 Using a $3,500/oz gold price and a $60/t toll treatment charge, a Production Target of 447Kt at 2.55 g/t Au for 34,000 o

  7. Slide 7: Sensitivity to Gold Price

    Sensitivity to Gold Price Scoping Study included sensitivity analysis assessing the impact of the gold price on Production Target estimates by 70 generating optimal pits for a 60 range of gold prices from 50 $3,000/oz to $4,000/oz1. Operating Profit (A$M) 40 At a gold price of $4,000/oz, the 30 Prod

  8. Slide 8: Metallurgical Testwork

    Metallurgical Testwork Metallurgical testwork completed Grind Au Extraction (%) Au Grade (g/t) Reagents (kg/t) Size on each prospect3 highlights Comp ID P80 Gravity 2-HR 4-HR 8-HR 24-HR 36-HR 48-HR Assay Head Calc'd Head FA Tail AR Tail NaCN Lime (µm) potential for excellent gold Emu 106 14.6 86.0 9

  9. Slide 9: Indicative Project Schedule

    Indicative Project Schedule Current Works Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Toll Treatment Agreement Updated Pricing Gold King Model Grade Control Stage 1 Update Resource Modelling (Includes Stage 2 Approvals Drilling) Re-Optimisation + Mine Design + Mine Schedule Updat

  10. Slide 10: Project Upside

    Project Upside Stage 1 Upcoming resource and grade control drilling to assist in optimising pits and mine schedule Results will inform an updated scoping study Stage 2 Focus will also be on filling gaps in historical drilling to build resource inventory Key information will also be collected for min

  11. Slide 11: Progressing Gold Duke Makes Sense

    Progressing Gold Duke Makes Sense Gold price at Modest capital Approvals in Key stakeholders record highs requirement place supportive Short time frame Cashflow to to production fund growth AGM PRESENTATION

  12. Slide 12: Thank You

    Thank You Level 4, 46 Colin Street West Perth Western Australia 6005